Regional Boards => Canada => Topic started by: ghYHZ on September 06, 2015, 06:37:58 PM

Title: TCH104 Antigonish Bypass – 2015 Update
Post by: ghYHZ on September 06, 2015, 06:37:58 PM
It's been 3 years since Phase I of the TCH104 Antigonish Bypass opened in 2012 and it will be another year until Phase II is ready in Fall 2016.....extending an additional 7.5 km to Taylors Road.

This is the current start/end of Phase I just east of Exit 33 at Beech Hill Road. In the second photo.....this short 0.4km section connecting down the hill to the original alignment, including the overhead will be removed when the bypass in complete....then returned to a green field.


(https://lh3.googleusercontent.com/-stpobYXoMTY/VeyypgoA_-I/AAAAAAAAPKk/kShJc4NWxk8/s800-Ic42/IMG_5012.JPG)

(https://lh3.googleusercontent.com/-zLdJOTPUYbY/Veyx8g6wQpI/AAAAAAAAPJY/lkPo_0d_vdU/s800-Ic42/IMG_4999.JPG)


New alignment (below) between Phase 1 and II (overhead sign above is to the right)


(https://lh3.googleusercontent.com/-9ZKOVWA2P38/VeyypbkrsFI/AAAAAAAAPKg/6xxISNJDZ9g/s800-Ic42/IMG_5016.JPG)


This section of TCH104 cutting across the photo (below) will be removed, becoming Truck 4 and relocated to the overpass structure in the distance.


(https://lh3.googleusercontent.com/-7vw_fRtMiWQ/Veyy4SEZ_DI/AAAAAAAAPLI/DkzQ1QFaWLE/s800-Ic42/IMG_5020.JPG)

(https://lh3.googleusercontent.com/-zU2oqH9lFdw/VeyywiUeDDI/AAAAAAAAPK4/-5-wbvl_acA/s800-Ic42/IMG_5018.JPG)

(https://lh3.googleusercontent.com/-2gSu5YPy5S4/Veyy-dr_YSI/AAAAAAAAPLc/cRIVfF7P9l0/s800-Ic42/IMG_5023.JPG)

(https://lh3.googleusercontent.com/-cn4iBLZsTKM/VeyyN9kDU9I/AAAAAAAAPJ8/1iT8vGVqc-0/s800-Ic42/IMG_5004.JPG)


Below is the new structure at Exit 34 in Lower South River. It will be the jct with Route 316.


(https://lh3.googleusercontent.com/-X5LRbb5hhYE/VeyyFPUQjVI/AAAAAAAAPJk/4n5VLfkEbE0/s800-Ic42/IMG_5002.JPG)

(https://lh3.googleusercontent.com/-v1jSVfsGWeM/Veyx8wJKj1I/AAAAAAAAPJc/LBygzZiF8hg/s800-Ic42/IMG_5000.JPG)

Title: Re: TCH104 Antigonish Bypass – 2015 Update
Post by: SignGeek101 on September 06, 2015, 07:29:43 PM
Nice pictures. I always love seeing road construction photos, so thanks. Is there a phase III or is this it for the 104 for now?
Title: Re: TCH104 Antigonish Bypass – 2015 Update
Post by: ghYHZ on September 06, 2015, 07:51:10 PM
Quote from: SignGeek101 on September 06, 2015, 07:29:43 PM
Nice pictures. I always love seeing road construction photos, so thanks. Is there a phase III or is this it for the 104 for now?

Phase II is all for now. Probably the next section will be to fill in the 40 km gap between Sutherlands River and the start of Phase I west of Antigonish. It's being discussed as a possible Toll Highway.....but probably several years away
Title: Re: TCH104 Antigonish Bypass – 2015 Update
Post by: Transportfan on October 01, 2015, 11:07:09 AM
The Streetview car just drove the bypass. It's pleasantly busy too. A good harbinger for further extension!

https://www.google.ca/maps/@45.6097136,-61.9739381,3a,37.5y,253.75h,86.67t/data=!3m7!1e1!3m5!1szHUQ3eCuVCLY8SzSBrhLuA!2e0!6s%2F%2Fgeo0.ggpht.com%2Fcbk%3Fpanoid%3DzHUQ3eCuVCLY8SzSBrhLuA%26output%3Dthumbnail%26cb_client%3Dmaps_sv.tactile.gps%26thumb%3D2%26w%3D203%26h%3D100%26yaw%3D123.50913%26pitch%3D0!7i13312!8i6656?hl=en
Title: Re: TCH104 Antigonish Bypass – 2015 Update
Post by: SignGeek101 on October 05, 2015, 11:57:57 PM
Quote from: Transportfan on October 01, 2015, 11:07:09 AM
The Streetview car just drove the bypass. It's pleasantly busy too. A good harbinger for further extension!

https://www.google.ca/maps/@45.6097136,-61.9739381,3a,37.5y,253.75h,86.67t/data=!3m7!1e1!3m5!1szHUQ3eCuVCLY8SzSBrhLuA!2e0!6s%2F%2Fgeo0.ggpht.com%2Fcbk%3Fpanoid%3DzHUQ3eCuVCLY8SzSBrhLuA%26output%3Dthumbnail%26cb_client%3Dmaps_sv.tactile.gps%26thumb%3D2%26w%3D203%26h%3D100%26yaw%3D123.50913%26pitch%3D0!7i13312!8i6656?hl=en

Looks nice. Always wanted to go down east (I haven't been farther east in Canada than Levis Quebec). Some day I will.