Regional Boards => Canada => Topic started by: Stephane Dumas on August 30, 2009, 09:24:40 AM

Title: WE (Windsor-Essex) Parkway to start in fall
Post by: Stephane Dumas on August 30, 2009, 09:24:40 AM
I spotted it on Canroads, works on the Windsor-Essex parkway (a western extension of Hwy 401 to the Detroit River to a new proposed bridge) will start this fall, here the official site http://www.weparkway.ca/ (http://www.weparkway.ca/)
Title: Re: WE (Windsor-Essex) Parkway to start in fall
Post by: njroadhorse on August 30, 2009, 10:56:49 AM
So Highway 401 will get even longer with this parkway?  :colorful:
Title: Re: WE (Windsor-Essex) Parkway to start in fall
Post by: Stephane Dumas on August 30, 2009, 11:33:25 AM
Yes, down to the Detroit River
Title: Re: WE (Windsor-Essex) Parkway to start in fall
Post by: vdeane on August 30, 2009, 02:32:39 PM
Has this extension always been planned or is it recent?  I've found it odd that 401 starts its exit numbers/distance posts at km 13.

Glad to see it's finally starting.
Title: Re: WE (Windsor-Essex) Parkway to start in fall
Post by: froggie on August 30, 2009, 04:52:56 PM
Getting 401 to some sort of border crossing has always been planned (hence the exit numbers/KM-posts beginning at 13).  This particular project is much more recent, though.
Title: Re: WE (Windsor-Essex) Parkway to start in fall
Post by: vdeane on August 31, 2009, 05:54:19 PM
I wonder why they didn't just build it to a border crossing from the start.  It's not like it would have been a huge addition.
Title: Re: WE (Windsor-Essex) Parkway to start in fall
Post by: Bickendan on September 03, 2009, 03:43:55 AM
I'd imagine it was the US side that couldn't decide where to have the crossing.
Title: Re: WE (Windsor-Essex) Parkway to start in fall
Post by: vdeane on September 03, 2009, 05:11:22 PM
They could have had it connect to an existing crossing (though a new crossing might have been part of the plan).
Title: Re: WE (Windsor-Essex) Parkway to start in fall
Post by: Hellfighter on November 01, 2009, 01:25:53 PM
I wonder how the Bridge Dispute will alter the Crossing plans, if at all?
Title: WE (Windsor-Essex) Parkway consortium selected
Post by: rawmustard on November 05, 2010, 10:00:13 AM
An announcement is expected this morning (http://www.windsorstar.com/news/Team+tapped+Windsor+Essex+Parkway+project/3780242/story.html) regarding the selection of the consortium that will build this project. The provincial government promises groundbreaking by next August. One hundred residential and commercial structures have already been demolished in preparation for the highway, with a total of 300 to be removed.
Title: Re: WE (Windsor-Essex) Parkway to start in fall
Post by: haljackey on March 18, 2011, 02:48:16 PM
New Windsor-Essex Parkway signs erected along Highway 3 in Windsor:

(https://www.aaroads.com/forum/proxy.php?request=http%3A%2F%2Ffarm6.static.flickr.com%2F5294%2F5534997721_af8d83b47c_b.jpg&hash=1038ebccb8f54cdde28c803121a4a941176c65ee)

(https://www.aaroads.com/forum/proxy.php?request=http%3A%2F%2Fimg339.imageshack.us%2Fimg339%2F3349%2F553557869824f6c331bdb.jpg&hash=91b2446e486b6d0746e2592050bf4bf93208e8a2)

Propaganda much? :lol:
Title: Re: WE (Windsor-Essex) Parkway to start in fall
Post by: rawmustard on March 19, 2011, 06:50:35 AM
Quote from: haljackey on March 18, 2011, 02:48:16 PM
New Windsor-Essex Parkway signs erected along Highway 3 in Windsor:
{snip images}
Propaganda much? :lol:

It almost reminds me of the Burma-Shave campaign if they were able to get a fourth sign to rhyme with the second.
Title: Re: WE (Windsor-Essex) Parkway to start in fall
Post by: NE2 on March 19, 2011, 05:13:17 PM
easing traffic flow / creating jobs / get out and dig / you lazy slobs / BURMA SHAVE