AARoads Forum

Regional Boards => Central States => Topic started by: mvak36 on January 14, 2017, 04:40:27 PM

Title: MODOT Contract Lettings
Post by: mvak36 on January 14, 2017, 04:40:27 PM
I was inspired by route56's KDOT Letting thread so I am creating one for MODOT lettings. I will try to update them as my work schedule permits, but I will just post links to the PDF's of the Bid Results and the Bid Award Winners when they are awarded. I will also post some notable projects from each letting.

All the information I get is from this link (http://www.modot.org/business/contractor_resources/bid_opening_info/OpenLetting.shtml). For past letting info, users will have to choose the letting date from the drop-down menu that they are looking for since the page always opens to an upcoming letting. The page also will have the proposals, plans, and cross sections (where applicable) for projects.

Previous Lettings (In the interest of time, I'm only putting a few projects from each letting ,if any):

June 24, 2016: Bid Results (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=6298). Bid Award Winners (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=6318)

Notable Projects
Job J4I1980 and Job J4I3038B:I-435 and Route 210 Interchange Project. Resurfacing of 435 from 210 interchange to Parvin Road.
Job J4I3109 and Job J4I3116: I-35 and I-670, respectively. Coldmill and Resurfacing near downtown KC area.
Job J4U1108C: MO-45 widening between I-435 and Route K.

August 9, 2016: Bid Results (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=6338). Bid Award Winners (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=6339)

Only one letting: Grand Ave bridge replacement over I-670.

August 26, 2016: Bid Results (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=6358). Bid Award Winners (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=6378)

September 21, 2016: Bid Results (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=6398). Bid Award Winners (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=6458)

Only one letting: Job J6Q2039F Route 67 St. Louis County. ITS system preservation, repair, and upgrades at the Lindbergh Tunnel.

September 23, 2016: Bid Results (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=6418). Bid Award Winners (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=6438)

Notable Projects
Job J3I3042: I-70. Coldmill and resurface from Jackson County line to Johnson Drive in Odessa.
Job J4I3110: I-470. Resurface from Three Trails Crossing to Raytown Road.
Job J5I3001: I-70 in BOONE County. Coldmill and resurface from MO River to Lake of the Woods Interchange, the total length of improvement being 30.428 miles. (Note to self: Avoid I-70 this summer)
Job J8P2196: US 65 GREENE County. Grading, pavement and bridge 0.2 miles West of Rte. 65 and Chestnut Expressway Interchange.

October 21, 2016: Bid Results (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=6478). Bid Award Winners (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=6479)

Notable Projects
Job J4I3111: I-29 CLAY County. Resurface from Route 35 split to Route 210
Job J4I3170: I-435 JACKSON County. Bridge removal at 83rd Street over I-435
Job J6I3112: I-70 ST LOUIS CITY County. Resurface from east of Union Avenue to Branch Street in St. Louis City, the total length of improvement being 5.343 miles.
Job J7I3072: I-49 MCDONALD County. Resurface and shoulder improvements from Route 59 near Goodman to 1.6 miles south of Route 76 in Anderson, the total length of improvement being 12.936 miles.

The following projects were combined and let as one project:
(1): Job J6I2377C I-64 ST LOUIS CITY County. Grading, pavement and bridge from Sixth Street to Illinois Route 3 Exit, the total length of improvement being 0.772 miles.
(2): Job J6I2377D I-64 ST LOUIS CITY County. Substructure Repair on the Poplar Street Bridge over the Mississippi River near St. Louis City, the total length of improvement being 0.772 miles.
(3): Job J6I3025 Route I-55 ST LOUIS CITY County. Bridge painting on the Poplar Street Bridge over the Mississippi River near St. Louis City, the total length of improvement being 0.418 miles.
(4): Job J6I3026 I-55 ST LOUIS CITY County. Resurface on the Poplar Street Bridge over the Mississippi River near St. Louis City, the total length of improvement being 0.58 miles.

The following projects were combined and let as one project:
(1): Job J7I3075 Route 44 LACLEDE, WEBSTER County. Coldmill and resurface from the Wbester County Line, east of Route 125 in Strafford to 2 miles east of Route Y in Conway, the total length of improvement being 33.82 miles.
(2): Job J7I3099 Route 44 WEBSTER County. High friction surface treatment on the curves at Route B near Northview, the total length of improvement being 1.333 miles.
(3): Job J8I3047 Route 44 GREENE County. Coldmill and resurface from just east of Route 125 in Strafford to the Webster County Line, the total length of improvement being 1.541 miles.

November 18, 2016: Bid Results (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=6499). Bid Award Winners (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=6520)

Notable Projects
Job J4P2256: I-49 JACKSON County. Grading, paving, and bridge at 155th Street near Grandview, the total length of improvement being 0.297 miles. DDI at I-49 and 155th St interchange (http://www.modot.org/kansascity/major_projects/I-49_155th_Interchange.htm).
Job J3I3008: I-70 SALINE County. 2 Bridge deck replacements 1.2 miles west of Rte 127 at Sweet Springs over Davis Creek., the total length of improvement being 0.878 miles.
Job J6I3133: I-70 ST CHARLES County. Coldmill and resurface from Mid Rivers Mall Drive to 5th Street, the total length of improvement being 6.836 miles.
Job J6I3132: I-64 ST LOUIS County. Coldmill and resurface from Chesterfield Airport Road to Route 340, the total length of improvement being 6.059 miles.
Job J7I3049: I-44 LAWRENCE County. Bridge rehabilitation east bound Bridge A09771 over Spring River, the total length of improvement being 0.841 miles.

December 16, 2016: Bid Results (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=6539). Bid Award Winners (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=6559)

Notable Projects
Job J4I3105: I-29 PLATTE County. Resurface from Todd Creek to US 69 near Vivion Road, the total length of improvement being 11.922 miles.
Job J4I3108: I-435 JACKSON County. Resurface from Route 24 to Route 78 in Kansas City, the total length of improvement being 1.64 miles.
Job J6S3183: I-70 ST CHARLES County. Resurface from Route 370 to Zumbehl Road, the total length of improvement being 2.404 miles.
Job J7P3167: Route Various VARIOUS County. Resurface on various routes in the Southwest District, the total length of improvement being 117.944 miles.
Job J8P3049B: US 60 GREENE County. Diamond grinding from Route 13 to Route 65 in Springfield, the total length of improvement being 7.815 miles.

The following four sets of projects were each let as one project (for each set).
(1): Job J4S3136 Route 152 CLAY County. Resurface and ADA improvements from Route 1 to I-35, the total length of improvement being 4.22 miles.
(2): Job J4S3147 Route 152 CLAY County. Resurface and ADA improvements from Route 169 to Route 1, the total length of improvement being 2.256 miles.
(3): Job J4S3149 Route 152 PLATTE County. Resurfacing from I-29 to Route 169, the total length of improvement being 4.09 miles.

(1): Job J5P3056 Route 50 COLE County. Intersection improvements from west of Moreau River near Jefferson City to Lisletown Road, the total length of improvement being 4.493 miles.
(2): Job J5P3127 Route 50 COLE County. Resurface from the Moreau River near Jefferson City to Osage County Line, the total length of improvement being 9.934 miles.

(1): Job J6I3110 Route 55 JEFFERSON County. Resurface from Route Z near Pevely to Ste. Genevieve County line, the total length of improvement being 16.086 miles.
(2): Job J6I3131 Route 55 JEFFERSON County. 21 Bridge rehabilitations from Route Z near Pevely to Plattin Creek south of Crystal City, the total length of improvement being 8.105 miles.

(1): Job J6I3113 Route 270 ST LOUIS County. Resurface from Route 44 to Route 55, the total length of improvement being 5.493 miles.
(2): Job J6I3157 Route 270 ST LOUIS County. Resurface from Route 364 to Route 44, the total length of improvement being 10.693 miles.   

Upcoming Lettings:
January 20, 2017: Bid Results (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=6579). Bid Award Winners (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=6599).
Notable Projects
Job J4P2360: I-49 CASS County. Bridge rehabilitation over South Grand River north of Archie, the total length of improvement being 0.56 miles.
Job J4P3128: MO291 JACKSON County. Resurface and intersection improvements from I-470 to route 50, the total length of improvement being 3.36 miles.
Job J4S3134 Route 7 JACKSON County. Bridge rehabilitation over Route 24 in Jackson County, the total length of improvement being 0.1 miles.
Job J4S3135: Bridge rehabilitation over I-470 at Raytown Road, the total length of improvement being 0.08 miles.
Job J5P3164: US 50 GASCONADE County. Bridge rehabilitation at the Gasconade River near Mount Sterling, the total length of improvement being 0.14 miles.
Job J6M0261: MO141 ST LOUIS County. Bridge rehabilitation at the intersection with Route 70, the total length of improvement being 0.1 miles.
Job J6P3135: MO364 ST CHARLES County. Guardrail and guard cable from Route 64 to Mid Rivers Mall Drive, the total length of improvement being 8.355 miles.   
 
February 17, 2017: Bid Results (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=6619). Bid Award Winners (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=6639).

Notable Projects
Job J4P2292: US 50 JACKSON County. Grading, pavement, signals, signing and ADA improvements at the intersection with Route 291, the total length of improvement being 0.379 miles. Project website (http://www.modot.org/kansascity/major_projects/Route_50_291_Interchange.htm). Another DDI/roundabout project like the I-49/155th St project. Radmacher Brothers Excavating Co., Inc had the winning bid for both DDI projects, the other being the I-49/155th St interchange.
Job J4S3133: MO350 JACKSON County. Bridge redeck and ADA improvements on Bannister Road over MO350 in Lee's Summit, the total length of improvement being 0.027 miles.
Job J4S3148 Route W JACKSON County. Full bridge deck replacement over Blue River Road, the total length of improvement being 0.463 miles.
Job J4P3002: MO291 CASS County. Grading, pavement, drainage and ADA from Waters Road to Royal Street in Harrisonville, the total length of improvement being 0.916 miles.
Job J6I3114: I-44 ST LOUIS County. Coldmill, resurface and guardrail from Route 141 to Route 109, the total length of improvement being 6.964 miles.
Job J6P3062: MO141 ST LOUIS County. Pavement improvements from Rider Trail South to Railroad south of Route 370, the total length of improvement being 2.132 miles.
Job J6P3158: MO100 FRANKLIN, ST LOUIS County. Pavement Improvements from MO 109 to Route OO, the total length of improvement being 7.52 miles.
Job J8P3007D: MO13, 160, 44LP GREENE County. ADA Improvements at Chestnut/West Bypass and Kansas Avenue/Grand Avenue, the total length of improvement being 0.2 miles.
Job J9P3156: US 63 OREGON County. Coldmill and resurface from south of Route F to north of Route 19 near Thayer, the total length of improvement being 6.424 miles.
Job J9P3300: US 60 EB/WB CARTER, HOWELL County. Add rumble strips various locations from Bus. 63 in Willow Springs to County Road 256 in Carter County., the total length of improvement being 44.562 miles.     

The following two sets of projects were let as one project (for each set):
(1): Job J4I3026 Route 35 CLAY County. Grading, paving, and bridges at Route 69 in Liberty, the total length of improvement being 0.301 miles.
(2): Job J4I3036 Route 35 CLAY County. Coldmill, resurface, and guardrail from Fishing River to Pleasant Valley Road, the total length of improvement being 8.3 miles.

(1): Job J8P3048 Route 65 GREENE County. Concrete pavement from Route 744 to Business Route 65 in Springfield, the total length of improvement being 2.066 miles.
(2): Job J8P3079 Route 65 GREENE County. Guardrail from Route 744 to 0.3 mile north of Route D in Springfield, the total length of improvement being 3.496 miles.
(3): Job J8P3081 Route 65 GREENE County. Concrete pavement from Business Route 65 to south of Bennett Street in Springfield, the total length of improvement being 1.275 miles.
Title: Re: MODOT Contract Lettings
Post by: mvak36 on February 09, 2017, 05:10:25 PM
March 24, 2017 Letting: Bid Results (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=6659). Bid Award Winners (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=6680)

Notable Projects: (lots of bridge projects in this letting)
Job J2S3072 Route 161 MONTGOMERY County. Bridge replacement over Cuivre River south of Route T near Middletown, the total length of improvement being 0.305 miles.
Job J3S3052 Route 131 LAFAYETTE County. Bridge deck replacement south of Wellington, the total length of improvement being 0.089 miles.
Job J4P1431 Route 58 JOHNSON County. Bridge replacement over Briar Creek south of Route 50, the total length of improvement being 0.101 miles.
Job J6I3136 Route 270 ST LOUIS, ST LOUIS CITY County. Resurface from I-170 to the Chain of Rocks Bridge, the total length of improvement being 8.016 miles.
Job J6I3197 Route Various ST CHARLES County. Bridge rehabilitation in St. Charles County, the total length of improvement being 0.502 miles.
Job J9P3302 Route 67 ST FRANCOIS, WAYNE County. Bridge rehabilitation on various locations along Route 67, the total length of improvement being 0 miles.

The following eight sets of projects were let as one project (for each set):
(1): Job J2P3082 Route 79 PIKE County. Bridge replacement north of Route D in Louisiana, the total length of improvement being 0.133 miles.
(2): Job J2P3086 Route 79 PIKE County. Bridge replacement south of Route D near Louisiana, the total length of improvement being 0.185 miles.

(1): Job J2P3118 Route 79 RALLS County. Bridge rehabilitation over Quarry Road south of Route T near Hannibal, the total length of improvement being 0.038 miles.
(2): Job J2P3119 Route 79 RALLS County. Bridge rehabilitation over Malaruni Creek south of Routes E near Hannibal, the total length of improvement being 0.044 miles.

(1): Job J2S3112 Route 156 LEWIS County. Bridge replacement west of Route D near Newark, the total length of improvement being 0.099 miles.
(2): Job J2S3113 Route 156 LEWIS County. Bridge replacement west of Route D near Newark, the total length of improvement being 0.129 miles.

(1): Job J3S3050 Route M PETTIS County. Bridge replacement over Flat Creek south of Sedalia, the total length of improvement being 0.155 miles.
(2): Job J3S3051 Route M PETTIS County. Bridge deck replacements over Breakfast Creek and Walnut Creek south of Sedalia, the total length of improvement being 0.12 miles.

(1): Job J7P2193I Route 37 JASPER County. ADA improvements from Loop 44 to Clarence Street in Sarcoxie, the total length of improvement being 0.256 miles.
(2): Job J7S3178 Route W BARRY County. ADA improvements from Route 86 to Route 37 in Wheaton, the total length of improvement being 0.445 miles.

(1): Job J5P3030 Route 68 PHELPS County. ADA and signal improvement west of I-44 in St. James, the total length of improvement being 0.29 miles.
(2): Job J5P3120 Route 68 PHELPS County. Microsurfacing west of I-44 to Route 8, the total length of improvement being 4.993 miles.

(1): Job J8P3007B Route 744 GREENE County. ADA improvements from west bypass to Route 13, the total length of improvement being 1.844 miles.
(2): Job J8P3007C Route 744 GREENE County. ADA improvements from west by-pass to Kansas Expressway, the total length of improvement being 1.877 miles.

(1): Job J9I3108 Route 55 PEMISCOT County. Bridge rehabilitation at various locations in the Southeast District, the total length of improvement being 0 miles.
(2): Job J9I3109 Route 55 PEMISCOT County. Bridge rehabilitation at various locations between Hayti and the state line, the total length of improvement being 0.201 miles.
(3): Job J9I3111 Route 55 NEW MADRID, PEMISCOT, SCOTT County. Resurfacing at various locations in Scott, New Madrid and Pemiscot Counties., the total length of improvement being 55.471 miles.

Removed from letting (http://www.modot.org/eBidLettingPublicWeb/viewStream.do?documentType=addenda&key=30901):
Job J9P3124 Route 49 WAYNE County. Bridge replacement bridge improvements over McKenzie creek., the total length of improvement being 0.049 miles.
Job J9P3132 Route 67 WAYNE County. Bridge replacement over Hubble Creek near Silva, the total length of improvement being 0.05 miles.
Job J9S3144 Route 158 BUTLER County. Bridge replacement west of Harviel, the total length of improvement being 0.119 miles.
Job J9S3151 Route CC BOLLINGER County. Bridge replacement south of county road 308/310 and north of US 51, the total length of improvement being 0.731 miles. 
Title: Re: MODOT Contract Lettings
Post by: Scott5114 on February 10, 2017, 12:24:35 AM
(1): Job J8P3007B Route 744 GREENE County. ADA improvements from west bypass to Route 13, the total length of improvement being 1.844 miles.
(2): Job J8P3007C Route 744 GREENE County. ADA improvements from west by-pass to Kansas Expressway, the total length of improvement being 1.877 miles.

One wonders what is going on here, as Kansas Expressway is Route 13. (West Bypass is the street name of Route 160—I mean, US-160.)
Title: Re: MODOT Contract Lettings
Post by: mvak36 on February 10, 2017, 09:52:21 AM
(1): Job J8P3007B Route 744 GREENE County. ADA improvements from west bypass to Route 13, the total length of improvement being 1.844 miles.
(2): Job J8P3007C Route 744 GREENE County. ADA improvements from west by-pass to Kansas Expressway, the total length of improvement being 1.877 miles.

One wonders what is going on here, as Kansas Expressway is Route 13. (West Bypass is the street name of Route 160—I mean, US-160.)

I looked at the plans for this listing. J8P3007B is from Glenstone Ave to US65. J8P3007C is from US160 to MO13. Maybe it was a typo in the listing?
Title: Re: MODOT Contract Lettings
Post by: mvak36 on February 23, 2017, 09:46:14 AM
Not a letting, but for people going to St. Louis area this summer, here's a summary of the major road projects in the metro.
http://www.stltoday.com/news/local/metro/modot-lays-out-top-roadwork-projects-that-could-slow-drivers/article_66b6fe70-aa59-510b-9434-a453b2418b40.html
Title: Re: MODOT Contract Lettings
Post by: mvak36 on March 17, 2017, 10:04:43 AM
April 21, 2017 Letting: Bid Results (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=6699). Bid Award Winners (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=6720)

Notable Projects:
Job J1S2192 Route DD BUCHANAN County. Bridge replacement, grading, and paving over I-29 near Faucett, the total length of improvement being 0.173 miles.
Job J0I3003J Route I-70 MONTGOMERY, WARREN County. JOC - asphalt pavement repair at various locations from Callaway County to St. Charles County, the total length of improvement being 0 miles.
Job J2P3058C Route 63 RANDOLPH County. Bridge rehabilitation 2.6 miles north of Route B near Clark, the total length of improvement being 1.08 miles.
Job J2P3164 Route 61 MARION County. High friction surface treatment on the Route 24/61 Interchange near Taylor, the total length of improvement being 0.62 miles.
Job J3P3057 Route 24 LAFAYETTE County. Intersection improvements at Route 131 south of Wellington, the total length of improvement being 0.289 miles.
Job J3P3069 Route 50, 65 PETTIS County. Signal interconnect in Sedalia, the total length of improvement being 2.45 miles.
Job J3P3077 Route 50 JOHNSON County. Intersection improvement and Grading and pavement for J-Turns at the intersection of Route 131, the total length of improvement being 1.078 miles.
Job J3S3079 Route Various VARIOUS County. Install chevron signs at curves in various rural counties, the total length of improvement being 0 miles.
Job J4P3227 Route Various VARIOUS County. JOC - Concrete Pavement Repair at various locations throughout the rural Kansas City District, the total length of improvement being 0 miles.
Job J0I3003I Route 70 VARIOUS County. JOC - asphalt pavement repair in Central District, the total length of improvement being 0 miles.
Job J0I3003Q Route 44 VARIOUS County. JOC - asphalt pavement repair in Central District, the total length of improvement being 0 miles.
Job J5L3075C Route 63 CALLAWAY County. Bridge deck replacement over Katy Trail 3 miles north of Route 54, the total length of improvement being 1.536 miles.
Job J5P3104 Route 32 DENT County. Bridge replacement over Dry Valley Creek on Route 32 near Salem, the total length of improvement being 0.183 miles.   
Job J5P3119 Route 54 CALLAWAY County. Bridge rehabilitation, guardrail upgrades, and guard cable from Kingdom City to Jefferson City, the total length of improvement being 28.807 miles.
Job J5P0933 Route 7 BENTON County. Bridge rehabilitation over the Osage River west of Route 65 in Warsaw, the total length of improvement being 0.216 miles.
Job J7S3000 Route 60 LAWRENCE County. Bridge replacement east of Route 37 in Monett, the total length of improvement being 0.313 miles.
Job J8I3055 Route 44 GREENE County. Grading, paving, lighting and signing. from Route 160 to Route H in Springfield, the total length of improvement being 1.466 miles.
Job J8P2226 Route 76 TANEY County. Grading, pavement, and bridge replacement over Bull Shoals Lake, the total length of improvement being 0.521 miles.
Job J9I3127 Route I-55 SCOTT County. Bridge rehabilitation at I-57 interchange, the total length of improvement being 0.49 miles.   

The following three sets of projects were let as one project (for each set):
(1): Job J1S3092 Route 6 BUCHANAN County. Pavement, coldmill and resurface from I-29 to Route AC, the total length of improvement being 1.551 miles.
(2): Job J1S3096 Route 6 BUCHANAN County. ADA improvements from Woodbine Road to Route AC in St. Joseph, the total length of improvement being 1.6714 miles.

(1): Job J4S3207 Route 152 PLATTE County. Guard cable from I-435 to Congress Ave near Kansas City, the total length of improvement being 4.083 miles.
(2): Job J4S3208 Route 9 CLAY, PLATTE County. Guard cable from I-635 to US 169, the total length of improvement being 1.593 miles.

(1): Job J7S3087 Route 76 TANEY County. Bridge replacement over Kentucky Hollow Creek, the total length of improvement being 0.139 miles.
(2): Job J7S3087B Route 76 TANEY County. Bridge replacement east of Route W in Brownbranch, the total length of improvement being 0.167 miles.
(3): Job J7S3087C Route 76 TANEY County. Bridge replacement west of Route W in Brownbranch, the total length of improvement being 0.067 miles 
Title: Re: MODOT Contract Lettings
Post by: mvak36 on March 24, 2017, 11:46:29 PM
Don't want to start a new thread for this, so posting this here.

I-70 Second Tier Study
I was browsing through the project sites MODOT Kansas City Major Projects page when I came across an update on the I-70 Second Tier Study (http://www.modot.org/kansascity/metroi70/) page.

It looks like they will have a Record of Decision for that I-70 segment (from downtown to 435) in April.
Quote
MoDOT and FHWA propose to combine the Final Environmental Impact Statement (FEIS) and Record of Decision (ROD) in accordance with provisions on environmental documentation in the Moving Ahead for Progress in the 21st Century Act (MAP-21) and the Fixing America's Surface Transportation (FAST) Act, selecting the Preferred Alternative
Quote
MoDOT and FHWA will address all agency and public comments from the DEIS in the combined FEIS/ROD. A copy of the DEIS comments and MoDOT/FHWA’s responses are included with this letter.  The combining of the FEIS and ROD means that there will be no comment period on the FEIS.   However, MoDOT and FHWA invite comments now based on information provided in this packet.  MoDOT anticipates completing the combined FEIS/ROD by April 2017. MoDOT and FHWA request that you provide any comments or concerns on the enclosed information and the decision to complete a combined FEIS and ROD within a 30-day comment period (ending on March 16, 2017). This will be the last opportunity for you to provide comments that would be considered by MoDOT and FHWA as part of the environmental review process.

