Regional Boards => Pacific Southwest => Topic started by: Plutonic Panda on October 07, 2022, 09:50:34 PM

Title: Our Future 101 Ventura Project
Post by: Plutonic Panda on October 07, 2022, 09:50:34 PM
This project will add an HOV lane and modernize the freeway with various ancillary improvements as well. It spans from SR-23 to SR-33 in Ventura County and could cost as much as $2 billion dollars and take until 2040 to complete. If funding becomes available sooner the project maybe expedited.

(https://www.aaroads.com/forum/proxy.php?request=http%3A%2F%2Fwww.ourfuture101.org%2Fwp-content%2Fuploads%2F2019%2F04%2FOur-Future-101-Corridor-Map-ver01.jpg&hash=425a23ade595099e9bf8d4494200945ed9d4e7b8)

Project website: http://www.ourfuture101.org/
Title: Re: Our Future 101 Ventura Project
Post by: Plutonic Panda on October 07, 2022, 09:53:06 PM
The preferred alternative should be chosen soon as it says "fall 2022."  Hopefully they can expedite this and get construction started soon. It'd be nice to see at least 2 HOV lanes each way added.
Title: Re: Our Future 101 Ventura Project
Post by: jdbx on October 11, 2022, 01:57:35 PM
That is a huge project. 27 miles, over and through the Conejo grade. That averages out to about $27MM/mile. It's no surprise they are talking about this on a decades scale.
Title: Re: Our Future 101 Ventura Project
Post by: Plutonic Panda on October 11, 2022, 02:07:32 PM
Quote from: jdbx on October 11, 2022, 01:57:35 PM
That is a huge project. 27 miles, over and through the Conejo grade. That averages out to about $27MM/mile. It's no surprise they are talking about this on a decades scale.
I'm skeptical they could add an HOV lane plus ancillary improvements for $2 billion over this length. It seems like that number will end up being closer to $5 billion but we'll see.
Title: Re: Our Future 101 Ventura Project
Post by: Concrete Bob on October 11, 2022, 08:53:41 PM
I am wondering when Caltrans and/or the local authorities decided to not extend the 118 freeway west of SR 23 out to SR 126. 
Title: Re: Our Future 101 Ventura Project
Post by: skluth on October 12, 2022, 02:20:25 PM
Quote from: Plutonic Panda on October 11, 2022, 02:07:32 PM
Quote from: jdbx on October 11, 2022, 01:57:35 PM
That is a huge project. 27 miles, over and through the Conejo grade. That averages out to about $27MM/mile. It's no surprise they are talking about this on a decades scale.
I'm skeptical they could add an HOV lane plus ancillary improvements for $2 billion over this length. It seems like that number will end up being closer to $5 billion but we'll see.

But if they put it on a decades-long timeline, they can say it cost more due to inflation and the numbers we used at the beginning of the project were correct. Proving them wrong would take a lot of investigative work which most people won't care about anyway.

Sorry. Feeling a little more cynical than usual today.
Title: Re: Our Future 101 Ventura Project
Post by: kernals12 on October 19, 2022, 12:25:21 PM
Quote from: Plutonic Panda on October 07, 2022, 09:53:06 PM
The preferred alternative should be chosen soon as it says "fall 2022."  Hopefully they can expedite this and get construction started soon. It'd be nice to see at least 2 HOV lanes each way added.

Ventura County's slow growth probably doesn't warrant 4 extra lanes. They'll probably just restripe an additional 2 lanes
Title: Re: Our Future 101 Ventura Project
Post by: Plutonic Panda on October 19, 2022, 12:31:33 PM
Quote from: kernals12 on October 19, 2022, 12:25:21 PM
Quote from: Plutonic Panda on October 07, 2022, 09:53:06 PM
The preferred alternative should be chosen soon as it says "fall 2022."  Hopefully they can expedite this and get construction started soon. It'd be nice to see at least 2 HOV lanes each way added.

Ventura County's slow growth probably doesn't warrant 4 extra lanes. They'll probably just restripe an additional 2 lanes
Traffic congestion is choking the 101 corridor in Ventura County which is likely contributing to the lack of growth. Hard go grow when infrastructure isn't there to support it.

Regarding the restriping, I wouldn't put it past California to do something ridiculous like that but there are several parts that would need much more work done to widen the road.
Title: Re: Our Future 101 Ventura Project
Post by: SeriesE on October 19, 2022, 07:57:07 PM
Quote from: Plutonic Panda on October 19, 2022, 12:31:33 PM
Quote from: kernals12 on October 19, 2022, 12:25:21 PM
Quote from: Plutonic Panda on October 07, 2022, 09:53:06 PM
The preferred alternative should be chosen soon as it says "fall 2022."  Hopefully they can expedite this and get construction started soon. It'd be nice to see at least 2 HOV lanes each way added.

