Regional Boards => Northeast => Topic started by: roadman on January 16, 2020, 10:38:01 AM

Title: I-391 Chicopee to Holyoke sign update
Post by: roadman on January 16, 2020, 10:38:01 AM
On December 7th, a project (MassDOT Project # 608575) was advertised to replace and update the signs and most structures on I-391 between I-91 in Chicopee and the end of the freeway at Commercial Street in Holyoke.

Of special note is that this project will also replace the 'orphan' button copy signs and structures on MA 33 in Holyoke and South Hadley.

The bid opening is scheduled for Tuesday, April 14th at 2 pm.  Bid documents are not yet available.
Title: Re: I-391 Chicopee to Holyoke sign update
Post by: The Ghostbuster on January 16, 2020, 03:44:09 PM
Are the new signs going to maintain the existing exit numbers, since it has already been determined that the DOT will not change them in the upcoming sequential-to-mileage-based exit renumbering plan?
Title: Re: I-391 Chicopee to Holyoke sign update
Post by: Alps on January 17, 2020, 01:05:13 AM
Quote from: roadman on January 16, 2020, 10:38:01 AM
On December 7th, a project (MassDOT Project # 608575) was advertised to replace and update the signs and most structures on I-391 between I-91 in Chicopee and the end of the freeway at Commercial Street in Holyoke.

Of special note is that this project will also replace the 'orphan' button copy signs and structures on MA 33 in Holyoke and South Hadley.

The bid opening is scheduled for Tuesday, April 14th at 2 pm.  Bid documents are not yet available.
That leaves us nearly 3 months to break in and steal them.
Title: Re: I-391 Chicopee to Holyoke sign update
Post by: roadman on January 17, 2020, 09:23:00 AM
Quote from: The Ghostbuster on January 16, 2020, 03:44:09 PM
Are the new signs going to maintain the existing exit numbers, since it has already been determined that the DOT will not change them in the upcoming sequential-to-mileage-based exit renumbering plan?

That is correct.  New signs will use the current exit numbers.
Title: Re: I-391 Chicopee to Holyoke sign update
Post by: RobbieL2415 on January 20, 2020, 11:32:04 PM
Could they also resurface it?  It's in rough shape.
Title: Re: I-391 Chicopee to Holyoke sign update
Post by: bob7374 on April 18, 2020, 11:39:43 AM
MassDOT has posted the bids for the I-391 sign replacement project. The lowest bid was, surprise, by Liddell Bros. at $2.93 million as compared to Northeast Traffic Control at $2.98 million and RoadSafe Traffic Systems at $3.54 million.

Prior to the bid opening on 4/14, a new set of revised sign plans was posted on the CommBuys bid solicitation page. I speculated perhaps this was because there was a late decision to scrap the planned continuation of the sequential exit numbers for I-391 and go with milepost versions. This was not the case, however. I did go ahead and downloaded most of the plans and have posted images of some of them, like this for the southbound MA 141 exits:
(https://www.aaroads.com/forum/proxy.php?request=http%3A%2F%2Fwww.malmeroads.net%2Fmass21c%2Fi391signplanexits4a4b.jpg&hash=619b8895bef8c85419a3b81a18fa2a6cebe3470d)

on my I-391 exit lists page: http://www.malmeroads.net/mass21c/i391exits.html (http://www.malmeroads.net/mass21c/i391exits.html)
Title: Re: I-391 Chicopee to Holyoke sign update
Post by: bob7374 on June 19, 2020, 11:13:14 AM
According to the MassDOT project listing, the notice to proceed for the I-391 sign replacement project was given on May 28.