But what caught my eye towards the bottom of the webpage was this:
Quote
Rebuilding the I-435 and I-70 interchange to remove left-hand exits is currently in design.

So I emailed MODOT asking about when they will do the construction.
Quote
We plan to start construction in Fall of 2018, with the traffic impacts (ramp and lane closures) to begin in Spring 2019.  The project will be complete in Fall 2020.
I didn't ask them what type of interchange they're going to build, but going off of their Preferred Alternative (http://www.modot.org/kansascity/metroi70/documents/I70EISInfoPacket.pdf) (page 4 of pdf), it looks like it will be a partial turbine interchange. The left-hand exits (which I hate, btw) will be replaced with semi-directional ramps.

I-435 South Loop Link
Another interesting thing I noticed was a new webpage for the I-435 South Loop Link (http://www.modot.org/kansascity/major_projects/I435South/). I'm not sure what all will be happening on this segment of I-435 (from State Line to the Grandview Triangle), but going through the study documents, they recommend removing and replace the Wornall and Holmes Rd bridges, among many other changes. I asked about when they will start the project, but I didn't ask for any specific information about what changes they will make.
Quote
Yes, that section will be under construction in 2018 & 2019.  The website you mentioned is the best source of information regarding that project.
This project is also listed in the 2017-2021 STIP (Job No. 4I2337):
Quote
Bridge and corridor improvements from the Kansas State line to just west of I-49. Project involves twin bridges A1240, A1662, A1427, and A0610. Potential Design/Build project.

My commute the next couple of years is going to suck, with the 435 pavement reconstruction on the KS side and this project coming up :ded:.
Title: Re: MODOT Contract Lettings
Post by: mvak36 on April 14, 2017, 09:12:14 AM
May 19, 2017 Letting: Bid Results (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=6739). Bid Award Winners (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=6779)

Notable Projects:
Job J1P3023C Route I-29 HOLT County. Bridge rehabilitation at Davis Creek and abandoned railroad, near Mound City, the total length of improvement being 0.241 miles.
Job J1P3179 Route 36 BUCHANAN, DEKALB County. High Friction Surface Treatment from 10th street bridge to Route 36 and I-229 Interchange and 1.5 miles east of Route 31 near Stewartsville in DeKalb Co, the total length of improvement being 0.327 miles.
Job J2P3058B Route 61 LINCOLN County. Bridge rehabilitation over Big Creek south of Route U near Moscow Mills, the total length of improvement being 0.392 miles.
Job J2S3159 Route F MONTGOMERY County. slide repair, lighting, and signing at I-70 interchange at High Hill, the total length of improvement being 1.223 miles.
Job J0I3003H Route 70 LAFAYETTE, SALINE County. JOC - asphalt pavement repair in Lafayette and Saline Counties, the total length of improvement being 0 miles.
Job J3P3030 Route 65 PETTIS County. Bridge deck replacement over Muddy Creek, the total length of improvement being 0.46 miles.
Job J3P3085B Route Z LAFAYETTE County. Grading, paving, drainage, pavement marking and signing at Route TT intersection near Bates City, the total length of improvement being 0.211 miles.
Job J4I3168 Route 470 JACKSON County. Bridge rehabilitation from Blue Ridge Blvd. to I-70, the total length of improvement being 14.929 miles.
Job J4P3228 Route Various VARIOUS County. Pavement markings at various roundabouts and intersections in urban Kansas City, the total length of improvement being 0 miles.
Job J4P3231 Route Various VARIOUS County. High friction resurfacing at various locations in the urban Kansas City District, the total length of improvement being 0.999 miles.
Job J0I3003Z Route 70 COOPER County. JOC - concrete pavement repair in various locations in Central District, the total length of improvement being 0 miles.
Job J5P3190 Route 17 PULASKI County. Slide repair north of I-44, the total length of improvement being 0.046 miles.
Job J6I3169 Route I-44 ST LOUIS County. Resurfacing, guardrail replacement and striping from Murdoch Avenue to Route 141, the total length of improvement being 8.8 miles.
Job J6I3224 Route 64 ST LOUIS, ST LOUIS CITY County. Bridge rehabilitation various bridges in St. Louis County and St. Louis City, the total length of improvement being 6.811 miles.
Job J6M0264 Route 185 Spur FRANKLIN County. Seal coat and Full Depth Reclamation in Franklin County, the total length of improvement being 2.21 miles.
Job J6P3164 Route 141 ST LOUIS County. Guard cable installation median from Casino Center Drive to River Valley Drive, the total length of improvement being 2.099 miles.
Job J6P3179 Route 61 ST CHARLES County. Signal replacements at Pitman Avenue in Wentzville, the total length of improvement being 0.152 miles.
Job J6S3174 Route Old Highway 21 JEFFERSON County. Signal Installation and ITS at Konert Road, the total length of improvement being 0.104 miles.
Job J8P3036 Route 65 GREENE County. Grading, drainage, paving and bridges and Route YY interchange in Springfield, the total length of improvement being 0.778 miles.
Job J8P3056 Route 413, 60 GREENE County. Grading, drainage, paving, signing and pavement marking from Route 175 in Republic to west of Route 160 in Springfield, the total length of improvement being 5.61 miles.
Job J8P3094 Route 60 GREENE County. Guardrail improvements south of I-44 to US65 in Springfield, the total length of improvement being 27.429 miles.
Job J8P3102 Route 360,60 GREENE County. Grading, drainage and paving at various locations in Springfield, the total length of improvement being 2.347 miles.
Job J0I3003S Route 55, 57 VARIOUS County. JOC - concrete repair in various locations in various counties, the total length of improvement being 0 miles.
Job J0I3003T Route 55, 57 VARIOUS County. JOC- asphalt repair in various locations in various counties, the total length of improvement being 0 miles.
Job J0I3003U Route 55, 155 NEW MADRID, PEMISCOT County. JOC - concrete repair in Southeast District, the total length of improvement being 0 miles.
Job J9P3303 Route 34, M BUTLER, REYNOLDS County. Sand seal pavement improvements from Route 21 to the Wayne County line and from Route 67 to paved shoulders west of interchange, the total length of improvement being 10.174 miles.   

The following three sets of projects were let as one project (for each set):
(1): Job J7P2228H Route 96 LAWRENCE County. Bridge replacement over Dry Fork Creek in Lawrence County, the total length of improvement being 0.144 miles.
(2): Job J7P2228I Route 96 LAWRENCE County. Bridge replacement over Stahl Creek in Lawrence County, the total length of improvement being 0.15 miles.
(3): Job J7S0526 Route 97 LAWRENCE County. Bridge replacement over Center Creek in Lawrence County, the total length of improvement being 0.152 miles.

(1): Job J7P3098 Route 76 STONE County. High Friction Surface Treatment near Deerfoot Trail in Stone County east of Cape Fair, the total length of improvement being 0.228 miles.
(2): Job J7P3161 Route 160 TANEY County. High Friction Surface Treatment from west of Silver Creek Road to Star Street north of Forsyth, the total length of improvement being 0.56 miles.
(3): Job J8P2386 Route 76 TANEY County. High Friction Surface Treatment near Lakeshore Drive east of Branson, the total length of improvement being 0.113 miles.

(1): Job J9S3069 Route K STODDARD County. Bridge replacement over Castor River near Puxico, the total length of improvement being 0.118 miles.
(2): Job J9S3135 Route 61 CAPE GIRARDEAU County. Bridge Replacement over Poor Creek near Pocahontas, the total length of improvement being 0.09 miles.
(3): Job J9S3139 Route C MISSISSIPPI County. Bridge replacement over Maple Slough near Dogwood, the total length of improvement being 0.072 miles.
(4): Job J9S3142 Route 102 MISSISSIPPI County. Bridge replacement over Lateral Ditch #2 near Whiting, the total length of improvement being 0.05 miles.       
Title: Re: MODOT Contract Lettings
Post by: intelati49 on April 28, 2017, 04:05:47 PM
(Instead of the whole list, I would pick and choose out the new lanes/Widenings/Bridgework/Signs and ignore the HFST and repaving projects. Kind of a overload RN and I think that's crushing the discussion here)

I was looking through Central states board for this topic exactly though
Title: Re: MODOT Contract Lettings
Post by: mvak36 on May 16, 2017, 01:31:14 PM
June 16, 2017 Letting: Bid Results (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=6799). Bid Award Winners (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=6859)

Notable Projects:
Job J1P3101 Route 136 ATCHISON County. Bridge replacement over east fork Little Tarkio Creek, near Tarkio, the total length of improvement being 0.332 miles.
Job J2P2210 Route 36 LINN County. Shoulder Improvements 1.4 miles east of Route 11 to 4.3 miles east of Route 5 near Bucklin MO, the total length of improvement being 10.006 miles.
Job J6I3205 Route 70 ST LOUIS CITY County. Pavement to add turn lane and signals and ADA improvements at Broadway and Carrie Ave, the total length of improvement being 0.334 miles.
Job J6M0266 Route 340 ST LOUIS County. Cold milling and resurface shoulder from Clayton Road to Lea Oak Drive, the total length of improvement being 2.989 miles.
Job J8P3088E Route 125,44 GREENE County. Intersection improvements in Strafford, the total length of improvement being 0.296 miles.

The following set of projects was let as one project:
(1): Job J1P3102 Route 71 ANDREW, NODAWAY County. Resurface north of Route A (Nodaway Co.) to n/o Route 48 (Andrew Co.), the total length of improvement being 11.692 miles.
(2): Job J1P3182 Route 71 NODAWAY County. Resurfacing and intersection improvements at Main Street intersection in Maryville, the total length of improvement being 0.935 miles.

Title: Re: MODOT Contract Lettings
Post by: intelati49 on May 16, 2017, 02:04:28 PM
Much better. There's only one thing I'll download this month, because I drive through it literally everyday... (I44 Greene county)
Title: Re: MODOT Contract Lettings
Post by: mvak36 on June 01, 2017, 11:09:22 PM
June 2, 2017 Letting: Bid Results (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=6759). Bid Award Winners (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=6760)

Notable Projects:
Job J9S3495 Route T Wayne County. Grading, paving and culvert replacement south of Wappapello, the total length of improvement being 0.035 miles.

June 23, 2017 Letting: Bid Results (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=6819). Bid Award Winners (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=6860)

Notable Projects:
Job J5S3294 Route NN PULASKI County. Culvert replacement over Elliot Branch south of Buckhorn, the total length of improvement being 0.025 miles.
Job J9P3494 Route CC OZARK County. Bridge replacement over North Fork of the White River, 4 miles east of Route 181, the total length of improvement being 0.227 miles.
Job J9S3075 Route PP OZARK County. Bridge replacement over North Fork of The White River, the total length of improvement being 0.2951 miles. 
Title: Re: MODOT Contract Lettings
Post by: mvak36 on June 09, 2017, 09:59:51 PM

I-435 South Loop Link
Another interesting thing I noticed was a new webpage for the I-435 South Loop Link (http://www.modot.org/kansascity/major_projects/I435South/). I'm not sure what all will be happening on this segment of I-435 (from State Line to the Grandview Triangle), but going through the study documents, they recommend removing and replace the Wornall and Holmes Rd bridges, among many other changes. I asked about when they will start the project, but I didn't ask for any specific information about what changes they will make.
Quote
Yes, that section will be under construction in 2018 & 2019.  The website you mentioned is the best source of information regarding that project.
This project is also listed in the 2017-2021 STIP (Job No. 4I2337):
Quote
Bridge and corridor improvements from the Kansas State line to just west of I-49. Project involves twin bridges A1240, A1662, A1427, and A0610. Potential Design/Build project.

My commute the next couple of years is going to suck, with the 435 pavement reconstruction on the KS side and this project coming up :ded:.

MODOT issued a Request for Qualifications for this project. http://www.modot.org/kansascity/newrelease/District4Release.shtml?action=displaySSI&newsId=211478
Title: Re: MODOT Contract Lettings
Post by: intelati49 on June 27, 2017, 11:22:38 AM
7-14 Letting


* J5P3295 - US50 pavement repairs on approach to Gasconade river
* J7S3309-33011 - Slide repairs in Stone County (From the flooding I would assume)
* J7S3312 - Slide repair for BUS 71 McDonald County (Ditto)
* J9S3497 - Slide repair for MO160 (Ditto)
Title: Re: MODOT Contract Lettings
Post by: mvak36 on June 30, 2017, 09:29:51 AM
Design-build team selected for new Champ Clark Bridge
http://www.modot.org/newsandinfo/District0News.shtml?action=displaySSI&newsId=211764
Quote
MoDOT News Release

June 30, 2017 08:22 AM
Massman and HNTB Selected to Design, Build New Champ Clark Bridge
New Bridge Completion Expected in Fall 2019

HANNIBAL – By Fall 2019, motorists traveling across the Mississippi River on U.S. Route 54 between Illinois and Missouri will enjoy a wider, safer ride.   Massman Construction Company, headquartered in Kansas City, was selected yesterday as the best-value proposer to design and construct the new Champ Clark Bridge by the Missouri Highways and Transportation Commission at its meeting in Bowling Green. Replacement of the bridge is a partnership between the Illinois Department of Transportation and the Missouri Department of Transportation.

The Massman team is comprised of Massman Construction Company serving as the prime contractor and HNTB Corporation providing the design services.

The Massman team was one of four design-build teams competing for the contract.  Design-build is a project delivery method that combines both the design and construction phases into one contract to save time and resources.  This is the first design-build project in MoDOT’s Northeast District.  Information about the project, including history of the existing bridge, can be found at www.champclarkbridge.com.

The Massman team’s proposal calls for the new bridge to be constructed just south of the existing bridge, while traffic is maintained on the existing bridge through most of the construction. The best-value selection includes a new 44-foot wide bridge, elevating the Illinois approach to eliminate closures from flooding and improvements to the Route 54 / Route 79 intersection in Missouri.

“We’re proud to have been selected to build the new Champ Clark Bridge and look forward to a good working relationship with the team and the region,” said Mark Schnoebelen, vice president of Massman Construction Company.  “We know our work will not only impact local folks who travel in the area, but all motorists who cross the Mississippi River here,” he added.  “We’re committed to building a quality bridge at a good value as quickly as possible,” he concluded.

The Massman team’s goal is to subcontract 12 percent of the construction and 16 percent of the professional and design activities to disadvantaged business enterprise companies.  Federal workforce goals also require that 3.1 percent of those working on the project are minorities and 6.9 percent are female.  “We had the opportunity to connect the teams with DBEs this year, as well as provide a job fair last fall for anyone interested in potentially working on the new bridge,” said Keith Killen, project director of the Champ Clark Bridge and a professional engineer with MoDOT.  He added the team and MoDOT will work together to host another job fair later this summer.

The next step in the design-build process for the Massman Team is to fine-tune its design plans.  When those are complete, MoDOT will hold a public meeting to share the final scope of work, including proposed renderings of the new bridge.

The Massman team plans to begin construction this fall and have the bride open to traffic by the Fall of 2019.  A groundbreaking ceremony will be held later this fall.

The Champ Clark Bridge name is expected to stick with the new bridge.  It was named for former presidential candidate and Speaker of the House James Beauchamp Clark, who also served as assistant prosecuting attorney in Pike County for 26 years.

Replacement of the 90-year-old Champ Clark Bridge, the oldest bridge in northeast Missouri, is a critical project to maintain the state’s transportation infrastructure.  “Our focus is to take care of our existing highway and bridge system and keep it in good condition,” said MoDOT Northeast District Engineer Paula Gough.  “This bridge is an important link on the U.S. 54 corridor. It has served us well for many, many years, but has become increasingly unreliable. We’re excited that we can finally get to work building a new bridge.”

To receive email updates about the project, go to www.champclarkbridge.com and subscribe to MoDOT’s e-update service.

###
Title: Re: MODOT Contract Lettings
Post by: mvak36 on July 14, 2017, 11:13:44 AM
August 18, 2017 Letting: Bid Results (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=6919). Bid Award Winners (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=6939).

Notable Projects:
Job J1I3020 Route I-29 ANDREW, HOLT County. 1 Bridge Deck Replacement over Nodaway River, the total length of improvement being 0.59 miles.
Job J2I3160 Route I-70 WARREN County. Grading, alternate paving, walls and bridge west of Route MM in Warrenton, the total length of improvement being 1.877 miles.
Job J8M0258 Various Routes, Various Counties. Guardrail replacement in various locations in the Southwest District, the total length of improvement being 0.933 miles.   

The following set of projects was let as one project:
(1): Job J1P0918 Route 36 CALDWELL, DEKALB County. Coldmill and resurface west of Route 33 east of Caldwell County Line, the total length of improvement being 5.47 miles.
(2): Job J1P3086 Route 36 DEKALB County. Grading and pavement from 0.1 mile west of Route 33 to 0.6 miles east of Route 33 near Osborn, the total length of improvement being 0.745 miles.
(3): Job J1P3105 Route 36 DEKALB County. Coldmill and resurface east of Route 31 west of Route 33 near Osborn, the total length of improvement being 10.283 miles.

Title: Re: MODOT Contract Lettings
Post by: I-39 on July 14, 2017, 09:20:38 PM
I'm gonna be honest, I'm surprised MoDOT has any contract lettings, since they are so short on money.
Title: Re: MODOT Contract Lettings
Post by: mvak36 on July 14, 2017, 10:26:01 PM
I'm gonna be honest, I'm surprised MoDOT has any contract lettings, since they are so short on money.
They have money to do maintenance projects and all but not enough to do big projects. About 200 million or so every year is used to pay back the bonds that they took out for the new I-70 bridge and the 64 extension to Wentzville. Unless the legislature increases the gas tax or finds another source of revenue like tolling, etc., they won't have money to do projects like 70 between KC and STL. I believe they're gonna be paying off those bonds till about 2033.


iPhone
Title: Re: MODOT Contract Lettings
Post by: J N Winkler on July 17, 2017, 04:18:14 PM
MoDOT lets many of what it calls Job Order Contracting (JOC) contracts, which are for small maintenance-type jobs like mowing, fence repair, etc. and involve the contractor agreeing to be on call for work orders.  They have plan sets, but typically they include just a title sheet and some standard plan sheets for workzone traffic control.  If you strip out the JOC contracts, quite often there is very little left in each monthly letting.

I remember reading a while ago that MoDOT has a "nut" of $300 million each year to work with and has to focus on the most heavily traveled subset of the state highway system--I think the top 3000 miles?
Title: Re: MODOT Contract Lettings
Post by: mvak36 on July 18, 2017, 11:45:55 AM
MoDOT lets many of what it calls Job Order Contracting (JOC) contracts, which are for small maintenance-type jobs like mowing, fence repair, etc. and involve the contractor agreeing to be on call for work orders.  They have plan sets, but typically they include just a title sheet and some standard plan sheets for workzone traffic control.  If you strip out the JOC contracts, quite often there is very little left in each monthly letting.

I remember reading a while ago that MoDOT has a "nut" of $300 million each year to work with and has to focus on the most heavily traveled subset of the state highway system--I think the top 3000 miles?

I remember that. Is this what you were talking about? http://www.modot.org/toughchoicesahead/documents/ToughChoicesAheadfactsheet.pdf

Also, thanks for letting me know what JOC stands for. I'll take those out next time I put lettings.
Title: Re: MODOT Contract Lettings
Post by: mvak36 on August 16, 2017, 09:02:13 PM
September 22, 2017 Letting: Bid Results (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=6959). Bid Award Winners (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=6980).

Notable Projects:
Job J1P3100 Route 136 MERCER County. Bridge replacement 2.9 miles ease of Route 65, near Princeton, the total length of improvement being 0.098 miles.
Job J3S3084 Route DD JOHNSON County. Bridge replacement over Bear Creek near Warrensburg, the total length of improvement being 0.116 miles.
Job J4I3112 Route 49 CASS County. Resurfacing from Route 7 to Bates County line, the total length of improvement being 9.291 miles.
Job J4Q3190 Route Various JACKSON County. ITS improvement along I-470 and I-49 in Jackson County, the total length of improvement being 6.1 miles.
Job J4S3132 Route I-470 JACKSON County. Bridge rehabilitation and ADA improvements in Lee's Summit, the total length of improvement being 0.314 miles.   
Job J5P3201 Route EE, ZZ, DD, A CRAWFORD, GASCONADE, OSAGE County. Pavement improvements in Gasconade, Crawford and Osage Counties, the total length of improvement being 30.402 miles.
Job J5S3193 Route J PHELPS, PULASKI County. Resurface to Route K just North of I-44, the total length of improvement being 17.201 miles.
Job J7S2232 Route 13 ST CLAIR County. Coldmill, resurface, and shoulders from 0.5 mile north of county road NE 1000 to county road SE 1300., the total length of improvement being 22.334 miles.
Job J7S3177 Route 43 NEWTON County. Resurface, coldmill, and shoulders from I-44 to Route 60 in Seneca., the total length of improvement being 13.602 miles.
Job J8S3076 Route AA, JJ CHRISTIAN County. Resurfacing in Christian County, the total length of improvement being 7.197 miles.
 
The following five sets of projects was let as one project (for each set):

(1): Job J1L1801B Route 69 DAVIESS, HARRISON County. Pavement improvements from Route AA to Route C near Pattonsburg, the total length of improvement being 5.81 miles.
(2): Job J1L1801C Route 129 SULLIVAN County. Pavement improvements from Route 6 to Route H, the total length of improvement being 7.74 miles.
(3): Job J1L1801D Route 69 DAVIESS County. Pavement and shoulder improvements from I-35 to MO 6, the total length of improvement being 3.17 miles.
(4): Job J1L1801E Route H LIVINGSTON County. Pavement improvements from US 65 to Route 139, the total length of improvement being 8.011 miles.
(5): Job J1L1801F Route J CARROLL County. Pavement improvments from US 65 to end of maintenance on Route J, the total length of improvement being 9.919 miles.

(1): Job J1S3088 Route C CLAY, CLINTON County. Resurface and shoulder widening from Route 116 in Plattsburg to Route CC, the total length of improvement being 8.03 miles.
(2): Job J4P3051B Route C CLAY County. Resurfacing and shoulders from Route 92 to Route CC, the total length of improvement being 6.676 miles.

(1): Job J1S3123 Route EE HARRISON County. Bridge deck replacement 0.1 miles south of Route M, the total length of improvement being 0.039 miles.
(2): Job J1S3124 Route AA, H HARRISON County. Bridge deck replacement 1.3 miles west of Route 13 near Coffey, the total length of improvement being 0.054 miles.

(1): Job J7S3125 Route 123 GREENE, POLK County. Pavement and safety improvements from Route 125 (S Junction) to Route 160, the total length of improvement being 13.309 miles.
(2): Job J7S3126 Route T POLK County. Resurface and shoulders from Route 123 to Mo 13 in Polk County, the total length of improvement being 10.431 miles.

(1): Job J7S3129 Route 66 JASPER County. Resurface, coldmill, shoulders from the Kansas state line to Route P., the total length of improvement being 3.963 miles.
(2): Job J7S3144 Route Various JASPER County. Resurface, coldmilling, and shoulders in Jasper County, the total length of improvement being 15.129 miles.
Title: Re: MODOT Contract Lettings
Post by: mvak36 on September 14, 2017, 05:00:55 PM
October 20, 2017 Letting: Bid Results (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=7000). Bid Award Winners (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=7040).

