The realignment/ straightening of AR 25 near Conway has been completed (well, mostly). Exit signs along I-40 have been upgraded to AR 25 Salem Rd. EB 40, there is one exit. WB 40 it's Exits 124 A and 124B. 124A is North 25; 124B is South 25 where it connects to US 64.
The new section is 4 lanes with a median. The only work left to be done is removing part of old 25 where it connects to the new road, basically taking out a curve and straightening the connection.
That's Great!
Good to see progress on Future US 266 made.