Ventura County's slow growth probably doesn't warrant 4 extra lanes. They'll probably just restripe an additional 2 lanes
Traffic congestion is choking the 101 corridor in Ventura County which is likely contributing to the lack of growth. Hard go grow when infrastructure isn't there to support it.

Regarding the restriping, I wouldn't put it past California to do something ridiculous like that but there are several parts that would need much more work done to widen the road.

There are many parts that were already widened and only need a restripe to begin using them as new travel lanes
Title: Re: Our Future 101 Ventura Project
Post by: Plutonic Panda on October 19, 2022, 07:59:18 PM
Quote from: SeriesE on October 19, 2022, 07:57:07 PM
Quote from: Plutonic Panda on October 19, 2022, 12:31:33 PM
Quote from: kernals12 on October 19, 2022, 12:25:21 PM
Quote from: Plutonic Panda on October 07, 2022, 09:53:06 PM
The preferred alternative should be chosen soon as it says "fall 2022."  Hopefully they can expedite this and get construction started soon. It'd be nice to see at least 2 HOV lanes each way added.

Ventura County's slow growth probably doesn't warrant 4 extra lanes. They'll probably just restripe an additional 2 lanes
Traffic congestion is choking the 101 corridor in Ventura County which is likely contributing to the lack of growth. Hard go grow when infrastructure isn't there to support it.

Regarding the restriping, I wouldn't put it past California to do something ridiculous like that but there are several parts that would need much more work done to widen the road.

There are many parts that were already widened and only need a restripe to begin using them as new travel lanes
I wouldn't say there are "many"  parts of it. I think of most of it would need to actually widened.
Title: Re: Our Future 101 Ventura Project
Post by: jdbx on October 20, 2022, 01:35:57 PM
Quote from: SeriesE on October 19, 2022, 07:57:07 PM
Quote from: Plutonic Panda on October 19, 2022, 12:31:33 PM
Quote from: kernals12 on October 19, 2022, 12:25:21 PM
Quote from: Plutonic Panda on October 07, 2022, 09:53:06 PM
The preferred alternative should be chosen soon as it says "fall 2022."  Hopefully they can expedite this and get construction started soon. It'd be nice to see at least 2 HOV lanes each way added.

Ventura County's slow growth probably doesn't warrant 4 extra lanes. They'll probably just restripe an additional 2 lanes
Traffic congestion is choking the 101 corridor in Ventura County which is likely contributing to the lack of growth. Hard go grow when infrastructure isn't there to support it.

Regarding the restriping, I wouldn't put it past California to do something ridiculous like that but there are several parts that would need much more work done to widen the road.

There are many parts that were already widened and only need a restripe to begin using them as new travel lanes

That is certainly true in parts of Thousand Oaks: https://www.google.com/maps/@34.1840608,-118.8932769,3a,75y,119.69h,84.31t/data=!3m7!1e1!3m5!1sqME3MW4FB4rWQv16YnUSRg!2e0!6shttps:%2F%2Fstreetviewpixels-pa.googleapis.com%2Fv1%2Fthumbnail%3Fpanoid%3DqME3MW4FB4rWQv16YnUSRg%26cb_client%3Dmaps_sv.tactile.gps%26w%3D203%26h%3D100%26yaw%3D292.0728%26pitch%3D0%26thumbfov%3D100!7i16384!8i8192 (https://www.google.com/maps/@34.1840608,-118.8932769,3a,75y,119.69h,84.31t/data=!3m7!1e1!3m5!1sqME3MW4FB4rWQv16YnUSRg!2e0!6shttps:%2F%2Fstreetviewpixels-pa.googleapis.com%2Fv1%2Fthumbnail%3Fpanoid%3DqME3MW4FB4rWQv16YnUSRg%26cb_client%3Dmaps_sv.tactile.gps%26w%3D203%26h%3D100%26yaw%3D292.0728%26pitch%3D0%26thumbfov%3D100!7i16384!8i8192)
Title: Re: Our Future 101 Ventura Project
Post by: SeriesE on December 28, 2022, 03:55:14 PM
Drove the southbound section recently. The inconsistent number of lanes bugged me a lot while I was driving it.

It changes every couple of exits so it's annoying if I'm keeping to the right except passing
Title: Re: Our Future 101 Ventura Project
Post by: RZF on January 25, 2023, 02:29:14 PM
Between the Conejo Grade and Oxnard Blvd, the traffic is wayyyyy too much, even during non-peak times. Three lanes in both directions cannot sustain the volume of cars that travel both ways. Carpool lanes would help tremendously.