Notable Projects:
Job J1I3169 Route I-35 HARRISON County. Coldmill and resurface from Iowa state line to Route N at Eagleville, the total length of improvement being 8.224 miles.
Job J1P3187 Route 36 DEKALB County. Guardrail improvement from Buchanan County line to 1.4 miles east of Route N near Stewartsville, the total length of improvement being 7.0566 miles.
Job J1S0605 Route 59 HOLT County. Bridge replacement over Davis Creek, 0.1 mile west of Mound City, the total length of improvement being 0.04 miles.
Job J1S1042 Route 275 ATCHISON County. Resurface and shoulder improvements from Iowa state line to Route 136, the total length of improvement being 15.574 miles.
Job J4I3114 Route I-49 CASS, JACKSON County. Resurface from Blue Ridge Blvd to 163rd St., the total length of improvement being 5.552 miles.
Job J4S3201 Route 150 JACKSON County. ADA and intersection improvements at the intersection of Arborlake Dr / Stoney Creek Dr, the total length of improvement being 0.038 miles.
Job J5P3191 Route 42 MARIES, MILLER County. Resurface and add shoulders from Rte. 17 in Iberia to Rte. 63 in Vienna, the total length of improvement being 22.19 miles.
Job J5P3194 Route 17 COLE, MILLER County. Resurface and add shoulders from Route 54 to 52 in Tuscumbia., the total length of improvement being 15.669 miles.
Job J5P3208 Route 52 MORGAN County. Microsurface from Route 5 intersection in Versailles to Benton County Line, the total length of improvement being 11.845 miles.
Job J5P3209 Route 5 MONITEAU, MORGAN County. Microsurface from Tipton to Versailles on Route 5, the total length of improvement being 14.322 miles.
Job J5P3213 Route 40 BOONE, HOWARD County. Resurface and shoulder improvements from east of Route 5 to Route UU, the total length of improvement being 17.377 miles.
Job J5P3298 Route 63 MARIES County. Scour repair over the Gasconade River, the total length of improvement being 0.28 miles.
Job J5S3296 Route 89 OSAGE County. Scour repair over the Gasconade River, the total length of improvement being 0.095 miles.
Job J5S3297 Route 42 MARIES County. Scour repair over the Gasconade River, the total length of improvement being 0.19 miles.
Job J6I2240 Route I-70 OR ST CHARLES County. Coldmill and resurface on West Clay St from Truman Blvd to Zumbehl Rd and on Veterans Memorial Pkwy from Zumbehl Rd to Route 94, the total length of improvement being 2.246 miles.
Job J7S2227C Route 86 NEWTON County. Coldmill and resurface from east of Kodiak Road to Bus 60/College Street to Route 60 in Neosho, the total length of improvement being 5.425 miles.
Job J8P3126 Route 60 GREENE County. Sound Wall from National Ave to Business 65 in Springfield, the total length of improvement being 0.47 miles.

The following four sets of projects was let as one project (for each set):

(1): Job J1P3006 Route 136 GENTRY County. Coldmill and resurface from 1.1 miles east of Route 169 to 0.5 mile west of Route C in Albany, the total length of improvement being 3.721 miles.
(2): Job J1S3201 Route D ANDREW County. Resurface from Route 48 to Route 169, near Savannah, the total length of improvement being 15.59 miles.
(3): Job J1S3202 Route W DEKALB County. Resurface from Route A to Route D, near Maysville, the total length of improvement being 5.006 miles.

(1): Job J9P3349 Route 91 STODDARD County. Resurface from Rte. C to Rte. 25 in Advance, the total length of improvement being 0.323 miles.
(2): Job J9S3347 Route C BOLLINGER, STODDARD County. Resurface from Route 51 to Route 91 in Advance, the total length of improvement being 9.478 miles.

(1): Job J9P3188 Route 49 REYNOLDS County. Resurface from Route A to Route 21, the total length of improvement being 9.512 miles.
(2): Job J9S3190 Route E IRON County. Resurface from Route 21 to Madison County line, the total length of improvement being 9.478 miles.
(3): Job J9S3234 Route DD STE GENEVIEVE County. Resurface from Rte T to I-55, the total length of improvement being 9.645 miles.

(1): Job J9S3244 Route O DUNKLIN County. Resurface from Route 84 to Route 412, the total length of improvement being 1.69 miles.
(2): Job J9S3245 Route VV DUNKLIN County. Resurface from Rte. O to Rte. 412 in Kennett, the total length of improvement being 0.807 miles.
(3): Job J9S3248 Route C DUNKLIN County. Resurface from Rte. P to Rte. N near Senath, the total length of improvement being 3.324 miles.
(4): Job J9S3314 Route 75 MISSISSIPPI County. Resurface from Route 105 to Route 80, the total length of improvement being 5.539 miles.
(5): Job J9S3323 Route EE PEMISCOT County. Resurface from Route 153 to Route A, the total length of improvement being 2.904 miles.   
Title: Re: MODOT Contract Lettings
Post by: mvak36 on October 14, 2017, 01:38:05 PM
November 17, 2017 Letting: Bid Results (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=7060). Bid Award Winners (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=7100).

Notable Projects:
Job J1P3219 Route 36 LINN County. Scour repair eastbound lane over Higgins Ditch, 1.6 miles west of Rte. 130 near Laclede, the total length of improvement being 0.07 miles.
Job J2P3101 Route 19 AUDRAIN, MONTGOMERY County. Coldmill and resurface from US 54 south junction to 0.2 miles north of Route B near Montgomery City, the total length of improvement being 15.911 miles.
Job J2P3174 Route 54 AUDRAIN County. Resurface from the Callaway Co. line to south of Rte. 15/22 interchange near Mexico, the total length of improvement being 3.687 miles.
Job J4I3113 Route I-70 JACKSON County. Coldmill and resurface from Sterling Ave to Route 291 NB, the total length of improvement being 4.94 miles.
Job J4I3115 Route I-435 JACKSON County. Coldmill, resurface and ADA improvements from Route W to Stadium Drive, the total length of improvement being 7.588 miles. 
Job J4P3130 Route 291 CLAY, JACKSON County. Bridge rehabilitation .8 miles north of Route 210, the total length of improvement being 0.732 miles.
Job J5P3123 Route 5 LACLEDE County. Resurface and add shoulders south of Lebanon from Lawson Avenue/Farmers Lane to Route C, the total length of improvement being 5.416 miles.
Job J5P3124 Route 32 LACLEDE, TEXAS County. Resurface and add shoulder from Lebanon to Route 17 in Texas County, the total length of improvement being 37.398 miles.
Job J5P3196 Route 32, 119 DENT, TEXAS County. Microsurface in Dent and Texas county, the total length of improvement being 32.12 miles.
Job J5P3200 Route OR 50 COLE County. Pavement improvements portions of Missouri Blvd, Truman Blvd and Big Horn Drive in Jefferson City, the total length of improvement being 5.496 miles.
Job J6I3109 Route I-70 ST CHARLES, ST LOUIS County. Coldmill and resurface from 5th Street to west of Fee Fee Road, the total length of improvement being 4.312 miles.
Job J6I3111 Route I-64 ST LOUIS CITY County. Coldmill and resurface from Sarah Street to Vandeventer Street, the total length of improvement being 1.714 miles.
Job J7S2227D Route 43 NEWTON County. Coldmill and resurface from Route FF to I-44 in Joplin, the total length of improvement being 1.262 miles.
Job J7S3118 Route 66 JASPER County. Coldmill and resurface from Loop 49 (Rangeline Road) to Rte 249, the total length of improvement being 2.73 miles.
Job J7S3173 Route 44 NEWTON County. Bridge replacement on Connecticut Ave. over Interstate 44 in Joplin, the total length of improvement being 0.149 miles.
Job J8P0850B Route OR 65 GREENE County. Grading and pavement south of Business 65, the total length of improvement being 0.238 miles.
Job J9P3071 Route 53 BUTLER, DUNKLIN County. Grading, pavement and bridge over St. Francis River near Glennonville, the total length of improvement being 0.826 miles.       

The following five sets of projects was let as one project (for each set):
(1): Job J1I0904 Route I-229 BUCHANAN County. Coldmill and resurface from 22nd Street east to I-29, the total length of improvement being 2.42 miles.
(2): Job J1P3184 Route 752 BUCHANAN County. Resurface from Route 371 north to I-229, the total length of improvement being 1.102 miles.

(1): Job J2P3097 Route 61 LINCOLN County. Coldmill and resurface on southbound lanes from Rte. E to the St. Charles County line to near Moscow Mills, the total length of improvement being 17.621 miles.
(2): Job J2P3098 Route 61 LINCOLN County. Coldmill and resurface from Rte. C at Moscow Mills to St. Charles County line, the total length of improvement being 14.492 miles.

(1): Job J2P3102 Route 61 LEWIS, MARION County. Resurface on southbound lanes from near Rte. B north junction to Rte. 24 interchange in Marion County, the total length of improvement being 16.897 miles.
(2): Job J2P3154 Route 61 LEWIS, MARION County. Resurface on northbound lanes from Rte. 24 interchange to 0.9 mile north of Rte. B south junction in Lewis County, the total length of improvement being 6.584 miles.
(3): Job J2P3166 Route 61 LINCOLN County. Grading and pavement from Rte. C at Moscow Mills to St. Charles County line, the total length of improvement being 3.364 miles.

(1): Job J8P3051B Route 160 GREENE County. Coldmill and resurface from Rte. 60 to n/o Plainview Road, the total length of improvement being 1.319 miles.
(2): Job J8S3074 Route CC CHRISTIAN County. Coldmill and resurface from 0.5 miles e/o Route 160 to Route 65, the total length of improvement being 3.394 miles.
(3): Job J8S3075 Route M CHRISTIAN County. Coldmill and resurface from Route 14 to Butterfield Road in Nixa, the total length of improvement being 1.053 miles.

(1): Job J9P3004 Route 60 WRIGHT County. Resurface from Webster County line to Whetstone Creek, the total length of improvement being 12.992 miles.
(2): Job J9P3195 Route 60 HOWELL County. Resurface from Route NN to Route 17, the total length of improvement being 8.336 miles.   
Title: Re: MODOT Contract Lettings
Post by: mvak36 on November 14, 2017, 10:27:36 AM
December 15, 2017 Letting: Bid Results (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=7120). Bid Award Winners (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=7140).

Notable Projects:
Job J2P3014 Route 47 LINCOLN County. Coldmill and resurfacing from west of Routes H & J in Troy to Routes A & D in Hawk Point, the total length of improvement being 6.691 miles.
Job J2P3131 Route 63 ADAIR, MACON County. Coldmill and resurface NB Lanes - 1.8 miles north of Route 156 to 2.6 miles north of Route KK near Kirksville. SB Lanes - 1.5 miles north of Route 156 to 1.3 miles south of Route M in Macon County, the total length of improvement being 19.232 miles.
Job J2P3136 Route 63 BOONE, RANDOLPH County. Resurface and pavement repair on the northbound lanes from 0.6 mile south of Rte. 22 in Boone Co. to 0.4 mile north of Rte. EE in Moberly, the total length of improvement being 14.162 miles.
Job J3P2226 Route 61 MARION, RALLS County. Coldmill and resurfacing from 0.4 Miles north of Route 168 to just north of Warren Barrett Drive in Hannibal, the total length of improvement being 4.183 miles.
Job J4P2360B Route 49 CASS County. Bridge rehabilitation over the east branch of South Grand River 2.9 miles north of Route 291 and over Tennessee Creek 4.2 miles north or Routes A/B, the total length of improvement being 0.94 miles.
Job J4P3214B Route Various VARIOUS County. Intersection improvements in various locations in the urban Kansas City District, the total length of improvement being 0 miles.
Job J5P3126 Route 5 CAMDEN County. Resurfacing from Niangua River to Route 7, the total length of improvement being 8.005 miles.
Job J5S3299 Route 100 GASCONADE County. Scour repair .1 mile west of Route J, the total length of improvement being 0.013 miles.
Job J6I3165 Route I-70 ST LOUIS, ST LOUIS CITY County. Pavement improvements from the Springdale Avenue overpass east of I-170 to the Union Boulevard Interchange just east of the St. Louis City Limits, the total length of improvement being 2.669 miles.
Job J6P3062B Route 141 ST LOUIS County. Bridge improvements from Shoreline Drive to Lakefront Drive in Earth City, the total length of improvement being 0.042 miles.
Job J7P3308 Route 13 HENRY County. Bridge rehabilitation on southbound bridges A0488 and A0489 over Deepwater Creek and Menson Creek and on northbound bridge A0842 over Otter Creek., the total length of improvement being 0.189 miles.           

The following five sets of projects was let as one project (for each set):

(1): Job J4P2332C Route 71 JACKSON County. Guardrail improvement from Swope Parkway to I-670, the total length of improvement being 3.78 miles.
(2): Job J4S3153 Route 71 JACKSON County. Coldmill and resurface from I-435 to Swope Parkway, the total length of improvement being 6.67 miles.

(1): Job J6I3116 Route I-44 FRANKLIN County. Bridge replacement over EB Route 50 Entrance Ramp, the total length of improvement being 0.49 miles.
(2): Job J6S3163 Route St. Mary Rd FRANKLIN County. Bridge replacement over I-44, the total length of improvement being 0.157 miles.

(1): Job J7I3291 Route I-44 VARIOUS County. JOC - bridge repair in rural Greene and Webster counties, the total length of improvement being 59.964 miles.
(2): Job J8I3136 Route Various GREENE County. JOC - bridge repair from east of Rte. 360 to 2 miles east of Rte. 125, Rte. 65 from I-44 to Rte. 60, Rte. 360 from east of I-44 to Rte. 60, the total length of improvement being 88.794 miles.

(1): Job J9S3192 Route 95 DOUGLAS, WRIGHT County. Resurfacing from Clouse Street to Route 76, the total length of improvement being 10.431 miles.
(2): Job J9S3193 Route 38 TEXAS, WRIGHT County. Resurfacing from Route 95 to Route 17, the total length of improvement being 16.894 miles.
(3): Job J9S3194 Route HH WRIGHT County. Resurfacing from Route Y to end of MoDOT Maintenance, the total length of improvement being 3.617 miles.
(4): Job J9S3343 Route Z WRIGHT County. Resurfacing from the intersection of Route H to the intersection of Route 5, the total length of improvement being 11.06 miles.
(5): Job J9S3429 Route 60 WRIGHT County. Resurfacing from Route 5 to Jennifer Street, the total length of improvement being 1.676 miles.

(1): Job J9S3324 Route FF BUTLER County. Pavement improvements from Route 51 to Route CC, the total length of improvement being 7.259 miles.
(2): Job J9S3344 Route 172 WAYNE County. Resurfacing from Route 67 to the end of state maintenance, the total length of improvement being 8.809 miles.   
Title: Re: MODOT Contract Lettings
Post by: mvak36 on December 01, 2017, 06:23:41 PM

I-435 South Loop Link
Another interesting thing I noticed was a new webpage for the I-435 South Loop Link (http://www.modot.org/kansascity/major_projects/I435South/). I'm not sure what all will be happening on this segment of I-435 (from State Line to the Grandview Triangle), but going through the study documents, they recommend removing and replace the Wornall and Holmes Rd bridges, among many other changes. I asked about when they will start the project, but I didn't ask for any specific information about what changes they will make.
Quote
Yes, that section will be under construction in 2018 & 2019.  The website you mentioned is the best source of information regarding that project.
This project is also listed in the 2017-2021 STIP (Job No. 4I2337):
Quote
Bridge and corridor improvements from the Kansas State line to just west of I-49. Project involves twin bridges A1240, A1662, A1427, and A0610. Potential Design/Build project.

My commute the next couple of years is going to suck, with the 435 pavement reconstruction on the KS side and this project coming up :ded:.

MODOT issued a Request for Qualifications for this project. http://www.modot.org/kansascity/newrelease/District4Release.shtml?action=displaySSI&newsId=211478

MODOT has selected the winning design-build team for this project. http://www.modot.org/kansascity/newrelease/District4Release.shtml?action=displaySSI&newsId=213701

Quote
LEE’S SUMMIT – Today the Missouri Highways & Transportation Commission announced that the Radmacher-Wilson Team -- construction contractor Radmacher Brothers Excavating Inc. and the engineering design firm of Wilson & Company, Inc. -- won the competition for the Design-Build project known as the I-435 South Loop Link. Work is anticipated to begin in spring of 2018 and be fully completed by late spring 2020.

 “We’re thrilled to work with both Radmacher Brothers and Wilson & Company on this project,” said Kansas City District Engineer Brian Kidwell. “We’ve worked with both of them independently on projects throughout the district. We expect great things from this collaboration.”

With a budget of $75 million, the department bundled multi-bridge replacements, resurfacing and corridor safety and mobility improvements from the Kansas state line to the Three Trails Crossing interchange into a Design-Build project delivery format.  Interested teams competed to provide innovative, goal-driven, results-oriented transportation solutions within a fixed budget.

The Radmacher-Wilson Team competed against three other teams to develop the project proposal that demonstrated it provided the best value within the parameters. They had to meet or exceed several goals, including low-to-no impacts to the traveling public during construction, renew aging pavement and bridges and improve safety and reduce congestion.

In as little as 10 weeks, the team developed a project proposal that replaces the bridges at Wornall and Holmes, rehabilitates the bridges at 104th Street and the Blue River, and upgrades the pavement on I-435 which includes adding another lane -- all while maintaining the current four lanes of traffic during construction.

Additional improvements include removing the loop ramps at the Holmes Road Interchange, 12 foot inside shoulders along I-435, increased vertical clearance under the Wornall road bridge, new taller and safer concrete barrier wall and longer merge lanes in critical locations.

The combining of multiple needs along the corridor into “system improvement” approach, developing minimum requirements, project goals and a fixed budget really challenged the Design-Build teams. 

“They were forced at every turn to think outside the box, balancing the selected construction details against the available funds,” said Project Engineer Perry Allen. “Ultimately, the proposal submitted by the Radmacher-Wilson Team took an innovative approach that provides exceptional value while meeting or exceeding the project goals.”

Radmacher is currently constructing the Route 50 and Route 291 Interchange Project in Lee’s Summit. Wilson & Company were designers of the I-49 and 155th Street Project in Belton, a project also being constructed by Radmacher.

The I-435 corridor was originally constructed in 1966 as a six-lane freeway, an additional lane was added in phases from 1983 to 1994. Minor improvements have been made over the past 20 years by both Kansas Department of Transportation (KDOT) and MoDOT, but overall this corridor has been left virtually unchanged since 1994.
Title: Re: MODOT Contract Lettings
Post by: mvak36 on December 08, 2017, 08:12:54 AM
January 19, 2018 Letting: Bid Results (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=7160). Bid Award Winners (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=7200).

Notable Projects:
Job J1P3108 Route 10 CARROLL County. Resurfacing from Rte. FF to Bus. 65 near Carrollton, the total length of improvement being 14.166 miles.
Job J2P3059C Route 24/61 MARION County. Bridge rehabilitation over South Fabius River 1.2 miles south of Rte. 6 near Taylor, the total length of improvement being 0.087 miles.
Job J3I3009 Route I-70 SALINE County. Bridge rehabilitation at Route 65 interchange, 3.3 miles east of Route YY and 6.6 miles west of Route J, the total length of improvement being 0.896 miles.
Job J3P3061 Route 65 SALINE County. Coldmill and resurface from Bus. 65 to Pettis County Line, the total length of improvement being 10.612 miles.
Job J3S3058 Route WW LAFAYETTE County. Bridge deck replacement over I-70, 2.3 miles west of Route 131 and 3.4 miles east of Route D, the total length of improvement being 0.108 miles.
Job J4I3242 Route I-435 PLATTE County. Slide repair south of Prairie Creek, the total length of improvement being 0.104 miles.
Job J4P3140 Route 69 CLAY County. Coldmill and resurface SB McCleary to Lightburne and NB Fishing River to McCleary, the total length of improvement being 8.93 miles.
Job J4P3156 Route 50 JACKSON County. Resurfacing from RA to County Line, the total length of improvement being 12.25 miles.
Job J4S3152 Route 2 CASS County. Bridge rehabilitation interchange in the City of Harrisonville, the total length of improvement being 0.184 miles.
Job J5I3226 Route I-44 CRAWFORD, LACLEDE County. Pavement repairs from Elm St. at Lebanon to 0.4 miles west of Rte. 133 and on the EB lanes from 1.2 miles east of Rte. ZZ to 0.5 miles west of Rte. H in Crawford County, the total length of improvement being 23.87 miles.
Job J5I3300 Route 44 LACLEDE County. Shoulder improvements 6 miles south of Lebanon, the total length of improvement being 11.096 miles.
Job J5P3109 Route 7 PULASKI County. Bridge painting over the Gasconade River, the total length of improvement being 0.141 miles.
Job J5P3118 Route 54 COLE County. Coldmill and resurface from just west of Stadium Blvd to the Missouri River Bridge, the total length of improvement being 1.825 miles.
Job J5P3165 Route 63 BOONE County. Bridge rehabilitation over Bonne Femme Creek, the total length of improvement being 0.347 miles.
Job J6I3150 Route I-44 ST LOUIS CITY County. Bridge replacements and rehabilitation's at Kingshighway Blvd., Thurman Ave., and 39th St. and rehab bridges at UP RR, Vandeventer Ave., and Tower Grove Ave, the total length of improvement being 1.312 miles.
Job J6I3182 Route 61, 70 ST CHARLES County. Bridge rehabilitation ramps at Interchange, the total length of improvement being 1.072 miles.
Job J6P2345 Route 21 JEFFERSON County. Intersection improvements at Route 110 north of DeSoto, the total length of improvement being 0.312 miles.
Job J6S3160 Route 30 JEFFERSON County. Microsurfacing from St. Louis county line to west of Route PP near High Ridge, the total length of improvement being 5.272 miles.
Job J6S3161 Route 47 FRANKLIN County. Microsurfacing from Commercial St in St. Clair to Norwood Trailer Ct in Washington, the total length of improvement being 11.36 miles.
Job J7I3204 Route I-44 NEWTON County. Bridge rehabilitation in Newton County over Shoal Creek, the total length of improvement being 0.336 miles.
Job J7P3000 Route I-49 JASPER County. Bridge rehabilitation over BNSF Railroad and Spring River in Carthage, the total length of improvement being 1.502 miles.Job J8P3111 Route 65 GREENE County. Pavement rehabilitation at the interchange of I-44 and at the interchange of Route 60, the total length of improvement being 0.592 miles.
Job J9S3290 Route 74 CAPE GIRARDEAU County. Resurface from Route 25 to I-55, the total length of improvement being 5.19 miles.                 

