AARoads Forum

Regional Boards => Great Lakes and Ohio Valley => Topic started by: I-39 on March 13, 2015, 07:14:03 PM

Title: Which section of U.S 151 in WI will be converted to full freeway first?
Post by: I-39 on March 13, 2015, 07:14:03 PM
The part between Madison (I-39/90/94) and Fond Du Lac (I-41)

OR

The route between Madison (Beltline) and Dubuque?


Both have long range plans to convert the expressway portions to freeway.
Title: Re: Which section of U.S 151 in WI will be converted to full freeway first?
Post by: SSOWorld on March 14, 2015, 05:01:56 AM
Neither.  The traffic count is not high enough for it.
Title: Re: Which section of U.S 151 in WI will be converted to full freeway first?
Post by: tchafe1978 on March 14, 2015, 11:00:03 PM
WisDOT isn't studying the whole stretch of US 151 on either side of Madison for conversion to freeway. Only the segments from Verona to Dodgeville and from Columbus to Waupun are being studied. The most you'll likely see for years are spot improvements. The segments from Dodgeville to Dubuque and Waupun to Fond du Lac are fine as is.
Title: Re: Which section of U.S 151 in WI will be converted to full freeway first?
Post by: Revive 755 on March 15, 2015, 01:30:40 PM
Over the long term, I would bet on the Madison to Fond du Lac segment being fully upgraded first.  It has a greater population on the non-Madison end and the towns in between appear to be bigger than the Dubuque-Madison segment.
Title: Re: Which section of U.S 151 in WI will be converted to full freeway first?
Post by: I-39 on March 15, 2015, 02:41:12 PM
Quote from: tchafe1978 on March 14, 2015, 11:00:03 PM
WisDOT isn't studying the whole stretch of US 151 on either side of Madison for conversion to freeway. Only the segments from Verona to Dodgeville and from Columbus to Waupun are being studied. The most you'll likely see for years are spot improvements. The segments from Dodgeville to Dubuque and Waupun to Fond du Lac are fine as is.

They don't have a study out right now, but they do have long range plans in the Connections 2030
Title: Re: Which section of U.S 151 in WI will be converted to full freeway first?
Post by: I-39 on March 15, 2015, 02:46:34 PM
Quote from: Revive 755 on March 15, 2015, 01:30:40 PM
Over the long term, I would bet on the Madison to Fond du Lac segment being fully upgraded first.  It has a greater population on the non-Madison end and the towns in between appear to be bigger than the Dubuque-Madison segment.

I agree, and even if Madison to Dubuque is finished, they'll need to fix the interchange at the Beltline, which will not happen until after 2030 according to WisDOT
Title: Re: Which section of U.S 151 in WI will be converted to full freeway first?
Post by: JREwing78 on March 15, 2015, 11:50:50 PM
The section between Waupun and Fond du Lac will not have traffic warranting a freeway conversion for many years; the Waupun to Oshkosh section of Hwy 26 carries more traffic. The section between Dodgeville and Dickeyville isn't exactly a high-traffic location either.

Bold prediction: neither one within the next 30 years.
Title: Re: Which section of U.S 151 in WI will be converted to full freeway first?
Post by: SEWIGuy on March 16, 2015, 09:31:56 AM
Quote from: JREwing78 on March 15, 2015, 11:50:50 PM
The section between Waupun and Fond du Lac will not have traffic warranting a freeway conversion for many years; the Waupun to Oshkosh section of Hwy 26 carries more traffic.

Not according to WIDOT maps.

Just past the easternmost interchange, 12,000 use US-151 and 8,000 use WI-26
Title: Re: Which section of U.S 151 in WI will be converted to full freeway first?
Post by: SSOWorld on March 16, 2015, 08:55:37 PM
Packer games see WIS-26 lined up with traffic to get onto 41 NB from points southwest quite a bit.