AARoads Forum

Regional Boards => Pacific Southwest => Topic started by: bing101 on June 16, 2014, 10:51:53 AM

Title: Work To Begin Late Summer At Highway 140 Rock Slide
Post by: bing101 on June 16, 2014, 10:51:53 AM
http://www.capradio.org/articles/2014/06/16/work-to-begin-late-summer-at-highway-140-rock-slide/

How will CA_140 be rockslide reduced?
Title: Re: Work To Begin Late Summer At Highway 140 Rock Slide
Post by: andy3175 on June 17, 2014, 11:40:41 PM
The numbers on the Ferguson Rock Slide are fairly staggering (per the article and video):


This project will result in the removal of the temporary, one-lane bridge that serves as the temporary route of SR 140 and also result in the installation of a rock shed to protect the highway.