The following set of projects was let as one project (for each set):
(1): Job J2P3151 Route 61 CLARK, LEWIS County. Coldmill and resurfacing from Iowa State Line to Rte. 27 and six disconnected sections on southbound lanes, the total length of improvement being 16.009 miles.
(2): Job J2P3219 Route 61 LEWIS County. Safety improvements on northbound lanes from 0.9 miles north of Rte. B south junction to 0.4 mile south of Rte. B north junction near Canton, the total length of improvement being 10.295 miles. 
Title: Re: MODOT Contract Lettings
Post by: mvak36 on January 10, 2018, 11:15:45 AM
Article about major construction projects for 2018 in the Kansas City (https://www.kshb.com/news/local-news/major-roadwork-ahead-in-2018) area. 2018 construction list in Southwest Missouri (http://www.modot.org/southwest/documents/2018ConstructionGuide.pdf). If I find any other articles for other regions in the state, I will update this post.

Also, a gas tax increase (http://www.newspressnow.com/news/local_news/missouri-lawmakers-to-consider-increase-to-state-s-gas-tax/article_6f17da99-c8c0-5ade-9b89-32c2b975c5a8.html) will be debated again this year in the legislature. The 21st Century Missouri Transportation System Task Force recommended (http://www.stltoday.com/news/local/govt-and-politics/gas-tax-increase-may-land-on-missouri-ballot-after-task/article_0f914fc3-7c51-507c-8344-9969cea5bfd7.html) an increase of 10 cents, among other revenue sources (http://www.news-leader.com/story/news/politics/2018/01/07/bridge-tolls-pay-mile-dmv-fees-suggested-future-missouri-highway-funding/1002065001/) for roads. If it passes through the legislature, it will go to a public vote in November. I'm cautiously optimistic it will pass, but then again it is Missouri  :-|.

EDIT: NW Missouri 2018 project list (http://www.kttn.com/the-major-construction-projects-in-northwest-missouri-that-modot-will-tackle-in-2018/)

Title: Re: MODOT Contract Lettings
Post by: mvak36 on January 10, 2018, 01:26:12 PM
MODOT will be converting the I-70/I-435 interchange (http://www.modot.org/kansascity/major_projects/I-435_I70_Interchange.htm) near the stadiums to a partial turbine interchange. Say goodbye to those left hand exits.

https://www.kshb.com/news/local-news/big-change-coming-to-busy-interchange-in-kcmo.
Quote
KANSAS CITY, Mo. -- Changes are coming to the I-70 and I-435 interchange near Arrowhead and Kauffman Stadium.

The interchange sees about 100,000 cars every day. It's also seen several crashes over recent years, especially involving tractor trailer roll overs.

"On those ramps, there are pretty tight turns, especially for tractor trailers. And if they aren't paying enough attention, they simply cannot navigate it and the trucks tip over," said Chris Redline, the Assistant District Engineer for MoDOT.

That was the case Wednesday morning when a tanker truck rolled over and spilled chicken fat in the interchange, causing a ramp closure for more than five hours.

In 2019, MoDOT will start replacing some of the bridges in the interchange to help make is safer. They will be building what is called a "Partial Turbine" configuration.

As part of the project, crews will make the two loop ramps less sharp and more rounded. The interchange will also get rid of the two left exits from I-435 to I-70 and instead feature flyovers around the interchange. This will help with congestion on I-435, especially during the evening commute.

The project is estimated at $40 million and is fully funded by MoDOT.

When the project starts next year, there will be ramp closures and even full closures of parts of I-70 as they tear down and rebuild the bridges.

EDIT: The I-70 Second Tier Combined Final Environmental Impact Statement (http://www.modot.org/kansascity/metroi70/documents/I-70SecondTierFEISandROD.PDF) has been submitted.  They do not have funding (http://kcur.org/post/modot-has-plan-improve-i-70-around-kansas-city-no-timeline#stream/0) for construction except for the I-70/I-435 interchange and the recently completed Manchester Trafficway bridges.

http://www.modot.org/kansascity/metroi70/
Quote
The I-70 Second Tier Combined Final Environmental Impact Statement and Record of Decision document has been submitted for publication in the Federal Register on Jan. 19, 2018.

MoDOT and FHWA combined the Final Environmental Impact Statement (FEIS) and Record of Decision (ROD) in accordance with provisions on environmental documentation in the Moving Ahead for Progress in the 21st Century Act (MAP-21) and the Fixing America's Surface Transportation (FAST) Act.  MoDOT and FHWA have addressed all agency and public comments from the DEIS in the combined FEIS/ROD.

The combining of the FEIS and ROD means that there will be no comment period on the FEIS.  However, MoDOT and FHWA previously invited comments based on information provided in an EIS update packet provided to DEIS commenters and made available on this website.

With the signing of the combined FEIS/ROD, FHWA approves MoDOT Preferred Alternative as the Selected Alternative for I-70 between the Paseo Boulevard and Blue Ridge Cutoff in Kansas City, Missouri.

The final study document is now available on this website, as well. 

MoDOT thanks all the community members, organizations and agencies who participated in the study and helped us develop the preferred environmental alternative.
Title: Re: MODOT Contract Lettings
Post by: mvak36 on January 12, 2018, 03:31:34 PM
February 16, 2018 Letting: Bid Results (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=7220). Bid Award Winners (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=7260).

Notable Projects:
Job J2P3104 Route 15 SHELBY County. Resurface from Rte. 168 at Shelbyville to just north of Rte. 36 at Shelbina, the total length of improvement being 6.909 miles.
Job J2S3125 Route 161 MONTGOMERY County. Bridge replacement over I-70 near Mineola, the total length of improvement being 0.44 miles. Job J3I3128 Route I-70 LAFAYETTE County. Sign installation westbound in Odessa, the total length of improvement being 0.918 miles.
Job J4I3198 Route I-70 JACKSON County. Bridge rehabilitation and ADA improvements on 8th Street, 9th Street, 10th Street and Chestnut Ave, the total length of improvement being 0.437 miles.
Job J4I3199 Route I-70 JACKSON County. Bridge replacements at Pittman, Crysler and Phelps Road, the total length of improvement being 0.272 miles.
Job J4M0260 Route 70OR JACKSON County. Culvert replacement southeast of Blue Ridge Cutoff interchange, the total length of improvement being 0.008 miles.
Job J4P3144 Route 169 CLAY County. Coldmilling and resurfacing from I-29 to Barry Road, the total length of improvement being 3.99 miles.
Job J4S3204 Route 33 CLAY County. Intersection improvements at 162nd Street in Kearney, the total length of improvement being 0.026 miles.
Job J4S3301 Route 150, BB JACKSON County. Drainage improvements at I-70 between Raytown Road and Horridge Road, the total length of improvement being 0.198 miles.
Job J9I2167 Route I-44 LACLEDE, PHELPS, PULASKI County. Coldmill, resurfacing and bridge rehabilitations from Phelps County to Laclede County across entire Pulaski County, the total length of improvement being 50.1 miles.
Job J6I3159 Route I-55 JEFFERSON County. Crack seal and guardrail from Route M to Route Z in Barnhart, the total length of improvement being 4.317 miles.
Job J6S3231 Route 185 FRANKLIN County. Signal improvements and ADA improvements at East Springfield Road in Sullivan, the total length of improvement being 0.095 miles.
Job J6S3244 Route I-44 FRANKLIN County. Coldmill and resurface from north of Route W in Stanton to end of State Maintenance near Oak Grove Village, including on Route W from I-44 to Brandi King Lane, the total length of improvement being 2.989 miles.
Job J6S3353 Route 141, 340, 180 ST LOUIS County. Pavement Marking in St. Louis County, the total length of improvement being 38.55 miles.
Job J7I3074 Route I-44 LAWRENCE County. Concrete pavement replacement Lawrence County E.B. log mile 33.030 to log mile 37.480, the total length of improvement being 4.45 miles.
Job J7P0881 Route 60 BARRY County. Intersection improvements at Route 37 in Monett., the total length of improvement being 0.366 miles.
Job J7S3207 Route 86 NEWTON County. ADA improvements at various locations from e/o Loop 49 to e/o Rte. HH, the total length of improvement being 1.581 miles.
Job J9P3293 Route 160 HOWELL County. Resurface and add shoulders from Route 101 to just west of Route JJ, the total length of improvement being 13.269 miles.
Job J9P3295 Route 160 OZARK, TANEY County. Resurface from Route 125 South to Route 5 South, the total length of improvement being 24.306 miles.
Job J9S3341 Route 77 MISSISSIPPI, SCOTT County. Resurfacing, and add shoulders from Route 61 to in Benton to 0.8 mile west of Route 105 in Charleston, the total length of improvement being 19.406 miles.

The following three sets of projects was let as one project (for each set):

(1): Job J2P3083 Route 79 PIKE County. Bridge replacement over Ramsey Creek 2.4 miles north of Route H near Annada, the total length of improvement being 0.103 miles.
(2): Job J2P3084 Route 79 PIKE County. Bridge replacement over Fox Creek 1.9 miles south of Route W near Clarksville, the total length of improvement being 0.046 miles.

(1): Job J6I3146 Route I-270 ST LOUIS County. Bridge rehabilitation from 1.9 mile north of Rte. 364 to 1.5 mile south of I-70 in Maryland Heights, the total length of improvement being 0.49 miles.
(2): Job J6S3261 Route I-270 ST LOUIS County. Bridge painting at McKelvey Road over I-270, the total length of improvement being 0.5 miles.

(1): Job J9P3265 Route 25 DUNKLIN, NEW MADRID County. Resurface north to just south of Co Rd 218, the total length of improvement being 5.021 miles.
(2): Job J9S3266 Route 25 DUNKLIN, NEW MADRID County. Resurface to Route 25/Route 62, the total length of improvement being 2.971 miles.
Title: Re: MODOT Contract Lettings
Post by: US71 on January 12, 2018, 03:36:53 PM
February 16, 2018 Letting:

Notable Projects:

Job J7P0881 Route 60 BARRY County. Intersection improvements at Route 37 in Monett., the total length of improvement being 0.366 miles.


Any word on what is planned (more lanes? roundabout)? Seems like every few years, MoDOT redoes this intersection.
Title: Re: MODOT Contract Lettings
Post by: J N Winkler on January 12, 2018, 03:42:40 PM
It looks like they are lengthening the eastbound right-turn lane and possibly also updating the signals.  Plans (about 4 MB) are available at this link:

http://www.modot.org/eBidLettingPublicWeb/viewFileStream.do?documentType=plan&key=5681
Title: Re: MODOT Contract Lettings
Post by: kphoger on January 12, 2018, 03:52:52 PM
February 16, 2018 Letting:

Notable Projects:

Job J7P0881 Route 60 BARRY County. Intersection improvements at Route 37 in Monett., the total length of improvement being 0.366 miles.


Any word on what is planned (more lanes? roundabout)? Seems like every few years, MoDOT redoes this intersection.

It looks like they are lengthening the eastbound right-turn lane and possibly also updating the signals.  Plans (about 4 MB) are available at this link:

http://www.modot.org/eBidLettingPublicWeb/viewFileStream.do?documentType=plan&key=5681

Regarding the signal upgrade...

Quote from: Memorandum—Missouri Department of Trnansportation, SW District
Route 60
Barry County
Intersection Improvement Project at Route 60 and37
Job No. J7P0881
Proprietary Item Certification/Public Interest Finding

With reference to the above-mentioned project, we are requesting approval to use the following
proprietary items.
• Uninterruptable Power Supply: Alpha FXM 1100 system. The system is comprised of the following items:
1 each - Alpha Outdoor Enclosure S6, w/ Generator Option, UATS, UGTS, BCK, AG (Alpha026-053-33)
1 each – FXM 1100, 120Vac Input and Output, 48Vdc Battery Bus, SNMP Kit, AC and DC Breakers with Auxiliary Switch and Ethernet capability (Alpha-017-230-23)
4 each – Battery, AlphaCell Gel 195GXL, 12V, 100Ah @ 20 hrs., Top Terminal (Alpha-181-230-10)

This item is necessary to provide continuous power supply to the traffic signals being installed at this location. We are requesting approval to specify this item in this contract to be consistent with the other installations in the Springfield area. The Southwest District has made this product the standard product for all Springfield area inventories and future usage. It has a proven product support from multiple signal supply vendors (technical support as well as price competition). Our maintenance inventory and repair processes and staff training have been oriented around the usage of this project.

Title: Re: MODOT Contract Lettings
Post by: mvak36 on January 19, 2018, 04:31:17 PM
Construction won't start on this project till 2019, but check out this interchange configuration they are proposing for the I-35/MO152 interchange (http://www.modot.org/kansascity/major_projects/Route_152_Kansas_Street.htm) in Liberty.


What is this type of interchange called? I don't think I have ever seen anything like this before.
Title: Re: MODOT Contract Lettings
Post by: US71 on January 19, 2018, 04:48:13 PM


What is this type of interchange called? I don't think I have ever seen anything like this before.

Ausgeforked ;)
Title: Re: MODOT Contract Lettings
Post by: kphoger on January 19, 2018, 04:51:38 PM
Construction won't start on this project till 2019, but check out this interchange configuration ...
What is this type of interchange called? I don't think I have ever seen anything like this before.

DD½  ???
Title: Re: MODOT Contract Lettings
Post by: intelati49 on January 19, 2018, 05:03:10 PM
Flusterclucke?
Title: Re: MODOT Contract Lettings
Post by: mvak36 on February 02, 2018, 06:53:34 PM
They have posted construction plans for 2018 for the I-435 South Loop Link (http://www.modot.org/kansascity/major_projects/I435South/) project.

https://drive.google.com/file/d/1jLE0-9xQKjd_WKasqSrmFThppuuOIzl6/view
https://drive.google.com/file/d/1LpH_hslKRxTv40EQ5U5rgPhys8Dd5Y3u/view
https://drive.google.com/file/d/1m4i0YTt_XfeESko88iubMJE81jccOy1I/view
https://drive.google.com/file/d/1SjsyHVhm20yKsUlfGmdiyunDbUFcakyF/view

With the construction on I-435 Westbound on the Kansas side, it's probably a good idea to avoid 435 during the rush hours.
Title: Re: MODOT Contract Lettings
Post by: mvak36 on February 09, 2018, 08:47:33 AM
March 16, 2018 Letting: Bid Results (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=7280). Bid Award Winners (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=7301).


Notable Projects:
Job J1S0579 Route 13 DAVIESS County. Bridge replacement over Honey Creek, 0.5 miles north of Route HH near Gallatin, the total length of improvement being 0.103 miles.
Job J1S3125 Route 116 CLINTON County. Culvert replacement over McGuire Creek 1.7 miles west of Route 169 near Gower, the total length of improvement being 0.02 miles.
Job J2P3059D Route 94 MONTGOMERY County. Bridge rehabilitation over Loutre River 0.1 mile west of Rte. 19 near McKittrick, the total length of improvement being 0.095 miles.
Job J3I3010 Route I-70 LAFAYETTE County. Grading, paving and bridge over Route E and Route H, the total length of improvement being 0.49 miles.
Job J3P3086 Route 65 PETTIS County. Coldmill and Resurface from Saline County Line to Route 765 north of Sedalia, the total length of improvement being 13.945 miles.
Job J5M0277 Route OR 44 PULASKI County. Culvert replacement 0.1 mile west of outer road and Route 7 intersection, the total length of improvement being 0.243 miles.
Job J6I2418 Route I-70 ST CHARLES County. Grading, paving and bridge from West of Route K to T.R. Hughes Blvd, the total length of improvement being 1.61 miles.
Job J6I3166 Route 70/270 ST LOUIS County. Concrete pavement repair at the 70/270 access ramps including Route 180 interconnecting ramps, the total length of improvement being 1.044 miles.
Job J6M0265 Route BL 44 FRANKLIN County. Culvert Repair on Route I-44 BL (Osage St) west of Intergram Drive in Pacific, the total length of improvement being 0.059 miles.
Job J6P0876R Route 21 JEFFERSON County. Grading and drainage between Old Route 21 and Klable Road, the total length of improvement being 0.776 miles.
Job J6S3220 Route 231 ST LOUIS County. Signal improvements and ADA improvements from Hoffmeister Ave to Jeffersonian Road, the total length of improvement being 0.237 miles.
Job J6S3238 Route 67 ST LOUIS County. Signal improvements at Quailways Dr, Ladue Rd, Chaminade Dr, the total length of improvement being 0 miles.
Job J6I3111 Route I-64 ST LOUIS CITY County. Coldmill and resurface from Sarah Street to Vandeventer Street, the total length of improvement being 1.714 miles.
Job J6S3160 Route 30 JEFFERSON County. Microsurfacing from St. Louis county line to west of Route PP near High Ridge, the total length of improvement being 5.272 miles.
Job J7M0261 Route 59 MCDONALD County. Drainage improvements 0.07 mile north of Route 76 in the city of Anderson, the total length of improvement being 0.056 miles.
Job J0S3018J Route 14 VARIOUS County. ADA improvements in Houston and West Plains, the total length of improvement being 0.749 miles.

The following five sets of projects was let as one project (for each set):

(1): Job J1P3067 Route 136 PUTNAM County. Bridge replacement at West Locust Creek, 6 miles east of Lucerne, the total length of improvement being 0.213 miles.
(2): Job J2P2186 Route 136 PUTNAM County. Bridge replacement at Elm Branch, 3 miles east of Lucerne, the total length of improvement being 0.154 miles.

(1): Job J2P3059B Route 151 SHELBY County. Bridge replacement 1.1 miles east of Route B near Leonard, the total length of improvement being 0.239 miles.
(2): Job J2S3123 Route 151 SHELBY County. Bridge replacement 1.1 miles north of Route MM near Clarence, the total length of improvement being 0.267 miles.

(1): Job J6S3249 Route AC ST LOUIS County. Coldmill and resurface from Lindbergh Blvd to the end of state maintenance, the total length of improvement being 5.667 miles.
(2): Job J6S3250 Route 67 ST LOUIS County. Coldmill and resurface at Route AC intersection, the total length of improvement being 0.064 miles.

(1): Job J8P2293 Route 65 GREENE County. Bridge replacement from 0.2 miles north of Interstate 44 to 0.14 miles south of Interstate 44 in Springfield, the total length of improvement being 0.364 miles.
(2): Job J8P3079C Route 65 GREENE County. Guardrail replacement from Valley Water Mill Road to Kearney Street, the total length of improvement being 1.138 miles.
(3): Job J8P3080B Route 65 GREENE County. Pavement improvements from Valley Water Mill Road to Kearney Street, the total length of improvement being 1.138 miles.
(4): Job J8S3061 Route LP44, Bus 65 GREENE County. Resurface and ADA improvements disconnected sections of Glenstone Ave. from I-44 to Lombard St. in Springfield, the total length of improvement being 0.473 miles.

(1): Job J9S3253 Route 80 MISSISSIPPI, NEW MADRID County. Coldmill, resurface and add shoulder from Route 61 to Route 102, the total length of improvement being 12.561 miles.
(2): Job J9S3254 Route 80 MISSISSIPPI County. Resurface at Route 77 to .2 miles east of County Road 501, the total length of improvement being 2.4 miles. 
Title: Re: MODOT Contract Lettings
Post by: US71 on February 09, 2018, 10:12:44 AM

I got about half of those last night, but I guess it was only a partial list:


    Cedar County Route U: Bridge replacement over Adler Creek near Willowville
        Awarded to Boone Construction Co. of Columbia, for low bid amount of $620,000
    Greene County U.S. Route 65: Pavement rehabilitation on northbound Route 65 to westbound I-44 ramp
        Awarded to Branco Enterprises, Inc. of Springfield for low bid amount of $416,000
    Henry County Route V: Bridge replacement over Tebo Creek south of Calhoun
        Awarded to Boone Construction Co. of Columbia, for low bid amount of $770,000
    Jasper County I-49: Two bridge rehabilitations over the Spring River near Carthage
        Awarded to Capital Paving and Construction, LLC of Jefferson City, for low bid amount of $4.5 million
    Jasper County Missouri Route 66: Sidewalk improvements between Range Line Road and Duquesne Road in Joplin
        Awarded to Emery Sapp & Sons, Inc. of Springfield, for low bid amount of $762,000
    Jasper/Lawrence counties I-44: Resurfacing between 2.5 miles west of the Jasper/Lawrence county line to the Lawrence/Greene county line
        Awarded to Capital Paving and Construction, LLC of Jefferson City for low bid amount of $14.2 million
    Newton County I-44: Two bridge rehabilitations over Shoal Creek in Joplin
        Awarded to Capital Paving and Construction, LLC of Jefferson City for low bid amount of $3.2 million
    Stone County Route V: Bridge replacement over Goff Creek
        Awarded to Hartman & Co. of Springfield for low bid amount of $509,000
    Taney County U.S. Route 160 & Missouri Route 76: Intersection improvements in Forsyth
        Awarded to Lehman Construction, LLC of California for low  bid amount of $845,000
Title: Re: MODOT Contract Lettings
Post by: mvak36 on February 09, 2018, 12:17:58 PM

I got about half of those last night, but I guess it was only a partial list:


    Cedar County Route U: Bridge replacement over Adler Creek near Willowville
        Awarded to Boone Construction Co. of Columbia, for low bid amount of $620,000
    Greene County U.S. Route 65: Pavement rehabilitation on northbound Route 65 to westbound I-44 ramp
        Awarded to Branco Enterprises, Inc. of Springfield for low bid amount of $416,000
    Henry County Route V: Bridge replacement over Tebo Creek south of Calhoun
        Awarded to Boone Construction Co. of Columbia, for low bid amount of $770,000
    Jasper County I-49: Two bridge rehabilitations over the Spring River near Carthage
        Awarded to Capital Paving and Construction, LLC of Jefferson City, for low bid amount of $4.5 million
    Jasper County Missouri Route 66: Sidewalk improvements between Range Line Road and Duquesne Road in Joplin
        Awarded to Emery Sapp & Sons, Inc. of Springfield, for low bid amount of $762,000
    Jasper/Lawrence counties I-44: Resurfacing between 2.5 miles west of the Jasper/Lawrence county line to the Lawrence/Greene county line
        Awarded to Capital Paving and Construction, LLC of Jefferson City for low bid amount of $14.2 million
    Newton County I-44: Two bridge rehabilitations over Shoal Creek in Joplin
        Awarded to Capital Paving and Construction, LLC of Jefferson City for low bid amount of $3.2 million
    Stone County Route V: Bridge replacement over Goff Creek
        Awarded to Hartman & Co. of Springfield for low bid amount of $509,000
    Taney County U.S. Route 160 & Missouri Route 76: Intersection improvements in Forsyth
        Awarded to Lehman Construction, LLC of California for low  bid amount of $845,000

I apologize. I haven't updated the January bids and the Bid award summary. I will update the post later.
https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=7160
https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=7200
Title: Re: MODOT Contract Lettings
Post by: mvak36 on February 28, 2018, 09:28:10 AM
http://www.kctv5.com/story/37610649/modot-to-permanently-close-ramp-from-nb-i-435-to-rt-210

They're demolishing the flyover from 435 NB to 210 WB. This will enable them to finally get rid of the lane drop near that intersection and make it three continuous lanes through there.

The I-435/Rte 210 project is supposed to be completed by the end of this year.

Next year they will start the  I-70/I-435 interchange project (http://www.modot.org/kansascity/major_projects/I-435_I70_Interchange.htm) (tentative letting this August). That will get rid of the left exits at that interchange and most of the 435 beltway in KS and MO won't have any left exits (with the exception of the MO-350 exit off of 435 SB and the 435EB to 71NB ramp). It should be at least three lanes everywhere except between exits 22 and 49. The concurrency with I-29 is also at least 3 lanes.

