There are two short sections of US-41, one along the Wabash River and around the far-northern part of Terre Haute (https://www.google.com/maps/@39.5316762,-87.3603814,13z) and the other east of Veedersburg (https://www.google.com/maps/@40.1214182,-87.2298621,13.75z) in Indiana, as well as a very short section of US-36 in Vermillion County (https://www.google.com/maps/@39.7949729,-87.4053849,15.75z) at the US-36/IN-63 interchange, that are four-lane divided highways. As far as I know, there are no plans and no need for US-36 in west-central Indiana to be four-laned in the foreseeable future, and there isn't any need to four-lane US-41 between Terre Haute and the northern terminus of IN-63, because IN-63 is the north-south four-lane divided highway corridor through west-central Indiana.

I have a few questions about these divided highway stubs:
Title: Re: Three divided highway stubs in west-central Indiana
Post by: Avalanchez71 on February 01, 2018, 01:40:56 PM
I still think that they should number SR 63 as US 41W or for the folks that don't like those directional suffixes how about US 41A.
Title: Re: Three divided highway stubs in west-central Indiana
Post by: Moose on February 07, 2018, 04:16:15 PM
Quote from: Avalanchez71 on February 01, 2018, 01:40:56 PM
I still think that they should number SR 63 as US 41W or for the folks that don't like those directional suffixes how about US 41A.

There are huge signs up telling people to take 63
Title: Re: Three divided highway stubs in west-central Indiana
Post by: westerninterloper on February 07, 2018, 06:14:53 PM
I've never heard of plans to 4-lane US-41 north of Terre Haute. The sections you mentioned were likely built as part of the construction of I-74 in Veedersburg, and SR 63 north of Terre Haute. I think the Terre Haute section was completed in the mid 1960s.

I've not seen or heard of any plans for US 36.
Title: Re: Three divided highway stubs in west-central Indiana
Post by: Revive 755 on February 07, 2018, 09:31:23 PM
Quote from: Aaron Camp on February 01, 2018, 10:13:00 AM
There are two short sections of US-41, one along the Wabash River and around the far-northern part of Terre Haute (https://www.google.com/maps/@39.5316762,-87.3603814,13z) and the other east of Veedersburg (https://www.google.com/maps/@40.1214182,-87.2298621,13.75z) in Indiana, as well as a very short section of US-36 in Vermillion County (https://www.google.com/maps/@39.7949729,-87.4053849,15.75z) at the US-36/IN-63 interchange, that are four-lane divided highways.

To me these look more like short stretches of four lane highways built where there is slightly more traffic anticipated than the stubs of a route where future extensions of the four lane sections were planned.  When first reading the post I was thinking these had evidence more along the lines of the stub on MO 79 north of I-70:  Aerial (https://www.google.com/maps/@38.8206649,-90.6564516,225m/data=!3m1!1e3?hl=en).  Streetview (https://www.google.com/maps/@38.8200958,-90.6560741,3a,60y,90t/data=!3m6!1e1!3m4!1sCKLX_RXx-H9IU1hmInmHNA!2e0!7i13312!8i6656?hl=en)
Title: Re: Three divided highway stubs in west-central Indiana
Post by: Moose on February 08, 2018, 08:35:50 AM
At least with the southern most section, it was to replace the obnoxious diagonal route thru north Terre Haute known as Lafayette Ave. I believe it was completed before they did IN 63
Title: Re: Three divided highway stubs in west-central Indiana
Post by: Captain Jack on February 10, 2018, 11:23:00 AM
Referencing a 1976 Indiana road map, the 4 lane section of US 41 north from Terre Haute was complete, as was the stretch at Veedersburg. IN-63 was only 4-lanes to Clinton, and another small stretch just north of US 36. The rest of this route at this time was still marked as a secondary route, with a few jogs, and US 41 was shown as a primary route.  I am sure most people were still selecting the US 41 route at this time.

My guess is IN-63 was the chosen route for some time. It is a little more direct. The terrain to build is much more favorable than trying to go through Turkey Run. Also, you would have had to build bypasses for Rockville and Attica, where IN-63 doesn't really go through any towns.

Using IN-63 made sense, what doesn't make sense is INDOT's continuing refusal to switch the routes. This was part of a ongoing plan to link Chicago and Evansville with a 4-lane route, it should have the US 41 designation the entire length. INDOT eagerly yanks US routes out of places like South Bend, Ft. Wayne, Indy, even Terre Haute, but can't do it in Rockville.

As for the interchange stubs at Veedersburg and IN-63/US-36, that is a common practice at many interchanges. It helps traffic flow around turning cars, and even if there is no current plans, should the road ever need to be widened, bridge replacement will not be necessary.
Title: Re: Three divided highway stubs in west-central Indiana
Post by: 2trailertrucker on February 16, 2018, 02:51:43 AM
IIRC, The route that is now US 41/IN 63/ IS 41 was planned to be interstate 63.
Title: Re: Three divided highway stubs in west-central Indiana
Post by: Captain Jack on February 16, 2018, 11:52:00 AM
Quote from: Avalanchez71 on February 01, 2018, 01:40:56 PM
I still think that they should number SR 63 as US 41W or for the folks that don't like those directional suffixes how about US 41A.

No, they should simply switch IN-63 and US 41. This isn't Tennessee.