AARoads Forum

Regional Boards => Central States => Topic started by: edwaleni on April 13, 2025, 08:41:41 PM

Title: I-57 in Missouri
Post by: edwaleni on April 13, 2025, 08:41:41 PM
MoDOT contractors have started clearing out the ROW south of Harviell for the new 4 lane US-67 (Future I-57) highway to the Arkansas state line.

This is US-67 looking south, just south of Harviell. All the cleared trees and brush are burning in the background.

(https://live.staticflickr.com/65535/54450112876_3aa559d9b0_b.jpg)

Further south in front of the Baptist Church where they built a new building farther back and the former church was demolished with just a foundation left. More trees to cut down in the foreground.

(https://live.staticflickr.com/65535/54450356108_f89505c3bb_b.jpg)
Title: Re: I-57 in Missouri
Post by: edwaleni on April 13, 2025, 08:57:04 PM
This is part of Phase 1B, which will take the work as far as County Road 338.

(https://live.staticflickr.com/65535/54450342129_16b1c257a2_b.jpg)
Title: Re: I-57 in Missouri
Post by: edwaleni on April 13, 2025, 09:02:53 PM
Build Phase Chart

(https://live.staticflickr.com/65535/54450162316_b742c2dd4c_b.jpg)
Title: Re: I-57 in Missouri
Post by: ilpt4u on April 14, 2025, 07:32:13 AM
https://www.aaroads.com/forum/index.php?topic=14706.0

Yes it existed before the 57 announcement but there is a thread for US 60 and US 67 Freeway upgrades...
Title: Re: I-57 in Missouri
Post by: edwaleni on April 14, 2025, 02:29:36 PM
Quote from: ilpt4u on April 14, 2025, 07:32:13 AMhttps://www.aaroads.com/forum/index.php?topic=14706.0

Yes it existed before the 57 announcement but there is a thread for US 60 and US 67 Freeway upgrades...

Yes, I am aware of that thread, but this one is specific to I-57 construction.

Since Arkansas has "I-49 Arkansas" and Texas has "I-69 Texas" and so forth, I decided to created a thread that is more in line with that naming scheme, to make it easier to locate and contribute.
Title: Re: I-57 in Missouri
Post by: The Ghostbuster on April 14, 2025, 03:27:12 PM
Since the extension of Interstate 57 from its present terminus at Interstate 55 to where it will leave Missouri and enter Arkansas is about 78 miles, I estimate the future exit numbers on existing 57 will be numbered 78AB, 82, 90, and 92.
Title: Re: I-57 in Missouri
Post by: NE2 on April 14, 2025, 03:28:27 PM
Quote from: edwaleni on April 14, 2025, 02:29:36 PM
Quote from: ilpt4u on April 14, 2025, 07:32:13 AMhttps://www.aaroads.com/forum/index.php?topic=14706.0

Yes it existed before the 57 announcement but there is a thread for US 60 and US 67 Freeway upgrades...

Yes, I am aware of that thread, but this one is specific to I-57 construction.
"from Sikeston to Poplar Bluff and from Poplar Bluff to the Arkansas State Line" is pretty specific to I-57.
Title: Re: I-57 in Missouri
Post by: ilpt4u on April 15, 2025, 07:06:17 PM
I will say this thread can involve existing 57 between the Mississippi River and the 55/60/Future 57 Cloverleaf in Sikeston as well as the upgrades to 60 and 67 for Missouri's part of the 57 extension to Little Rock, so that is enough for a new thread I suppose
Title: Re: I-57 in Missouri
Post by: Henry on April 15, 2025, 10:57:10 PM
Quote from: ilpt4u on April 15, 2025, 07:06:17 PMI will say this thread can involve existing 57 between the Mississippi River and the 55/60/Future 57 Cloverleaf in Sikeston as well as the upgrades to 60 and 67 for Missouri's part of the 57 extension to Little Rock, so that is enough for a new thread I suppose
Or maybe we can merge it with the US 60/US 67 freeway thread, since it's all slated to become I-57, and rename the old one accordingly.
Title: Re: I-57 in Missouri
Post by: edwaleni on April 16, 2025, 11:00:23 AM
Quote from: Henry on April 15, 2025, 10:57:10 PM
Quote from: ilpt4u on April 15, 2025, 07:06:17 PMI will say this thread can involve existing 57 between the Mississippi River and the 55/60/Future 57 Cloverleaf in Sikeston as well as the upgrades to 60 and 67 for Missouri's part of the 57 extension to Little Rock, so that is enough for a new thread I suppose
Or maybe we can merge it with the US 60/US 67 freeway thread, since it's all slated to become I-57, and rename the old one accordingly.

I requested a merge under the I-57 title to the moderator.