I think I got everything but I probably missed something. Feel free to correct me if you guys see any wrong info.

EDIT: 435 is only two lanes through the Grandview Triangle interchange.
Title: Re: MODOT Contract Lettings
Post by: mvak36 on March 15, 2018, 09:04:21 PM
April 20, 2018 Letting: Bid Results (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=7321). Bid Award Winners (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=7381).

Notable Projects:

Job J1L1800B Route MO 139 PUTNAM, SULLIVAN County. Resurface from Iowa State Line to Rte. 6 in Sullivan County, the total length of improvement being 32.793 miles.
Job J2P3169 Route C, 24 RALLS, RANDOLPH County. Bridge rehabilitation on Rte. 24 over Rte. 36 near Monroe City and Rte. C over Rte. 24 near Huntsville, the total length of improvement being 0.206 miles.
Job J2S3170 Route F, Wildcat Drive WARREN County. Bridge rehabilitation Route F over I-70 and Wildcat Drive over I-70, the total length of improvement being 0 miles.
Job J5S3162 Route I-44 Outer Rd LACLEDE County. Grading, drainage, paving and bridge from 0.9 miles south of Hazelgreen over the Gasconade River, the total length of improvement being 0.64 miles.
Job J6I3248 Route I-270, MO 370 ST LOUIS County. Bridge rehabilitation at the I-270/MO 370 interchange, the total length of improvement being 0.151 miles.
Job J6P3211 Route 364 ST CHARLES County. Pavement Improvements from 0.7 mile west of Mid Rivers Mall Drive to 0.5 mile east of Central School Road, the total length of improvement being 1.496 miles.
Job J6S3208 Route I-44 Outer Rd ST LOUIS County. Grading on Votaw Levee along I-44 outer road in Eureka, the total length of improvement being 0.222 miles.
Job J6S3262 Route 94 ST CHARLES County. Seal Coat from Route H/J to Route 67, the total length of improvement being 9.603 miles.
Job J8I3109 Route I-44 GREENE County. Bridge rehabilitation crossing over Kearney Street in the southwest Springfield, the total length of improvement being 0.091 miles.
Job J8P3132 Route 60, 65 GREENE County. Guardrail improvements at the ramp interchanges in Greene County, the total length of improvement being 0.893 miles.
Job J9I3307 Route I-55 SCOTT County. Bridge deck replacement over I-57/US 60, the total length of improvement being 0.46 miles.
Job J9P3104 Route 51 PERRY County. Bridge rehabilitation over Mississippi River at Chester, the total length of improvement being 0.535 miles.
Job J9P3128 Route 21 IRON County. Bridge replacement over Carver Creek, the total length of improvement being 0.157 miles.
Job J9P3246 Route 67 MADISON County. Slope repair in various locations on Route 67, the total length of improvement being 51.73 miles.   
Title: Re: MODOT Contract Lettings
Post by: mvak36 on March 26, 2018, 09:37:34 AM
I found links to the INFRA grants that MODOT applied for: http://www.modot.org/plansandprojects/documents/TheMerchantsBridgeRehabilitationProgram110217Final.pdf and http://www.modot.org/plansandprojects/documents/MissouriDOT-INFRA-Grant-2017-10-30-v3.pdf

The second link is more interesting because if they get the grant, there could be a lot of important projects that they could do, including widening I-70 from Wentzville to Warrenton, the I-270 North Project, and the I-70 Missouri River bridge.

(https://www.aaroads.com/forum/gallery/12408_26_03_18_9_35_25.jpeg)
Title: MODOT Contract Lettings
Post by: mvak36 on March 26, 2018, 10:20:16 AM
They will be doing a bridge slide of the Poplar Street Bridge this Saturday as part of the Poplar Street Ramp Project (http://www.modot.org/stlouis/major_projects/PoplarStreetRampproject.htm): http://www.stltoday.com/news/traffic/along-for-the-ride/workers-will-pick-up-half-the-poplar-street-bridge-on/article_5c471100-d805-5ade-aa4e-4254114971b0.html

Time lapse video: http://fox2now.com/2018/04/02/modot-shares-time-lapse-video-of-historic-poplar-bridge-slide/amp/
Title: Re: MODOT Contract Lettings
Post by: mvak36 on April 13, 2018, 03:59:40 PM
May 18, 2018 Letting: Bid Results (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=7401). Bid Award Winners (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=7441).

Notable Projects:

Job J2M0275 Route 19 MONTGOMERY County. Pavement repair on north and south ends of bridge over Norfolk Southern Railroad 0.2 mile north of Route WW near New Florence, the total length of improvement being 0.644 miles.
Job J3P3107 Route 10 RAY County. Resurface from Clay county line to Route C, the total length of improvement being 10.894 miles.
Job J4I3169 Route I-35 CLAY County. Fence replacement along outer roads of I-35 (Church Rd, Steward Rd, and Palmer Rd), the total length of improvement being 2.718 miles.
Job J4I3300 Route I-29 PLATTE County. Median fence installation from n/o Barry Road to n/o 56th Street, the total length of improvement being 3.649 miles.
Job J4P3206 Route 50 JACKSON County. Intersection improvements at Buckner Tarsney Road, the total length of improvement being 0.3 miles.
Job J4S3243 Route 24 JACKSON County. Slope repair 0.9 miles east of I-435, the total length of improvement being 0.125 miles.
Job J5P3200 Route OR50 COLE County. Pavement improvements includes ramps to Route 50 and Truman Blvd interchange, portions of Missouri Blvd, Truman Blvd and Big Horn Drive in Jefferson City, the total length of improvement being 2.184 miles.
Job J6I3189 Route I-44 FRANKLIN County. Resurface and guardrail upgrades from Route 30 to Crawford County Line, the total length of improvement being 15.289 miles.
Job J6I3268 Route I-44, I-70 ST LOUIS CITY County. Pedestrian bridge replacement west of Kingshighway and west of Madison, the total length of improvement being 0.17 miles.
Job J6S3228 Route D ST LOUIS CITY County. Signal replacement and ADA improvements in various locations on Page Boulevard from Clara Avenue to Grand Avenue, the total length of improvement being 3.21 miles.
Job J6S3235 Route 30 ST LOUIS CITY County. Signal and ADA improvements from River Des Peres to Spring, the total length of improvement being 3.325 miles.
Job J6S3358 Route 367 ST LOUIS CITY County. Resurface and ADA improvements at Halls Ferry Circle, the total length of improvement being 0.943 miles.
Job J6S3360 Route OR 64 ST LOUIS County. Resurface from Chesterfield Parkway to I-270, the total length of improvement being 10.79 miles.
ob J6S3361 Route 100, D ST LOUIS CITY County. Signal and ADA improvements in 7 locations on MO 100 and 8 locations on Route D, the total length of improvement being 0 miles.
Job J7I3342 Route I-44 GREENE County. Bridge replacement 2.3 miles east of Route P, over Pickerel Creek, the total length of improvement being 0.53 miles.
Job J9P3064 Route 67 WAYNE County. Bridge replacement one miles south of Route EE, the total length of improvement being 0.099 miles.

The following four sets of projects were let as one project (for each set):
(1): Job J6P3144 Route 67 JEFFERSON County. Paving, grading and drainage at Montauk Road north of Olympian Village, the total length of improvement being 0.146 miles.
(2): Job J6P3145 Route 67 JEFFERSON County. Paving, grading and drainage at Victoria Road north of Olympian Village, the total length of improvement being 0.371 miles.

(1): Job J9P3197 Route 60 SHANNON County. Resurface eastbound lane from Route 19 to Winona, the total length of improvement being 2.601 miles.
(2): Job J9P3198 Route 60 SHANNON County. Resurface eastbound lane from County Road 583 to Route P, the total length of improvement being 5.032 miles.

(1): Job J9P3288 Route 5 WRIGHT County. Shoulder improvements from Route Z to Route 60, the total length of improvement being 10.274 miles.
(2): Job J9P3425 Route 5 WRIGHT County. Shoulder improvements from Route H/M to Route Z, the total length of improvement being 13.314 miles.

(1): Job J9S3203 Route V CAPE GIRARDEAU County. Bridge deck replacement over Little Indian Creek, the total length of improvement being 0.142 miles.
(2): Job J9S3216 Route KK CAPE GIRARDEAU County. Bridge deck replacement over Little Apple Creek, the total length of improvement being 0.134 miles.
(3): Job J9S3292 Route KK CAPE GIRARDEAU County. Resurface from Route B to Route 61, the total length of improvement being 8.632 miles.
 

Title: Re: MODOT Contract Lettings
Post by: mvak36 on April 23, 2018, 11:27:30 AM
http://www.kansascity.com/opinion/editorials/article209505129.html

They might be considering a gas tax increase in the legislature this week. If they pass a 10 cent gas tax increase (I'm not holding my breath), it could go to a public vote depending on how the increase is implemented. If it's all at once, then it would go to a public vote. If it's phased in over something like 5 years then it might not need to go to one. I'm not sure what the threshold is that triggers a public vote.
Title: Re: MODOT Contract Lettings
Post by: mvak36 on May 17, 2018, 02:55:03 PM
June 22, 2018 Letting: Bid Results (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=7461). Bid Award Winners (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=7501).

Notable Projects:

Job J1P3103 Route 169 CLINTON County. Bridge replacement over Castile Creek, 1 mile south of Gower, the total length of improvement being 0.195 miles.
Job J5P3185 Route 54 COLE, MILLER County. 9 Bridge rehabilitations 0.3 miles west of Route V in Miller County to Route 17 in Cole County, the total length of improvement being 0.704 miles.
Job J6I3170 Route I-64 ST LOUIS CITY County. Bridge rehabilitation from 18th street to Broadway, the total length of improvement being 0.901 miles.
Job J6M3409 Route I-55 ST LOUIS CITY County. Inlet top replacements from Weber Road to Broadway and Broadway to 1300' east of Broadway, the total length of improvement being 3.408 miles.
Job J9P3428 Route 19 SHANNON County. Resurfacing and shoulders from Riverview Drive to north of Route 60, the total length of improvement being 12.074 miles.
Job J9P3505 Route 67 ST FRANCOIS County. Intersection improvement 1.0 miles south of Route 221 in Farmington, the total length of improvement being 0.852 miles.
Title: Re: MODOT Contract Lettings
Post by: mvak36 on May 19, 2018, 12:11:03 PM
http://www.kansascity.com/news/politics-government/article211433409.html

Gas tax increase will go to the voters this November. If they vote to increase it, gas taxes will go up 2.5 cents per gallon every year for the next four years.
Title: Re: MODOT Contract Lettings
Post by: edwaleni on May 19, 2018, 02:35:03 PM
http://www.kansascity.com/news/politics-government/article211433409.html

Gas tax increase will go to the voters this November. If they vote to increase it, gas taxes will go up 2.5 cents per gallon every year for the next four years.

I am not a tax nut but this is needed. I support a 5 cent fed gas tax as well. 8 cents on diesel. I would support 2 more cents for both to support Amtrak so they can have their own trust fund and stop the madness with them.
Title: Re: MODOT Contract Lettings
Post by: mvak36 on July 16, 2018, 12:40:38 PM
August 17, 2018 Letting: Bid Results (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=7521). Bid Award Winners (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=7561).

Notable Projects:

Job J1I3019 Route I-29 HOLT County. Resurface from Davis Creek Bridge to Route 59 Interchange Near Mile Marker 67, the total length of improvement being 16.541 miles.
Job J4S3283 Route 350 JACKSON County. Slide repair WB off ramp to 63rd Street, the total length of improvement being 0.112 miles.
Job J5M0283 Route I-44 Spur PULASKI County. Pipe repair at Eastlawn Avenue in St. Roberts, the total length of improvement being 0.02 miles.
Job J6P3355 Route 364 ST LOUIS County. Detention structure clean out at the Bennington Detention Basin, the total length of improvement being 0 miles.
Job J7P3142 Route 176, EE TANEY County. Coldmill and resurface from Route 160 W Junction to Route 160 E Junction and from 176 W Junction to 176E Junction, the total length of improvement being 6.155 miles.
Job J9P3509 Route 21 REYNOLDS County. Drainage structure replacement 0.1 mile north of Route 21/106 intersection in Ellington, the total length of improvement being 0.014 miles.
Job J9S3498 Route Bus 60 HOWELL County. Bridge replacement over Kings Creek, the total length of improvement being 0.061 miles.   

The following four sets of projects were let as one project (for each set):

(1): Job J1I3192 Route I-35 DAVIESS County. Strip seal gland replacement 3 miles south of Pattonsburg, the total length of improvement being 0.892 miles.
(2): Job J1P3147 Route Various CARROLL, DAVIESS, LINN, LIVINGSTON County. Bridge rehabilitation on various routes and counties in the NW District, the total length of improvement being 0.66 miles.

(1): Job J1P3175 Route 24, 65 CARROLL County. Bridge rehabilitation 1.9 miles north of the Missouri River near Carrollton, the total length of improvement being 0.135 miles.
(2): Job J1P3176 Route 24, 65 CARROLL County. Bridge rehabilitation over Wakenda Creek, 0.5 miles north of Route 10 near Carrollton, the total length of improvement being 0.222 miles.
(3): Job J1P3177 Route 24 CHARITON County. Bridge rehabilitation over Long Creek, 0.7 miles west of Route KK near Keytesville, the total length of improvement being 0.194 miles.
(4): Job J1P3178 Route 24 CHARITON County. Bridge rehabilitation over Chariton River, 0.3 miles west of Route KK near Keytesville, the total length of improvement being 0.184 miles.

(1): Job J1S3076 Route 371 BUCHANAN County. Resurface From Route 752 to Buchanan/Platte Co. Line, the total length of improvement being 13.026 miles.
(2): Job J1S3153 Route 111 HOLT County. Resurface and add shoulders from Route T in Forest City to Route 59 in Oregon, the total length of improvement being 2.493 miles.

(1): Job J4I1597C Route I-70, I-435 JACKSON County. Interchange improvements at the I-70 and I-435 interchange (https://www.modot.org/i-435-and-i-70-interchange), the total length of improvement being 1.05 miles.
(2): Job J4I3124B Route I-70 JACKSON County. Coldmill and resurface from Manchester Trafficway to Blue Ridge Cutoff, the total length of improvement being 1.914 miles.
(3): Job J4I3126 Route I-435 JACKSON County. Coldmill and resurface from Route 78 to Raytown Road, the total length of improvement being 1.56 miles.   
Title: Re: MODOT Contract Lettings
Post by: mvak36 on August 10, 2018, 01:14:57 PM
If anyone is traveling in the Independence area for the next month, you might want to avoid the I-70/I-470/MO291 interchange.

https://www.kansascity.com/news/local/article216370225.html
Title: Re: MODOT Contract Lettings
Post by: mvak36 on August 10, 2018, 01:22:28 PM
September 21, 2018 Letting: Bid Results (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=7581). Bid Award Winners (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=7601).

Notable Projects:
Job J1P3010 Route 148 NODAWAY County. Resurface and add shoulders from Iowa State line to US 71 near Maryville, the total length of improvement being 14.149 miles.
Job J2M0276 Route 63 ADAIR, MACON County. Pavement improvements from 1.2 miles south of Route KK near Kirksville to 0.5 miles north of Route DD near Macon, the total length of improvement being 20.917 miles.
Job J4S3284 Route 69 CLAY, PLATTE County. Grading, drainage, bridge and paving at Frontier Road in Northmoor, the total length of improvement being 0.094 miles.
Job J4P3295C Route 45 PLATTE County. Pavement marking from Route 45 at Riss Lake Dr. and Klamm Road, the total length of improvement being 0.546 miles.
Job J5P3212 Route 21, 32 WASHINGTON County. Resurface from Route 21 in Jefferson County to Route 32 in Iron County and Route 32 from Route 21 to Bismarck in St. Francis County, the total length of improvement being 41.045 miles.
Job J5P3246 Route 54 CAMDEN County. Pavement improvements from east of Key Largo to east of Route 5, the total length of improvement being 6.31 miles.
Job J5S3306 Route 100 OSAGE County. Slide repair along Route 100 just east of Chamois, the total length of improvement being 0.095 miles.
Job J7S3273 Route Loop 44 LAWRENCE County. Coldmill and resurface from I-44 at Route H to west of I-44 at Route 265 in Mt. Vernon, the total length of improvement being 2.88 miles.
Job J7P3374 Route 13 STONE County. Scour repair from North Connection of BUS 13 to .4 Miles South of Rte OO, the total length of improvement being 1.386 miles.Job J9P3501 Route 67 WAYNE County. Slide repair various locations along Rte. 67 in Wayne County, the total length of improvement being 0.316 miles.

The following five sets of projects were let as one project (for each set):
(1): Job J1I3186 Route Various BUCHANAN County. Bridge rehabilitation various bridge ramps in the Saint Joseph area, the total length of improvement being 0.53 miles.
(2): Job J1P3120 Route 36 BUCHANAN County. Bridge rehabilitation in various locations in St. Joseph, the total length of improvement being 0.229 miles.

(1): Job J4P3081E Route 58 CASS County. Resurface and ADA improvements from Route D to Dean/Avenue/Clint Drive in Belton, the total length of improvement being 4.512 miles.
(2): Job J4P3081H Route Y CASS County. Intersection improvements at MO 58 in Belton, the total length of improvement being 0.142 miles.

(1): Job J5S3268 Route Y, CC, HH PHELPS County. Chip seal Route Y from E To SME, Route CC from Route 63 to SEM, Route HH From E to SME, the total length of improvement being 14.795 miles.
(2): Job J5S3364 Route I- 44 Outer Rd PHELPS County. Resurface and guradrail on Arlington Road from Doolittle to 0.3 miles east of Gasconade River, the total length of improvement being 2.914 miles.

(1): Job J7P3130 Route 83 BENTON, HICKORY County. Resurface from Route 65 to Route 54 on Route 83 and from Route 65 to end of Route on Route MM, the total length of improvement being 32.325 miles.
(2): Job J7S3183 Route A ST CLAIR County. Resurface from Route 52 to Route 13, the total length of improvement being 16.938 miles.

(1): Job J9P3199 Route 60 CARTER County. Resurface from 0.4 miles west of Route y to Freemont, the total length of improvement being 0.581 miles.
(2): Job J9P3200 Route 60 CARTER County. Resurface at County Road 143 to Parsons Drive, the total length of improvement being 6.035 miles.   
Title: MODOT Contract Lettings
Post by: mvak36 on September 14, 2018, 12:13:56 AM
October 19, 2018 Letting: Bid Results (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=7621). Bid Award Winners (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=7661).

Notable Projects:
Job J1I3017 Route I-35 HARRISON County. Resurfacing from Route N in Eagleville to Route 136 in Bethany, the total length of improvement being 13.944 miles.
Job J2S2176 Route 139 SULLIVAN County. Bridge replacement 0.6 miles south of Newton, the total length of improvement being 0.157 miles.
Job J2P3127 Route 24, 61 MARION County. Coldmill and resurface on eastbound and westbound lanes from 0.3 mile north of Route F to 3.0 miles east of Route 61 near Taylor, the total length of improvement being 29.183 miles.
Job J3I3047 Route 70 LAFAYETTE County. Resurface from Johnson Dr. to Route 13, the total length of improvement being 10.45 miles.
Job J4P3235 Route 92 CLAY County. ADA improvements from Route 33 to Marimack Drive, the total length of improvement being 0.525 miles.
Job J5P3258 Route 87 HOWARD County. Resurface from Glasgow to Route 40, the total length of improvement being 22.093 miles.
Job J5S3256 Route OR 44 LACLEDE County. Resurface North and South in Lebanon, the total length of improvement being 9.68 miles.
Job J5S3286 Route 87 COOPER, MONITEAU County. Microsurface from Route 5 at Boonville to Route O at California, the total length of improvement being 32.727 miles.
Job J6P2325 Route 370 ST CHARLES County. Bridge rehabilitation over Route 94, the total length of improvement being 0.113 miles.
Job J6I3384 Route I-70, I-170, I-55 VARIOUS County. Signing improvements various locations on I-70, I-170, and I-55 in St. Charles County, St. Louis County, St. Louis City, and Jefferson County, the total length of improvement being 20.09 miles.
Job J7P3132 Route 54, LP49 VERNON County. Resurface from Webster Street to I-49 and on Loop 49 through Nevada, the total length of improvement being 5.425 miles.
Job J9P3129 Route 49 IRON County. Bridge replacement over Big Creek, the total length of improvement being 0.404 miles. 

The following six sets of projects were let as one project (for each set):
(1): Job J5S3259 Route C COLE, MONITEAU, MORGAN County. Microsurface and resurface from Route 52 near Versailles to Route 54 in Jefferson City, the total length of improvement being 38.918 miles.
(2): Job J5S3311 Route 50 OR COLE County. Resurface at Route 50, Truman Blvd, Country Club and Big Horn Drive, the total length of improvement being 5.493 miles.

(1): Job J6M0268 Route 44/Maritz ST LOUIS County. Bridge rehabilitation over I-44 in Fenton, the total length of improvement being 0.01 miles.
(2): Job J6M0269 Route I-70 ST LOUIS CITY County. Bridge rehabilitation Adelaide Avenue Bridge over I-70, the total length of improvement being 0.01 miles.

(1): Job J6P3180 Route 141 ST LOUIS County. Coldmill and resurface from I-64 to n/o MO 30, the total length of improvement being 10.955 miles.
(2): Job J6P3200 Route 141 ST LOUIS County. Bridge rehabilitation off-ramp over Woods Mill Road and 141 over Rte 100, Grand Glaize Creek, BNSF RR, and Meramec River, the total length of improvement being 0.491 miles.

(1): Job J7P3139 Route 249 JASPER County. Coldmill and resurface from Route 171 in Carterville to 20th St. in Joplin, the total length of improvement being 7.599 miles.
(2): Job J7S3116 Route LP49 JASPER, NEWTON County. Coldmill and resurface from 10th St. in Webb City to 46th St. in Leawood, the total length of improvement being 6.664 miles.
(3): Job J7S3117 Route LP49 NEWTON County. Coldmill and resurface from south of 46th St. in Leawood to I-49, the total length of improvement being 6.358 miles.

(1): Job J8P3088C Route BUS65 CHRISTIAN County. Intersection improvements South St.,3rd St., & Selmore Rd., the total length of improvement being 0.569 miles.
(2): Job J8P3101 Route BUS 65 CHRISTIAN County. Grading and pavement from Route 65 to just west of Selmore/Route 14 intersection, the total length of improvement being 1.18 miles.

(1): Job J8S3082 Route YY GREENE County. Resurface and add shoulder from 0.2 mile east of Route 65 to Route 125, the total length of improvement being 4.658 miles.
(2): Job J8S3085 Route OR 65 GREENE County. Coldmill and resurface from Division to Sunshine (Eastgate and Ingram Mill), the total length of improvement being 3.286 miles.

EDIT: More projects were added to the letting
Job J5S3049B Route 94 MONTGOMERY County. Resurface from 0.2 mile east of Bluffton Road to Route 19 near McKittrick, the total length of improvement being 9.865 miles.

(1): Job J2I3096 Route I-72 MARION County. Resurface and diamond grinding from 0.2 mile west of Rte. 61 to the Mississippi River in Hannibal, the total length of improvement being 3.299 miles.
(2): Job J2P3128 Route 36 MARION County. Resurface eastbound lanes from 0.4 miles west of BUS. 36 at Monroe City to 0.9 miles east of Route H, the total length of improvement being 12.045 miles.
(3): Job J2P3129 Route 36 MARION County. Resurface and bridge rehabilitation on eastbound lanes from 1.8 miles east of Rte. 24 to Rte. 61 and on westbound lanes from Rte. 61 to 0.5 mile west of Rte. 61 in Hannibal, the total length of improvement being 5 miles.

(1): Job J2P3185 Route 15 MONROE, SHELBY County. Chip seal from 0.2 mile south of Route 36 to Route 154 north junction in Monroe County at Paris, the total length of improvement being 17.89 miles.
(2): Job J2P3190 Route 136 SCHUYLER County. Chip seal from Route 63 to Route A in Downing, the total length of improvement being 11.727 miles.
(3): Job J2P3191 Route 3 RANDOLPH County. Chip seal from Route 24 east junction to Route 129 in Roanoke, the total length of improvement being 9.076 miles.

(1): Job J2S3192 Route E LINCOLN County. Chip seal from Route UU in Silex to Route 61, the total length of improvement being 5.214 miles.
(2): Job J2S3193 Route H LINCOLN County. Chip seal from Route E south junction to Route 47 at Troy, the total length of improvement being 10.988 miles.

(1): Job J9P3196 Route 60 HOWELL County. Resurface from Mountain View to east of Birch Tree, the total length of improvement being 11.474 miles.
(2): Job J9P3202 Route 60 HOWELL County. Resurface from Route NN to County Road 1550, the total length of improvement being 5.338 miles.
(10): Job J3S3141 Route WW JOHNSON County. Seal coat from Route D to Henry CL, the total length of improvement being 7.043 miles.
(11): Job J3S3142 Route E PETTIS County. Seal coat from Route B to Route 52, the total length of improvement being 7.394 miles. 
Title: Re: MODOT Contract Lettings
Post by: mvak36 on September 27, 2018, 09:56:46 AM
MODOT recently upgraded their website so I am updating links to the Bid Results and Bid Award Winners lists.

Also, they're starting an Environmental study for the Buck O'Neil Bridge. https://www.modot.org/node/6555
Quote
A potential new river crossing to replace the John Jordan “Buck” O’Neil Memorial Bridge has entered the next phase. The Missouri Department of Transportation (MoDOT) and the City of Kansas City, Missouri are working with the Federal Highway Administration (FHWA) to undertake an environmental study, which is required prior to rehabilitating or replacing the existing bridge. The study is being conducted by Burns & McDonnell in accordance with the National Environmental Policy Act (NEPA).

The environmental study will build on the recently completed planning and environmental linkages (PEL) study to further evaluate options to improve or potentially replace the U.S. 169 bridge over the Missouri River in Kansas City.

As part of the new study the team will evaluate potential impacts to historic structures, including the existing Buck O’Neil Bridge, and other resources in the study area such as public parks, open spaces, cultural assets, and people and businesses in and around the area.  This process is necessary to be in compliance with Section 106 of the National Historic Preservation Act, and as applicable Section 4(f) of the DOT Act.

The study, which is scheduled to conclude in late 2019, will require significant public input in the coming months. Two formal public meeting will be scheduled in 2019. Learn more about the study at www.modot.org/welcome-kansas-city-district

For more information about MoDOT news, projects or events, please visit our website at www.modot.mo.gov/kansascity. For instant updates, follow MoDOT_KC on Twitter, or share posts and comments on our Facebook at www.facebook.com/MoDOT.KansasCity. MoDOT Kansas City maintains more than 7,000 miles of state roadway in nine counties. Sign up online for workzone updates or call 888-ASK-MODOT (275-6636).
Title: Re: MODOT Contract Lettings
Post by: mvak36 on October 15, 2018, 09:21:16 AM
November 16, 2018 Letting: Bid Results (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=7681). Bid Award Winners (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=7741).

Notable Projects:
Job J1P3188 Route 59 BUCHANAN County. Resurface from Route 752 in St. Joseph to north of Route 45, the total length of improvement being 13.608 miles.
Job J2P2217 Route 65, M LINN, LIVINGSTON County. Alternate Resurfacing from North of CR 228 to Route 36 interchange in Chillicothe and the intersection of Route M and MO 11 to north city limits of Brookfield, the total length of improvement being 1.056 miles.
Job J2P3132 Route 6 ADAIR, SULLIVAN County. Resurface From the Chariton River near Novinger to the east city limits of Green Castle and add rumble strips from the west city limits of Green Castle to Route 129 in Green City in Sullivan County, the total length of improvement being 14.46 miles.
Job J2P3134 Route 79 PIKE County. Resurface and shoulders from 0.9 mile south of Rte. 54 east junction in Louisiana to Lincoln County Line, the total length of improvement being 21.054 miles.
Job J2S3250 Route 81 CLARK, LEWIS County. Resurface from Route 136 in Clark County to Route 16 in Lewis County near Canton, the total length of improvement being 26.273 miles.
Job J3S3087 Route 23 JOHNSON County. Pavement improvements from Route DD to Route 2, the total length of improvement being 16.189 miles.
Job J4I3120 Route I-29 CLAY County. Coldmill and resurface from Vivion Road to I-29/35 split, the total length of improvement being 1.996 miles.
Job J4Q3234 Route Various CLAY, PLATTE County. ITS improvements in various locations in Clay and Platte counties, the total length of improvement being 56.8 miles.
Job J5P3214 Route Various CRAWFORD, IRON County. Microsurface and ADA improvements Rte. 19 & Rte. ZZ in Crawford Co. & Rte. 49 beginning in Crawford Co. and ending in Iron Co., the total length of improvement being 46.86 miles.
Job J5S3271 Route Various CAMDEN, MILLER County. Coldmill, resurface, microsurface and shoulder widening on various locations on Route KK, MM, 242 and Bus. Route 54 in Camden and Miller Counties, the total length of improvement being 7.949 miles.
Job J5P3197 Route 17 MILLER, PULASKI County. Microsurface from Route 42 to I-44 Spur and then from I-44 to Route 32, the total length of improvement being 49.122 miles.
Job J5P3186 Route 63, 133 OSAGE County. Intersection improvements just north of Westpahlia, the total length of improvement being 0.392 miles.
Job J6I3251 Route I-70 ST LOUIS County. Bridge painting over McKelvey Road and Route 141, the total length of improvement being 1.446 miles.
Job J7I3084 Route I-44 JASPER, NEWTON County. Coldmill and resurface from 0.4 miles east of Loop 49 in Joplin to 1.5 miles east of Route 37 in Sarcoxie, the total length of improvement being 37.43 miles.
Job J7P3355 Route 249 JASPER County. Job Order Contract for slide repairs from Rte. 171 in Carterville to Rte. VV (Zora Street) near Joplin, the total length of improvement being 2.314 miles.
Job J9S3294 Route 49 WAYNE County. Resurface from Rte. 34 to Rte. 67, the total length of improvement being 22.056 miles.

The following six sets of projects were let as one project (for each set):
(1): Job J1P3024 Route 5 CHARITON County. Resurface and shoulder widening from Route M to Route O south of Brookfield city limits, the total length of improvement being 19.506 miles.
(2): Job J1S3170B Route 129 CHARITON County. Resurface from Route W to Route PP near Salisbury, the total length of improvement being 7.24 miles.

(1): Job J4I3122 Route I-435 PLATTE County. Coldmill and resurface from I-29 South to west of Cookingham Drive, the total length of improvement being 5.19 miles.
(2): Job J4S3277 Route D PLATTE County. Coldmill and resurface from I-29 to Cookingham Dr, the total length of improvement being 1.413 miles. 

(1): Job J5P3114 Route 63 MARIES, PHELPS County. Coldmill, and resurface from north of Vichy to Rolla, the total length of improvement being 12.49 miles.
(2): Job J5P3233 Route 63 MARIES, OSAGE County. Coldmill and resurface from Route 50 to 4 miles south of Vienna, the total length of improvement being 26.74 miles.

(1): Job J5P3235 Route 63 BOONE County. Coldmill and resurface from Route F/22 Interchange to Route 763, the total length of improvement being 29.606 miles.
(2): Job J5S3159B Route 763 BOONE County. Coldmill and resurface from Bus Loop 70 to Stadium Blvd in Columbia, the total length of improvement being 2.024 miles.

(1): Job J7S3133 Route 160, 13 CHRISTIAN, STONE County. Resurface from 0.4 miles north of Finley Creek to Reeds Spring Junction and on Rte. 13 from Reeds Spring Junction to Table Rock Lake, the total length of improvement being 28.798 miles.
(2): Job J8P3051D Route 160 CHRISTIAN County. Resurface from South Street in Nixa to 0.4 miles north of Finley Creek., the total length of improvement being 3.191 miles.

(1): Job J9S3240 Route H SCOTT County. Resurface from Route 77 to Route U, the total length of improvement being 5.77 miles.
(2): Job J9S3406 Route E SCOTT County. Resurface from Route 77 to Commerce, the total length of improvement being 7.913 miles.
(3): Job J9S3438 Route 61 SCOTT County. Resurface from south of Route K to north of Route 77, the total length of improvement being 12.456 miles.

EDIT: Additional lettings added after the initial listing.
Job J7P3376 Route I-49 MCDONALD County. Demolition of structures from I-49 to the Arkansas state line, the total length of improvement being 5.006 miles.
Job J5S3053 Route 124 BOONE County. Bridge replacement over Grindstone Creek, the total length of improvement being 0.236 miles. 
Title: Re: MODOT Contract Lettings
Post by: mvak36 on November 19, 2018, 07:17:44 PM
December 14, 2018 Letting: Bid Results (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=7761). Bid Award Winners (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=7782).


Notable Projects:
Job J1S3055 Route 111 ATCHISON County. Bridge replacement over Mill Creek, 1 mile south of Route Z near Corning, the total length of improvement being 0.265 miles.
Job J1S3189 Route BUS 71 ANDREW County. Coldmill and resurface from Main Street in Savannah to south of I-29, the total length of improvement being 5.964 miles.
Job J1S3190 Route BUS 71, 59 ANDREW County. Microsurface from Route 71 north of Savannah to Loop 29 in Country Club, the total length of improvement being 7.317 miles.
Job J2P3228 Route 19 MONTGOMERY County. Slide repair at the southeast corner of the intersection with the I-70 south outer road near New Florence, the total length of improvement being 0.163 miles.
Job J4I3124 Route I-70 JACKSON County. Coldmill, resurfacing, and shoulder replacement from E/O Blue Ridge Cutoff to W/W Sterling Avenue, the total length of improvement being 1.217 miles.
Job J5S3247 Route I44 OR CRAWFORD County. Resurface from Rte. C in Bourbon to Rte. H, from Old Rte. 66 to Rte. UU and from Rte. UU to East Grand Street in Cuba, the total length of improvement being 11.65 miles.
Job J5S3372 Route 133 PULASKI County. Scour repair at Bridge A5835 over the Gasconade River, the total length of improvement being 0.027 miles.

The following six sets of projects were let as one project (for each set):
(1): Job J1P3077 Route 6 SULLIVAN County. Bridge replacement 0.5 mile east of Route P near Milan, the total length of improvement being 0.049 miles.
(2): Job J2P0470 Route 6 SULLIVAN County. Bridge replacement 1.3 miles west of Route Z near Humphreys, the total length of improvement being 0.137 miles.

(1): Job J2P3133 Route 54 PIKE County. Resurface from 0.1 mile east of Route U to Dougherty Pike in Louisiana, the total length of improvement being 15.835 miles.
(2): Job J2P3135 Route 54 AUDRAIN, PIKE, RALLS County. Resurface from Route 19 north junction to 0.1 mile east of Route U near Curryville, the total length of improvement being 21.222 miles.
(3): Job J2P3217 Route 54 AUDRAIN, PIKE County. ADA improvements on Routes 54, F, and W in Vandalia and Route 54 in Curryville, the total length of improvement being 1.391 miles.

(1): Job J5S3159 Route 763 BOONE County. ADA improvements from Bus Loop 70 to Route 740, the total length of improvement being 2.024 miles.
(2): Job J5S3218 Route 163 BOONE County. ADA improvements from Vandiver Dr to Route K, the total length of improvement being 1.667 miles.

(1): Job J9P2243 Route 63 TEXAS County. Resurface from Route 32 near Licking to Route E, the total length of improvement being 10.745 miles.
(2): Job J9P3117 Route 63 TEXAS County. Resurface from Route U to Route 60 in Cabool, the total length of improvement being 3.31 miles.
(3): Job J9P3120 Route 60 TEXAS, WRIGHT County. Resurface in the westbound lanes from Rte 95 to Rte. 60/63 interchange, the total length of improvement being 11.66 miles.

(1): Job J9P3126 Route 61 CAPE GIRARDEAU County. Bridge deck replacement over Cape LaCroix Creek, the total length of improvement being 0.1 miles.
(2): Job J9S3280 Route W SCOTT County. Bridge replacement over Drainage Ditch #289, the total length of improvement being 0.035 miles.
(3): Job J9S3286 Route NN CAPE GIRARDEAU County. Bridge replacement over Drainage Ditch #8, the total length of improvement being 0.08 miles.
(4): Job J9S3500 Route N SCOTT County. Culvert replacement 0.3 miles North of Route K, the total length of improvement being 0.095 miles.
(5): Job J9S3506 Route W CAPE GIRARDEAU County. Culvert extension 0.5 miles south of Route Y, the total length of improvement being 0.019 miles.

(1): Job J9S3271 Route 62 SCOTT County. Coldmill and resurface from Route 61 to Route H/AA, the total length of improvement being 2.515 miles.
(2): Job J9S3282 Route 61 SCOTT County. Coldmill and resurface 0.6 miles North of Route Y to Route 60, the total length of improvement being 3.31 miles.
(3): Job J9S3287 Route 114 NEW MADRID, SCOTT, STODDARD County. Coldmill and resurface from Route 60 to Route 61, the total length of improvement being 7.971 miles.
Title: Re: MODOT Contract Lettings
Post by: MikieTimT on November 20, 2018, 11:11:43 AM
November 16, 2018 Letting:

EDIT: Additional lettings added after the initial listing.
Job J7P3376 Route I-49 MCDONALD County. Demolition of structures from I-49 to the Arkansas state line, the total length of improvement being 5.006 miles.
Job J5S3053 Route 124 BOONE County. Bridge replacement over Grindstone Creek, the total length of improvement being 0.236 miles.

Does this mean that Missouri is actually making forward progress on meeting Arkansas at the state line?
Title: Re: MODOT Contract Lettings
Post by: US71 on December 05, 2018, 02:31:05 PM
MODOT Southwest District bid lettings for December 2018

Interstate 44 between Joplin and Sarcoxie: Resurface pavement
        Awarded to APAC-Central of Fayetteville, Ark., for a low bid amount of $8.8 million

Missouri Route 249 in Joplin: Repair erosion along shoulders
        Awarded to Leavenworth Excavating & Equipment of Leavenworth, Kan., for a low bid amount of $603,000

S. Route 160/Missouri Route 13 between Nixa and Kimberling City: Resurface pavement
        Awarded to APAC-Central of Fayetteville, Ark., for a low bid amount of $5.8 million

I-49 in McDonald County: Building removal for future I-49 lanes south of Pineville
        Awarded to Lehman Construction of California, for a low bid amount of $157,000

Various state routes in southwest Missouri: Pavement sealing
        Awarded to Hutchens Construction Company of Cassville, for a low bid amount of $2.5 million

Title: Re: MODOT Contract Lettings
Post by: intelati49 on December 06, 2018, 02:18:54 PM
Missouri Route 249 in Joplin: Repair erosion along shoulders
        Awarded to Leavenworth Excavating & Equipment of Leavenworth, Kan., for a low bid amount of $603,000

I'm not sure I **want** to know how many lettings I have read with this description. Ahh....
Title: Re: MODOT Contract Lettings
Post by: mvak36 on December 06, 2018, 03:18:15 PM
https://www.kansascity.com/news/politics-government/article222727595.html

Quote
The federal government is kicking in a $25 million transportation grant to help replace the aging Buck O’Neil Bridge the city has been working to upgrade.

U.S. Congressman Sam Graves, R-Mo., announced the grant from the U.S. Department of Transportation grant in a press release Thursday afternoon. The federal government is kicking in a $25 million transportation grant to help replace the aging Buck O’Neil Bridge the city has been working to upgrade.

U.S. Congressman Sam Graves, R-Mo., announced the grant from the U.S. Department of Transportation grant in a press release Thursday afternoon.
Title: Re: MODOT Contract Lettings
Post by: mvak36 on December 07, 2018, 08:50:40 AM
Looks like the new MO-47 Missouri River Bridge is open now. This project was funded by a TIGER grant back in 2014.

http://www.emissourian.com/local_news/washington/area-officials-attend-new-bridge-opening-want-focus-now-on/article_2436b894-f816-11e8-a018-3f05b15e5aee.html
Title: Re: MODOT Contract Lettings
Post by: US71 on December 07, 2018, 09:15:13 AM
Looks like the new MO-47 Missouri River Bridge is open now. This project was funded by a TIGER grant back in 2014.

http://www.emissourian.com/local_news/washington/area-officials-attend-new-bridge-opening-want-focus-now-on/article_2436b894-f816-11e8-a018-3f05b15e5aee.html

Opened Monday.  On Saturday it was open for anyone who wanted to walk across it.
Title: Re: MODOT Contract Lettings
Post by: mvak36 on December 11, 2018, 12:01:35 PM
January 18, 2019 Letting: Bid Results (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=7822). Bid Award Winners (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=7863).

Notable Projects:
Job J1I3293 Route I-29 HOLT County. Bridge repair 3.4 miles south of Route W interchange, the total length of improvement being 0.008 miles.
Job J4I3119 Route I-470 JACKSON County. Coldmill and resurface at W/O Raytown Road to 39th Street, the total length of improvement being 13.095 miles.
Job J5I3362 Route I-44 CRAWFORD County. Slide repair EB on-ramp at Route C, J and N interchange in Bourbon, the total length of improvement being 0.023 miles.
Job J5P3361 Route 5 CAMDEN County. Slide repair from 2 miles N/o Rte. 54 to N/o Bus.5/Pier 31 Interchange, the total length of improvement being 0.09 miles.
Job J5P3375 Route 50 OSAGE County. Pavement improvements from Fourth Street to N. Twelfth Street in Linn, the total length of improvement being 0.883 miles.
Job J6I3166B Route I-270, I-70 ST LOUIS County. Pavement improvements along Ramp from SB I-270 to EB I-70, the total length of improvement being 0.825 miles.
Job J6S3134 Route 67 ST LOUIS County. Bridge replacement at Midland/Dorsett over Route 67 (Lindbergh), the total length of improvement being 0.192 miles.
Job J6S3245 Route 110 JEFFERSON County. Resurface and bridge rehabilitation from Route 21 to Route 67, Route CC from Route 67 to Spalding Road and over Fisher Branch, the total length of improvement being 6.106 miles.
Job J9P3311 Route 61, U NEW MADRID County. Resurface from Howardville I-55 overpass to Portageville I-55 overpass and from Route 61 and Route U intersection just south of CR 732, the total length of improvement being 14.632 miles.
Job J9P3407 Route 21 IRON, REYNOLDS County. Resurface from Route 49 east intersection to south of Centerville, the total length of improvement being 19.497 miles.
Job J9P3581 Route 34 CAPE GIRARDEAU County. Bridge rehabilitation over the Mississippi River, the total length of improvement being 0.131 miles.

The following five sets of projects were let as one project (for each set):
(1): Job J1S2166 Route KK DAVIESS County. Bridge rehabilitation 1 mile west of Route 69 near Altamont, the total length of improvement being 0.055 miles.
(2): Job J1S3059 Route 69 CLINTON County. Bridge rehabilitation over I-35, 4.4 miles south of Cameron, the total length of improvement being 0.084 miles.
(3): Job J1S3130 Route DD DAVIESS County. Bridge deck replacement 1 mile east of Route 69 near Pattonsburg, the total length of improvement being 0.049 miles.
(4): Job J1S3131 Route C DAVIESS County. Bridge deck replacement 0.8 mile east of Route 69 near Pattonsburg, the total length of improvement being 0.047 miles.
(5): Job J1S3141 Route B, N DAVIESS County. Bridge deck replacement 3.8 miles west of Rte. 13 near Coffey, the total length of improvement being 0.058 miles.

(1): Job J2P3236 Route 61 LINCOLN County. Intersection improvements at Route 61 and KK Intersection near Troy, the total length of improvement being 0.194 miles.
(2): Job J3P2213 Route 61 LINCOLN County. Bridge replacement 1.7 Miles north of Route 47 near Troy, the total length of improvement being 1.0591 miles.

(1): Job J4P3203 Route 291 CLAY County. Intersection improvements at Kansas Street from I-35 to Route 291, the total length of improvement being 0.423 miles.
(2): Job J4S3083 Route 152 CLAY County. Intersection improvements from Route 152 at I-35 interchange, the total length of improvement being 0.291 miles.
(3): Job J4S3299 Route Kansas Street CLAY County. Grading and paving from I-35 to Route 291, the total length of improvement being 0.555 miles.

(1): Job J4S3088 Route 169 CLAY County. Grading, drainage and paving from NW 68th Street to Englewood Road, the total length of improvement being 0.704 miles.
(2): Job J4S3088B Route 169 CLAY County. Drainage and pavement from 68th Street to Englewood Road to I-29, the total length of improvement being 0.416 miles.

(1): Job J1P3077 Route 6 SULLIVAN County. Bridge replacement 0.5 mile east of Route P near Milan, the total length of improvement being 0.049 miles.
(2): Job J2P0470 Route 6 SULLIVAN County. Bridge replacement 1.3 miles west of Route Z near Humphreys, the total length of improvement being 0.137 miles.
Title: Re: MODOT Contract Lettings
Post by: mvak36 on January 11, 2019, 03:05:43 PM
February 15, 2019 Letting: Bid Results (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=7881). Bid Award Winners (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=7901).

Notable Projects:
Job J1L1800 Route 139 SULLIVAN County. ADA improvements 7.1 miles south of US 136 in Newtown, the total length of improvement being 0.569 miles.
Job J1P3146 Route 169 DEKALB County. Bridge replacement over Third Fork Platte River, 0.3 mile west of Rte. F near Union Star, the total length of improvement being 0.066 miles.
Job J2P2182 Route 24 CHARITON County. Bridge replacement over Mussel Fork River and the overflow bridge, 0.1 mile west of Keytesville, the total length of improvement being 0.583 miles.
Job J2M0276 Route 63 ADAIR, MACON County. Pavement repair from 1.2 miles south of Route KK near Kirksville to 0.5 mile north of Route DD near Macon, the total length of improvement being 20.917 miles.
Job J2P2194 Route 63 SCHUYLER County. Bridge replacement over North Fork Middle Fabius River 1.6 miles north of Route 136 near Lancaster, the total length of improvement being 0.121 miles.
Job J4P3266B Route I-435 JACKSON County. Bridge rehabilitations at I-470 and I-49, the total length of improvement being 2.591 miles.
Job J5S3178 Route 185 WASHINGTON County. Bridge rehabilitation over the Frouche Renualt Creek, 7 miles NW of Potosi, the total length of improvement being 0.08 miles. 
Job J5M0284 Route I-44 PHELPS County. High friction surface treatment near Rolla at Kingshighway, the total length of improvement being 0.46 miles.
Job J5M0285 Route I-70 BOONE County. High friction surface treatment from west of the Rte 63 Connector to the westbound Rte 63 Connector entrance ramp in Columbia, the total length of improvement being 0.48 miles.
Job J6I3266 Route I-270 ST LOUIS County. Bridge painting at the I-270/MO 370 Interchange, the total length of improvement being 1.656 miles.
Job J6P3184 Route 141 JEFFERSON, ST LOUIS County. Coldmill and resurface north of Route 30 to Route 61/67, the total length of improvement being 6.949 miles.
Job J7P0677 Route 32 CEDAR County. Bridge replacement 4.31 Miles West of Rte 39 West of Stockton, the total length of improvement being 0.792 miles.
Job J7P3187D Route 7 BENTON County. Intersection improvements at Commercial Street in Warsaw, the total length of improvement being 0.137 miles.
Job J7S3164 Route LP 49 JASPER County. ADA improvements from 10th St. in Webb City to north of I-44 in Joplin, the total length of improvement being 3.321 miles.
Job J4P3387 Route Various VARIOUS County. Sign installation at various locations in urban KC District, the total length of improvement being 41.86 miles. 

The following five sets of projects were let as one project (for each set):
(1): Job J1P3152 Route 136 PUTNAM County. Bridge deck replacement over Brush Creek, 0.6 mile west of Rte. F near Livonia, the total length of improvement being 0.024 miles.
(2): Job J1S3148 Route EE SULLIVAN County. Bridge deck replacement over Medicine Creek, 0.5 miles east of Route 139 near Newtown, the total length of improvement being 0.047 miles.
(3): Job J1S3149 Route ZZ SULLIVAN County. Bridge deck replacement over West Fork Locust Creek, near Harris, the total length of improvement being 0.026 miles.
(4): Job J1S3151 Route BB SULLIVAN County. Bridge deck replacement over Rooks Branch, 4.4 miles north of Rte. OO near Milan, the total length of improvement being 0.021 miles.

(1): Job J9P3262 Route 25 STODDARD County. Pavement improvement from Advance to Bernie, the total length of improvement being 29.655 miles.
(2): Job J9S3521 Route Y STODDARD County. Pavement improvement from Route 25 to Purina, the total length of improvement being 2.24 miles.

(1): Job J7P3065 Route 43 JASPER County. Intersection improvements intersection of Hearnes Blvd. at 32nd St. in Joplin, the total length of improvement being 0.049 miles.
(2): Job J7P3187B Route FF JASPER, NEWTON County. Intersection improvements at the intersection of Rte. FF and Indiana Ave in Joplin, the total length of improvement being 0.108 miles.
(3): Job J7P3187C Route FF JASPER, NEWTON County. Intersection Improvements the intersection of Route FF and Connecticut Ave, the total length of improvement being 0.091 miles.
(4): Job J7S3131 Route FF JASPER County. Coldmill, resurface and shoulders from Route 43 to I-49 in Joplin, the total length of improvement being 4.56 miles.

(1): Job J7S3137 Route F GREENE County. ADA improvements from north of Main Street to south of Main Street, the total length of improvement being 0.057 miles.
(2): Job J8S3078 Route OR 65 GREENE County. ADA improvements on various routes in Greene county, the total length of improvement being 2.534 miles.

(1): Job J8P3079B Route 65 GREENE County. Guardrail improvements from 0.3 mile north of Rte. D to Rte. 60 in Springfield, the total length of improvement being 4.064 miles.
(2): Job J8P3080 Route 65 GREENE County. Pavement improvements from 0.5 mile south of Rte. D to Rte. 60 in Springfield, the total length of improvement being 2.985 miles. 
Title: Re: MODOT Contract Lettings
Post by: mvak36 on January 29, 2019, 11:59:45 AM
This was from a few weeks ago, but Gov. Parson is proposing $350 million (https://www.kansascity.com/news/business/national-international/article224616695.html) in bonds to repair or replace bridges around the state. If it passes, this is the list of bridges (https://www.modot.org/sites/default/files/documents/STIP%20Bridges%202020-2023%20trimmed%20down_update.pdf) they plan on working on.
Title: Re: MODOT Contract Lettings
Post by: skluth on January 29, 2019, 01:09:23 PM
This was from a few weeks ago, but Gov. Parson is proposing $350 million (https://www.kansascity.com/news/business/national-international/article224616695.html) in bonds to repair or replace bridges around the state. If it passes, this is the list of bridges (https://www.modot.org/sites/default/files/documents/STIP%20Bridges%202020-2023%20trimmed%20down_update.pdf) they plan on working on.

I see that once again the St Louis area is mostly ignored. St Louis City and County combined make about 1/4 of Missouri's population. It has huge infrastructure deficiencies. Yet there are only four total projects out of 229 and $15M out of $344M.
Title: Re: MODOT Contract Lettings
Post by: mvak36 on January 29, 2019, 01:32:32 PM
This was from a few weeks ago, but Gov. Parson is proposing $350 million (https://www.kansascity.com/news/business/national-international/article224616695.html) in bonds to repair or replace bridges around the state. If it passes, this is the list of bridges (https://www.modot.org/sites/default/files/documents/STIP%20Bridges%202020-2023%20trimmed%20down_update.pdf) they plan on working on.

I see that once again the St Louis area is mostly ignored. St Louis City and County combined make about 1/4 of Missouri's population. It has huge infrastructure deficiencies. Yet there are only four total projects out of 229 and $15M out of $344M.

Looks like the KC Star (https://www.kansascity.com/opinion/editorials/article225091015.html) wasn't happy with how Kansas City got shortchanged too.
Title: Re: MODOT Contract Lettings
Post by: mvak36 on February 10, 2019, 07:06:56 PM
March 15, 2019 Letting: Bid Results (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=7921). Bid Award Winners (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=7961).

Notable Projects:
Job J2P3157 Route 54 AUDRAIN County. Grading, pavement and drainage at intersection with Rte. BB and Rte. 19 (Scott's Corner) south of Laddonia, the total length of improvement being 0.35 miles.
Job J2S3194 Route Various MONROE, RANDOLPH County. Bridge painting on Route 3 and Route C over Chariton River in Randolph County and Route AA over Bee Creek in Monroe County, the total length of improvement being 0.172 miles.
Job J5P3015 Route Dix Road COLE County. Bridge rehabilitation from route 50 and 0.23 miles north of Business 50 (Missouri Blvd), the total length of improvement being 0.547 miles.
Job J5P3287 Route 63, AC BOONE, CALLAWAY County. Bridge rehabilitation from Route AC to 3 miles north of Route 54 near Jefferson City, the total length of improvement being 21.624 miles.
Job J5P3373 Route 50 GASCONADE County. Scour repair over the Gasconade River near Mount Sterling, the total length of improvement being 0.164 miles.
Job J5P3377 Route 52 MILLER County. Grading and pavement 1 mile west of Route Y near Eldon, the total length of improvement being 0.367 miles.
Job J5S3173 Route 179 COOPER County. Bridge replacement over Petite Saline Creek, near Wooldridge, the total length of improvement being 0.081 miles.
Job J6I3410 Route I-70 ST CHARLES County. Drainage repair west of Mid Rivers Mall Drive Interchange, the total length of improvement being 0.04 miles.
Job J6M0270 Route I-70 ST CHARLES County. Pavement crack filling in the WBL from e/o Mid Rivers Mall Drive to Fifth Street, the total length of improvement being 6.767 miles.
Job J6P3253 Route 141 ST LOUIS County. Signal replacement from north of I-70 to south of MO 370, the total length of improvement being 2.132 miles.
Job J6S3207 Route 47 FRANKLIN County. Resurface and ADA improvements from East 3rd Street to Norwood Trailer Court, the total length of improvement being 1.521 miles.
Job J6S3230 Route 115 ST LOUIS CITY County. Signal replacement from Euclid to N. Florissant, the total length of improvement being 2.73 miles.
Job J6S3375 Route 30 JEFFERSON County. Slide repair west of Ottomeyer Road, the total length of improvement being 0.11 miles.
Job J7P2173 Route 60 BARRY County. Bridge deck replacement 0.3 miles east of Route 37 in Monett, the total length of improvement being 0.344 miles.
Job J9P3357 Route 61 CAPE GIRARDEAU County. Resurface 0.3 miles south of Route I-55 to Route 34/Route 25, the total length of improvement being 3.611 miles.
Job J9P3247 Route 60, 67 BUTLER, CARTER, MADISON, SHANNON County. Slope repair at various locations along Route 67 and Route 60, the total length of improvement being 59 miles.
Job J9P3252 Route 142 OREGON, RIPLEY County. Resurface from Route EE to 0.2 miles west of Route 160, the total length of improvement being 34.66 miles.

The following seven sets of projects were let as one project (for each set):
(1): Job J2P3273 Route 79 MARION County. Bridge painting over Lyon Street and Warren Barrett Drive 0.4 mile north of Route T in Hannibal, the total length of improvement being 0.171 miles.
(2): Job J2S3271 Route Reservoir Street MARION County. Bridge painting over Route 79 (Mark Twain Avenue) 0.7 mile south of Route 36 in Hannibal, the total length of improvement being 0.045 miles.
(3): Job J2S3272 Route A MARION County. Bridge painting over Troublesome Creek 0.6 mile south of Route P near Hester, the total length of improvement being 0.042 miles.

(1): Job J2S3070 Route PP MACON County. Bridge replacement over Winn Branch 1 mile west of Rte. V near Macon, the total length of improvement being 0.09 miles.
(2): Job J2S3142 Route 151 SHELBY County. Bridge replacement over Black Creek 0.1 mile north of Rte. M near Leonard, the total length of improvement being 0.08 miles.

(1): Job J5P3363 Route 54 CALLAWAY County. Slide repair 2.3 miles north of Route J at Hillers Creek, the total length of improvement being 0.023 miles.
(2): Job J5S3370 Route 94 CALLAWAY County. Slide repair 3.1 miles East of Portland, the total length of improvement being 0.019 miles.

(1): Job J6P3316 Route 79 ST CHARLES County. Bridge rehabilitations in various locations in the St. Louis District, the total length of improvement being 0 miles.
(2): Job J6S3299 Route 79 ST CHARLES County. Bridge rehabilitation on Salt River Road in St. Charles County, the total length of improvement being 0.091 miles.

(1): Job J7P2228B Route 76 STONE County. Bridge deck replacement over Table Rock Lake near Cape Fair, the total length of improvement being 0.354 miles.
(2): Job J7P3289 Route 248 STONE County. Bridge replacement over Railey Creek, the total length of improvement being 0.097 miles.

(1): Job J9I3306 Route I-57 MISSISSIPPI, SCOTT County. Resurface from Route AA to County Road 401, the total length of improvement being 14.891 miles.
(2): Job J9P3201 Route 60 NEW MADRID, SCOTT County. Resurface from Route 61 to Route AA, the total length of improvement being 2.453 miles.

(1): Job J9L19TRA Route Trail of Tears CAPE GIRARDEAU County. Resurface in Trail of Tears State Park, the total length of improvement being 5.835 miles.
(2): Job J9S3365 Route OR 55 CAPE GIRARDEAU County. Resurface from end of state maintenance to Route 61, the total length of improvement being 3.924 miles.

(1): Job J6S3141 Route 109 ST LOUIS County. Bridge rehabilitation over Route 100, the total length of improvement being 0.104 miles.
(2): Job J6S3141B Route 109 ST LOUIS County. Add roundabout at Route 100, the total length of improvement being 0.3492 miles.
(3): Job J6S3141C Route 109 ST LOUIS County. Add bicycle/pedestrian trail s/o Route 100 to Cambury Lane, the total length of improvement being 0.281 miles.
(4): Job J6S3141D Route 109 ST LOUIS County. Add roundabout at Main Street, the total length of improvement being 0.19 miles.
Title: Re: MODOT Contract Lettings
Post by: US71 on February 10, 2019, 09:04:03 PM
[Job J7P2173 Route 60 BARRY County. Bridge deck replacement 0.3 miles east of Route 37 in Monett, the total length of improvement being 0.344 miles.

EB or WB ? If memory serves correct, that bridge was widened sometime within 10 years.
Title: Re: MODOT Contract Lettings
Post by: mvak36 on February 10, 2019, 09:20:07 PM
[Job J7P2173 Route 60 BARRY County. Bridge deck replacement 0.3 miles east of Route 37 in Monett, the total length of improvement being 0.344 miles.

EB or WB ? If memory serves correct, that bridge was widened sometime within 10 years.

Someone feel free to correct me on this since I'm not sure if I understood the plans correctly, but it looks like the Westbound bridge (Bridge L0214).
Title: Re: MODOT Contract Lettings
Post by: mvak36 on March 02, 2019, 12:11:01 AM
https://www.kctv5.com/news/modot-to-begin-work-on-i--and-i-/article_0c1abba8-3c58-11e9-843d-435c08011c65.html
Quote
KANSAS CITY, MO (KCTV) -- The Missouri Department of Transportation is replacing bridges within the I-435 and I-70 interchange, which will begin this month and will keep ramps closed until December of next year.

Construction begins on the I-435 and I-70 interchange on Thursday, March 7.

MoDOT said improvements include full bridge replacements, removal of left exits, improvements to loop ramp configuration, and crash reduction.

According to MoDOT, the new configuration will be a “partial turbine” and provide a chance to make additional safety improvements.

The construction will take two full construction seasons to complete, so drivers can expect to see significant ramp closures and lane width reductions.

On Thursday, March 7 and Friday, March 8 at 9 a.m., crews will close the right lane of eastbound I-70 from 18th Street to Cleveland Ave. until about 3 p.m. both days to stage signs, equipment, and detour routes.

MoDOT said crews will close the following ramps this March and keep them closed until December 2020:

    Westbound I-70 loop ramp to southbound I-435
        The signed detour will use westbound I-70 to Manchester to turn around on eastbound I-70 to southbound I-435.
    Eastbound I-70 loop ramp to northbound I-435
        The signed detour will use US 40 starting near 31st Street to northbound I-435.
    On-ramp from Manchester to westbound I-70.
    I-70 eastbound exit ramp to Manchester.

Throughout the project, traffic will be most impacted along:

    Northbound I-435 to westbound I-70
    Southbound I-435 to eastbound I-70
    Blue Ridge Cutoff


Project Site: https://www.modot.org/i-435-and-i-70-interchange
Title: Re: MODOT Contract Lettings
Post by: Revive 755 on March 02, 2019, 11:40:08 AM
Job J6P3253 Route 141 ST LOUIS County. Signal replacement from north of I-70 to south of MO 370, the total length of improvement being 2.132 miles.

Interesting how the plan cover sheets shows St.Charles Rock Road as MO 180 near MO 141.  Back when St. Charles Rock Road was under MoDOT's jurisdiction, MO 180 always ended near I-270.
Title: Re: MODOT Contract Lettings
Post by: mvak36 on March 12, 2019, 02:23:24 PM
(1): Job J4P3203 Route 291 CLAY County. Intersection improvements at Kansas Street from I-35 to Route 291, the total length of improvement being 0.423 miles.
(2): Job J4S3083 Route 152 CLAY County. Intersection improvements from Route 152 at I-35 interchange, the total length of improvement being 0.291 miles.
(3): Job J4S3299 Route Kansas Street CLAY County. Grading and paving from I-35 to Route 291, the total length of improvement being 0.555 miles.

Article about the upcoming project in Liberty: https://www.kansascity.com/news/local/article227380354.html
Title: Re: MODOT Contract Lettings
Post by: kphoger on March 12, 2019, 03:05:01 PM
(1): Job J4P3203 Route 291 CLAY County. Intersection improvements at Kansas Street from I-35 to Route 291, the total length of improvement being 0.423 miles.
(2): Job J4S3083 Route 152 CLAY County. Intersection improvements from Route 152 at I-35 interchange, the total length of improvement being 0.291 miles.
(3): Job J4S3299 Route Kansas Street CLAY County. Grading and paving from I-35 to Route 291, the total length of improvement being 0.555 miles.

Article about the upcoming project in Liberty: https://www.kansascity.com/news/local/article227380354.html

I'm looking forward to using this when it's done.
Title: Re: MODOT Contract Lettings
Post by: mvak36 on March 15, 2019, 10:30:53 AM
April 19, 2019 Letting: Bid Results (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=7981). Bid Award Winners (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=8041).

Notable Projects:
Job J1P3103 Route 169 CLINTON County. Bridge replacement over Castile Creek, 1 mile south of Gower, the total length of improvement being 0.195 miles.
Job J1I3238 Route I-29 ANDREW, ATCHISON, BUCHANAN County. Sign installation from the Iowa state line to Platte county, the total length of improvement being 91.3 miles.
Job J2P2217 Route 65, M LINN, LIVINGSTON County. Resurface 0.18 miles north of Co. Rd 228 to Rte. 36 and 0.06 miles north of Brookfield City limits to intersection of Route 11 and Route M, the total length of improvement being 5.336 miles.
Job J3I2195 Route I-70 MONTGOMERY County. Bridge replacement of westbound bridge over Loutre River 2.2 miles west of Rte. 161 near Danville, the total length of improvement being 0.577 miles.
Job J3P3113 Route 50 JOHNSON County. Intersection improvements at Routes AA, 1752, 1801 and W/Z, the total length of improvement being 2.585 miles.
Job J5P3376 Route 54 CAMDEN County. Bridge rehabilitation at the Niangua Arm of the Lake of the Ozarks west of Camdenton, the total length of improvement being 0.237 miles.
Job J6S3379 Route 94 ST CHARLES County. Add J-Turns from O' Fallon Rd. to Wolfrum Rd. in Weldon Spring, the total length of improvement being 1.74 miles.
Job J6S3265 Route 115 ST LOUIS County. Signal and ADA improvements from I-70 to I-170, the total length of improvement being 1.242 miles.
Job J7P2228D Route 160 BARTON County. Bridge replacement from 2.6 miles east of Route J to 0.1 miles west of Route I-49 in Lamar, the total length of improvement being 0.282 miles.
Job J8S3110 Route LP44 GREENE County. Bridge rehabilitation over BNSF Railway between Washington and National, the total length of improvement being 0.191 miles.
Job J8P3137 Route 60, 65 CHRISTIAN, GREENE County. Add intelligent transportation system equipment at various locations in the urban Southwest District, the total length of improvement being 15.8 miles.
Job J0S3019J Route 32 STE GENEVIEVE County. ADA improvements at various locations in Ste. Genevieve, Perryville, Frohna, Whitewater, and Delta, the total length of improvement being 3.438 miles.
Job J9M0276 Route 67, 60 BUTLER County. Conduit and pull box installation from Rte. W on BR 67 to 2nd Street on BR 60 in Poplar Bluff, the total length of improvement being 3.442 miles.

The following three sets of projects were let as one project (for each set):
(1): Job J2S3172 Route C MACON County. Pavement and ADA improvements in Bevier, the total length of improvement being 0.519 miles.
(2): Job J2S3223 Route 149 MACON County. ADA improvements from Trailer Court Lane to Delmar Place in New Cambria, the total length of improvement being 0.488 miles.

(1): Job J2I3225 Route I-70 MONTGOMERY, WARREN County. Sign improvements at various ramp locations, the total length of improvement being 33 miles.
(2): Job J5I3303 Route Various BOONE, CALLAWAY, COOPER County. Sign improvements at various ramp locations, the total length of improvement being 71.895 miles.

(1): Job J9S3275 Route DD STODDARD County. Bridge replacement from 2.25 miles NE of Route Y to 2.39 miles near Vanduser, the total length of improvement being 0.142 miles.
(2): Job J9S3281 Route 77 SCOTT County. Bridge replacement over North Cut Ditch north of Diehlstadt, the total length of improvement being 0.19 miles.


Edit: Additional April Lettings due to floods, etc.,
April 24, 2019 Letting: Bid Results (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=8001). Bid Award Winners (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=8002).

Notable Projects:
(1): Job J1P3335 Route 136 ATCHISON County. Debris removal from Missouri River Bridge to jest west of interchange of Route 136 & I-29, the total length of improvement being 4.82 miles.
(2): Job J1P3337 Route 136 ATCHISON County. Emergency repair from Missouri River Bridge to just west of interchange of Route 136 and I-29, the total length of improvement being 4.82 miles.

(1): Job J1P3336 Route 159 HOLT County. Debris removal from Missouri River Bridge to 1 mile e/o Route P near Fortescue, the total length of improvement being 5.252 miles.
(2): Job J1P3338 Route 159 HOLT County. Emergency repairs from the Missouri River Bridge to 1 mile e/o Route P near Fortescue, the total length of improvement being 5.252 miles.

April 30, 2019 Letting: Bid Results (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=8021). Bid Award Winners (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=8044).

Notable Projects:
(1): Job J1S3339 Route 118 HOLT County. Debris removal from Route 111 to Bridge over Little Tarkio Creek, the total length of improvement being 1.861 miles.
(2): Job J1S3340 Route 118 HOLT County. Emergency repair from Route 111 to Bridge over Little Tarkio Creek, the total length of improvement being 1.861 miles. 
Title: Re: MODOT Contract Lettings
Post by: mvak36 on April 15, 2019, 09:53:20 AM
May 17, 2019 Letting: Bid Results (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=8061). Bid Award Winners (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=8101).

Notable Projects:
Job J1S3055 Route 111 ATCHISON County. Bridge replacement over Mill Creek, 1 mile south of Route Z near Corning, the total length of improvement being 0.265 miles.
Job J4I3189 Route I-435 CLAY County. Bridge deck replacement over the Missouri River, the total length of improvement being 1.14 miles.
Job J3I3145 Route I-70 VARIOUS County. Sign improvements on various ramp locations in the KC District, the total length of improvement being 53.452 miles.
Job J4I3324 Route I-70 JACKSON County. Sign improvements at various ramps in KC District, the total length of improvement being 27.397 miles.
Job J5I3136 Route I-70, 54 CALLAWAY County. Pipe repair east and north of Kingdom City, the total length of improvement being 4.216 miles.
Job J5M0286 Route V PHELPS County. Pavement improvements over I-44 east of Rolla, the total length of improvement being 0.083 miles.
Job J5S3232 Route M, B, 124 BOONE County. Resurface from Route Y to Route DD, includes Route B and Route 125 in Hallsville, the total length of improvement being 2.284 miles.
Job J5P3015 Route Dix Road COLE County. Bridge deck repair over Route 50 and 0.22 miles north of Business 50, the total length of improvement being 0.547 miles.
Job J6P3242 Route 21 JEFFERSON County. Intersection improvements at Amvets Drive in De Soto and Hilltop Mobile Home Court in Hillsboro, the total length of improvement being 0.437 miles.
Job J6P3142 Route 67 JEFFERSON County. Add acceleration lanes at Flucom Road south of Olympian Village, the total length of improvement being 0.76 miles.
Job J6S3267 Route 180 ST LOUIS County. Microsurface from Pennridge/Boenker to I-270, the total length of improvement being 0.14 miles.
Job J6S3196 Route H ST LOUIS CITY County. Resurface from Hall Street to North of I-270 Interchange, the total length of improvement being 3.878 miles.
Job J6M0271 Route 67 ST LOUIS County. Barrier wall improvements along the Hi-Collector Road (West of Lindbergh), the total length of improvement being 0.09 miles.
Job J7P3375 Route 37 BARRY County. Resurface and bridge rehabilitation from Dairy Street to Route 60, the total length of improvement being 0.091 miles.
Job J7P3157 Route 37 JASPER County. Bridge replacement over Center Creek, the total length of improvement being 0.149 miles.
Job J7P3165 Route 54, BL49 VERNON County. ADA improvements on Route 54 and Loop 49 in Nevada, the total length of improvement being 3.45 miles.
Job J7P3108C Route I-44 WEBSTER County. High friction surface treatment 3 miles west of Route B near Northview and on the westbound lanes 2 miles west of Route 38 in Marshfield, the total length of improvement being 2.19 miles.
Job J7P3108B Route Various BARRY, BARTON, BATES, BENTON, CASS, CHRISTIAN, GREENE, HENRY, JASPER, MCDONALD, NEWTON, POLK, ST CLAIR, STONE, TANEY County. Sign improvement various location throughout SW district, the total length of improvement being 39.842 miles.
Job J7S3345 Route Gaines Drive HENRY County. Pavement improvements and intersection improvements from Route 13 to Route 52 in Clinton, the total length of improvement being 1.078 miles.

The following four sets of projects were let as one project (for each set):
(1): Job J1P3128 Route 159 HOLT County. Bridge replacement over Penny Slough Creek, 1.2 miles west of Rte. 111 near Fortescue, the total length of improvement being 0.106 miles.
(2): Job J1S3127 Route 159 HOLT County. Bridge redeck on bridge over I-29 near Mound City, the total length of improvement being 0.112 miles.

(1): Job J3S3117 Route 58 JOHNSON County. ADA and pavement improvements from Charles Street to 9th Street in Holden, the total length of improvement being 1.031 miles.
(2): Job J3S3117B Route 131 JOHNSON County. ADA improvements and resurface from McKossick to 10th Street in Holden, the total length of improvement being 0.488 miles.

(1): Job J8P3093 Route 14 CHRISTIAN County. Pavement improvements from Cedar Heights Drive to Estes Street in Nixa, the total length of improvement being 1.34 miles.
(2): Job J8P3104 Route 14 CHRISTIAN County. ADA improvements from Cedar Heights Drive to Ellen Street in Nixa, the total length of improvement being 1.18 miles.

(1): Job J9I3125 Route I-55 CAPE GIRARDEAU County. Bridge replacements over Route 61, the total length of improvement being 0.808 miles.
(2): Job J9P3460 Route 61 CAPE GIRARDEAU County. Add interchange for diverging diamond from Old Orchard Road to 0.2 miles south of Veterans Memorial Drive, the total length of improvement being 1.53 miles.

Edit: Additional projects added to the letting:
Job J2M0277 Route 15 AUDRAIN County. Pavement improvements from 1.6 to 1.3 miles north of Route 22 near Mexico, the total length of improvement being 0.314 miles.
Job J9P3357 Route 61 CAPE GIRARDEAU County. Resurface from 0.3 miles south of Route I-55 to Route 34/Route 25, the total length of improvement being 3.611 miles.

(1): Job J8P0601B Route 160 GREENE County. Grading and paving from north of County Road 94 to north of I-44 between Willard and Springfield., the total length of improvement being 3.4564 miles.
(2): Job J8P0601C Route 160 GREENE County. Grading and paving from near Route AB to near north of County Road 94 in Willard., the total length of improvement being 2.4867 miles.
(3): Job J8P3150 Route 160 GREENE County. Bridge rehabilitation over Frisco Highline Trail, the total length of improvement being 0.06 miles.

(1): Job J8O3141 Route 160 CHRISTIAN County. Add lanes from Route 160 to Wilderness Road, the total length of improvement being 616 miles.
(2): Job J8P3051C Route 160 CHRISTIAN, GREENE County. Coldmill and resurface From north of Plainview Road to north of Route 14 in and north of Nixa, the total length of improvement being 4.777 miles.
(3): Job J8P3088B Route 160 CHRISTIAN County. Intersection improvements at Northview Road and at Tracker Road in Nixa, the total length of improvement being 0.36 miles.
(4): Job J8P3091B Route 160 GREENE County. Intersection improvements at Farm Road 157 & Farm Road 192, the total length of improvement being 0.682 miles.   
Title: Re: MODOT Contract Lettings
Post by: Revive 755 on April 15, 2019, 10:32:23 PM
(1): Job J9I3125 Route I-55 CAPE GIRARDEAU County. Bridge replacements over Route 61, the total length of improvement being 0.808 miles.
(2): Job J9P3460 Route 61 CAPE GIRARDEAU County. Add interchange for diverging diamond from Old Orchard Road to 0.2 miles south of Veterans Memorial Drive, the total length of improvement being 1.53 miles.

The signing  for the interchange suggests MO 34 is (was?) getting trimmed back to Jackson.
Title: Re: MODOT Contract Lettings
Post by: US71 on May 02, 2019, 10:42:55 PM
May 17, 2019 Letting:

Job J1S3055 Route 111 ATCHISON County. Bridge replacement over Mill Creek, 1 mile south of Route Z near Corning, the total length of improvement being 0.265 miles.

This one has been planned for nearly 5 years according to Bridgehunter.
Title: Re: MODOT Contract Lettings
Post by: mvak36 on May 23, 2019, 11:48:14 AM
June 4, 2019 Letting:


Notable Projects:
1S3344 Route 111 HOLT County. Pavement improvement from Route 118 to Route 159, the total length of improvement being 4.44 miles.


EDIT: Letting Removed from MODOT site.

June 21, 2019 Letting: Bid Results (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=8161). Bid Award Winners (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=8201).

Projects listed in blue font are part of Missouri Focus on Bridges (https://www.modot.org/focus-bridges) program.

Notable Projects:
Job J1I3296 Route I-29 ANDREW, BUCHANAN, HOLT County. Shoulder improvements from Route 59 Interchange at MM 67 to Pigeon Creek bridge, the total length of improvement being 26.994 miles.
Job J1P3250 Route 69,6 DAVIESS, GRUNDY County. Pavement and shoulder repairs starting at I-35 to Trenton, the total length of improvement being 34.475 miles.
Job J4S3287 Route 24 JACKSON County. Bridge replacement 3.6 miles east of I-435, the total length of improvement being 0.104 miles.
Job J4S3392 Route 7 JACKSON County. Pavement improvement from Oakhaven Drive to Rte. 150 South, the total length of improvement being 1.032 miles.
Job J6I3277 Route I-64 ST LOUIS County. Resurface and guardrail improvements west of Ballas to east of Spoede Road, the total length of improvement being 0.604 miles.
Job J6I3415 Route I-70 ST LOUIS CITY County. Bridge deck crack sealing on the Stan Musial Veterans Memorial Bridge, the total length of improvement being 1.22 miles.
Job J6S3276 Route BL 44 ST LOUIS County. Resurface from Neosho Street to E/O Six Flags Road, the total length of improvement being 4.35 miles.
Job J9P3058 Route 72 IRON County. Bridge replacement over Stouts Creek 1.8 miles east of Arcadia, the total length of improvement being 0.264 miles.

The following two sets of projects were let as one project (for each set):
(1): Job J1P3132 Route 24 CHARITON County. Bridge replacement 1.8 miles east of Route 129, east of Salisbury, the total length of improvement being 0.19 miles.
(2): Job J2P2183 Route 24 CHARITON County. Bridge replacement 1.6 miles east of Route 129, east of Salisbury, the total length of improvement being 0.218 miles.


(1): Job J1P3168B Route 129 PUTNAM, SULLIVAN County. scrub seal from Route 136 to Route 6 to Route YY, the total length of improvement being 18.723 miles.
(2): Job J1P3294 Route 6 SULLIVAN County. Scrub seal from Green City to Green Castle, the total length of improvement being 4.14 miles.
Title: Re: MODOT Contract Lettings
Post by: mvak36 on June 05, 2019, 04:57:54 PM
DRAFT Statewide Transportation Improvement Program (DRAFT STIP) for 2020-2024 has been posted online. https://www.modot.org/DRAFTSTIP

Haven't had a chance to look through it really closely yet. As previously expected, the Bella Vista Bypass is listed for a Spring 2020 letting date. :)
Title: Re: MODOT Contract Lettings
Post by: mvak36 on August 07, 2019, 03:10:57 PM
August 16, 2019 Letting: Bid Results (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=8261). Bid Award Winners (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=8301)

Projects listed in blue font are part of Missouri Focus on Bridges (https://www.modot.org/focus-bridges) program.

Notable Projects:
Job J1I3099 Route I-29 HOLT County. Bridge deck replacement over Route E and Kimsey Creek, the total length of improvement being 0.351 miles.
Job J1P3114 Route 65 LIVINGSTON County. Bridge rehabilitation over the Grand River 1.3 mi. s/o US 36 near Chillicothe, the total length of improvement being 0.331 miles.
Job J1S3156 Route 190 LIVINGSTON County. Bridge rehabilitation over Thompson River 0.9 mi. e/o Rte. Y near Chillicothe, the total length of improvement being 0.303 miles.
Job J2P3085 Route 79 LINCOLN County. Bridge replacement 0.1 Mile South of Route N near Winfield, the total length of improvement being 0.094 miles.
Job J2S3196 Route JJ MONTGOMERY County. Bridge replacement 1 mile West of Route E near Bellflower, the total length of improvement being 0.0701 miles.
Job J3S3089 Route J RAY County. Bridge deck replacement over Crooked River, the total length of improvement being 0.148 miles.
Job J4I3219 Route I-35 CLAY County. Bridge deck replacement on 128th Street, the total length of improvement being 0.768 miles.
Job J4I3221 Route Hillcrest Rd JACKSON County. Bridge deck replacement over I-470, the total length of improvement being 0.038 miles.
Job J6I3195 Route I-70 ST CHARLES County. Resurface from W/O Wentzville Pkwy to E/O Lake St. Louis Blvd, the total length of improvement being 6.374 miles.
Job J6M0271 Route 67 ST LOUIS County. Barrier wall improvements along the Hi-Collector Road (West of Lindbergh), the total length of improvement being 0.09 miles.
Job J7P3190E Route 13,64 POLK County. Bridge rehabilitation over North Dry Sac River and over Lindley Creek, the total length of improvement being 0.232 miles.
Job J7P3223 Route 37 BARTON, JASPER County. Resurface from Route 126 in Golden City to Route 96 in Avilla, the total length of improvement being 14.699 miles.
Job J9I3658 Route I-57 MISSISSIPPI County. Pavement improvements at County Road 325 south of Charleston, the total length of improvement being 0.077 miles.
Job 9M0279 Route K CAPE GIRARDEAU County. Add turn lanes at Route 25 intersection and Northwest ramp of I-55 interchange , the total length of improvement being 0.406 miles.
Job J5S3289 Route CC CRAWFORD County. Bridge deck replacement over Brush Creek, the total length of improvement being 0.089 miles.

The following two sets of projects were let as one project (for each set):
(1): Job J2P3182 Route 61 MARION County. Bridge rehabilitation over Rte. 24 outer road 1.5 miles north of Rte. 6 near Taylor, the total length of improvement being 0.155 miles.
(2): Job J2P3342 Route 24 MARION County. Bridge rehabilitation on ramp over Rte. 24 1.6 miles north of Rte. 6 at Taylor interchange, the total length of improvement being 0.324 miles.


(1): Job J7P3214 Route 82 BENTON, CEDAR, ST CLAIR County. Resurface from Route 54 in Cedar County to Route 83 in Benton County, the total length of improvement being 37.778 miles.
(2): Job J7S3180 Route WW ST CLAIR County. Resurface from Business 13 to Route V, the total length of improvement being 4.621 miles.
(3): Job J7S3221 Route HH CEDAR, VERNON County. Resurface from Route 54 in Vernon County to Route BB in Cedar County, the total length of improvement being 6.483 miles.
(4): Job J7S3241 Route H ST CLAIR County. Resurface from Route A to Route 82, the total length of improvement being 18.502 miles.
Title: Re: MODOT Contract Lettings
Post by: mvak36 on August 29, 2019, 10:25:46 AM
August 21, 2019 Letting: Bid Results (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=8281). Bid Award Winners (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=8283)

Notable Projects:
Job J1P3351 Route 41 CARROLL County. Urgent roadway repairs due to flood damage from 1.4 miles south of Route 24 to 1.2 miles north of the Missouri River near DeWitt, the total length of improvement being 0.573 miles.

The following set of projects was let as one project:
(1): Job J1S3342 Route 111 HOLT County. Debris removal from Spur 111, in Craig, to Route 118 intersection near Big Lake, the total length of improvement being 6.196 miles.
(2): Job J1S3343 Route 111 HOLT County. Pavement repair from Spur 111, in Craig, to Route 118 intersection near Big Lake, the total length of improvement being 6.196 miles.
Title: Re: MODOT Contract Lettings
Post by: mvak36 on August 29, 2019, 10:38:44 AM
September 20, 2019 Letting: Bid Results (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=8321). Bid Award Winners (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=8363).

Projects listed in blue font are part of Missouri Focus on Bridges (https://www.modot.org/focus-bridges) program.

Projects:
Job J1S3134 Route YY WORTH County. Bridge replacement over the Middle Fork Grand River, 0.5 mile north of Rte. W near Gentry, the total length of improvement being 0.106 miles.
Job J1S3137 Route A DEKALB County. Bridge replacement over North Fork Lost Creek, 1.6 miles south of Route Z near Maysville, the total length of improvement being 0.261 miles.
Job J1S3129 Route 116 BUCHANAN County. Bridge replacement 3 miles south of Faucett on I-29, the total length of improvement being 0.249 miles.
Job J4P3295B Route Various JACKSON County. Sign installation at various ramps in Jackson County, the total length of improvement being 0 miles.
Job J5I3424 Route I-44 CRAWFORD, LACLEDE, PHELPS, PULASKI County. Pavement repair across entire Pulaski/Phelps/Crawford and a section in Laclede County, the total length of improvement being 167.975 miles.
Job J5S3238 Route Z HOWARD County. Bridge replacement 2.48 miles west of Route 87, the total length of improvement being 0.053 miles.
Job J5S3249 Route HH BOONE County. Bridge redeck over Hinkson Creek, the total length of improvement being 0.169 miles.
Job J6M0277 Route I-70 ST LOUIS County. Coldmill and resurface 2 disconnected sections on Mark Twain Drive (I-70 SOR). East of McKelvey and West of Rte. 180, the total length of improvement being 1.058 miles.
Job J6S3327 Route 115 ST LOUIS County. Bridge rehabilitation over Metrolink Railroad Tracks, the total length of improvement being 0.05 miles.
Job J6S3395 Route Various JEFFERSON County. Sign installation in various locations throughout Jefferson County, the total length of improvement being 0 miles.
Job J4S2276 Route 18 HENRY County. Bridge rehabilitation over Grand River, the total length of improvement being 1.22 miles.
Job J7P3255 Route 7 HENRY County. Coldmill and resurface from 0.3 miles east of Route 13 to Route PP in Tightwad, the total length of improvement being 13.886 miles.
Job J7S3172 Route U JASPER County. Bridge redeck on Route U 0.6 miles north of La Russell, the total length of improvement being 0.118 miles.
Job J8I0445 Route I-44 WEBSTER County. New interchange and roadway at miles marker 103, 0.7 miles northeast of Marshfield, the total length of improvement being 3.758 miles.
Job J9M0277 Route I-55 SCOTT County. Tree clearing from Fruitland Exit 105 to Benton Exit 80, the total length of improvement being 24.78 miles.
Job J0I3005T Route Various STE GENEVIEVE County. Job order contract for asphalt repair from Jefferson County line to Arkansas State line on I-55; all of I-57 and all of I-155, the total length of improvement being 0 miles.
Job J9P3411 Route 32 IRON County. Pavement improvements from Route KK to Route 21, the total length of improvement being 27.317 miles.

The following nine sets of projects were let as one project (for each set):
(1): Job J1S3070 Route T HOLT County. Bridge rehabilitation over Spring Creek, 0.5 mile south of Rte. O near Oregon, the total length of improvement being 0.037 miles.
(2): Job J1S3071 Route T HOLT County. Bridge rehabilitation over Easter Creek, 0.8 mile north of Rte. U near Oregon, the total length of improvement being 0.05 miles.
(3): Job J1S3162 Route H HOLT County. Bridge rehabilitation over Nichols Creek, 0.3 mile east of Rte. B, near Oregon, the total length of improvement being 0.04 miles.
(4): Job J1S3204 Route U ATCHISON County. Bridge rehabilitation 1.3 miles south of Rte. 136 near Phelps City, the total length of improvement being 0.048 miles.


(1): Job J2P3144 Route 24 MONROE County. Resurface from 1.1 miles west of Rte. U to the Rte. 36 interchange at Monroe City, the total length of improvement being 18.697 miles.
(2): Job J2P3183 Route 24 MONROE County. Bridge rehabilitation over Middle Fork Salt River 1.0 miles west of Route 15 near Paris, the total length of improvement being 0.22 miles.
(3): Job J2P3282 Route 24 MONROE County. Resurface from Randolph County line to 1.1 miles west of Route U near Paris, the total length of improvement being 20.1 miles.

(1): Job J2S3172 Route C MACON County. Pavement improvements and ADA improvements in Bevier, the total length of improvement being 0.519 miles.
(2): Job J2S3223 Route 149 MACON County. ADA improvements from Trailer Court Lane to Delmar Place in New Cambria, the total length of improvement being 0.488 miles.

(1): Job J5S3262 Route D CAMDEN County. Bridge rehabilitation over Minnow Brook Creek, the total length of improvement being 0.11 miles.
(2): Job J5S3263 Route C MILLER County. Bridge rehabilitation over Deane Creek, the total length of improvement being 0.113 miles.


(1): Job J7P3187H Route CC WEBSTER County. Intersection improvements on Hubble Drive at Banning Street in Marshfield, the total length of improvement being 0.204 miles.
(2): Job J7S3348 Route CC WEBSTER County. Resurface from Rifle Range Road to Route 38 in Marshfield, the total length of improvement being 2.675 miles.

(1): Job J7S3217 Route Z DOUGLAS, WEBSTER County. Resurface from US 60 to Route 14, the total length of improvement being 11.855 miles.
(2): Job J7S3218 Route KK WEBSTER County. Resurface from Route A to Route B, the total length of improvement being 13.64 miles.
(3): Job J7S3219 Route D GREENE, WEBSTER County. Resurface from Route 125 to Route B, the total length of improvement being 4.125 miles.

(1): Job J7S3224 Route H JASPER County. Resurface from Route 171 to I-49 at Jasper, the total length of improvement being 17.875 miles.
(2): Job J7S3225 Route M JASPER County. Resurface from Route 43 to I-49, the total length of improvement being 9.795 miles.
(3): Job J7S3226 Route MM JASPER County. Resurface from Route 96 to Route D in Oronogo, the total length of improvement being 1.647 miles.
(4): Job J7S3231 Route CC NEWTON County. Resurface from Route 86 near Racine to Route 60, the total length of improvement being 4.587 miles.

(1): Job J8S3114 Route 413 GREENE County. Coldmill and resurface from Route 360 to Route 13 in Springfield, the total length of improvement being 4.986 miles.
(2): Job J8S3121 Route FF GREENE County. Coldmill and resurface from US 60 to south of Weaver Road, the total length of improvement being 1.763 miles.

(1): Job J9P3413 Route 19 SHANNON County. Resurface from Route A to Riverview Drive, the total length of improvement being 18.372 miles.
(2): Job J9P3446 Route 32 TEXAS County. Resurface from Route 17 to Route 63, the total length of improvement being 16.354 miles.

Edit: Added September 27 Letting
September 27, 2019 Letting: Bid Results (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=8341). Bid Award Winners (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=8361).

Job J1S3349 Route CC Atchison County. Culvert Replacement, the total length of improvement being 0.028 miles.
Title: Re: MODOT Contract Lettings
Post by: mvak36 on August 29, 2019, 12:52:11 PM
https://ksisradio.com/modot-to-receive-over-20m-grant-to-replace-bridges/

Quote
MoDOT is set to receive over $20-million in federal grant money to assist in replacing 40 bridges in rural northern Missouri.

Governor Mike Parson's office says MoDOT will be able to replace 40 bridges in the northern part of the state as a result of an announcement by Congressman Sam Graves, in which Missouri has received a $20.7 million federal grant through the U.S. Department of Transportation’s Competitive Highway Bridge Program.

Parson's office says the bridges, all located north of I-70, are in poor condition, weight-restricted, supported by timber pile, and one-lane wide but carry two-way traffic. In addition to removing current detours and preventing future ones, the grant will help increase safety on the state’s rural roads and reduce costs associated with maintaining the bridges.

"Missouri's infrastructure, specifically bridge infrastructure, has been a key focus for our administration since day one. This grant continues the momentum we’ve gained in recent months to invest in infrastructure improvements," Governor Parson said. "Missouri’s farm-to-market roads are critical connections to Missouri’s highways, railways, and waterways, allowing our farmers to compete in the global marketplace. The bridges that will be replaced as a result of this grant would have posed obstacles to that connectivity had they been further weight restricted or closed."

“When this project is complete, there will be no bridges remaining in northern Missouri that meet those criteria,” State Bridge Engineer Dennis Heckman said. He said the bridges, on average, are 77 years old and deteriorating rapidly.

Only 25 states were eligible to apply for the $225 million in the Competitive Highway Bridge Program – those with a population density of 100 or less per square mile, according to a press release from Parson's office. The grant also required that bridges be bundled in a single contract.

MoDOT intends to pursue a design-build contract to deliver this project.

The Competitive Highway Bridge Program grant comes on the heels of an $81.2 million Infrastructure for Rebuilding America (INFRA) grant from the U.S. Department of Transportation to build a new I-70 Missouri River Bridge at Rocheport.

Receipt of the INFRA grant will also trigger $301 million in state bonding, authorized by the Missouri General Assembly during the 2019 legislative session, that will repair or replace another 215 bridges across the state.

“We are poised to deliver these bridge improvement projects as quickly, efficiently, and innovatively as possible,” MoDOT Director Patrick McKenna said. “We are grateful to Congressman Graves, Governor Parson, and Missouri legislators for their support of additional investment in transportation in Missouri.”

Title: Re: MODOT Contract Lettings
Post by: mvak36 on September 13, 2019, 10:59:56 AM
October 18, 2019 Letting: Bid Results (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=8381). Bid Award Winners (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=8421).

Projects listed in blue font are part of Missouri Focus on Bridges (https://www.modot.org/focus-bridges) program.

Projects:
Job J1P1043 Route 116 CLINTON County. Resurface from just east of the City of Plattsburg to just west of Route 33 and Route A in the City of Lathrop, the total length of improvement being 6.11 miles.
Job J1P3144 Route 6 GRUNDY County. Resurface and ADA improvements from 4th street to Muddy Creek, the total length of improvement being 1.728 miles.
Job J1P3165 Route 36 CALDWELL County. Coldmill and resurface from the intersection of Route 13 and Route 36 at Hamilton to Livingston Co. line, the total length of improvement being 13.128 miles.
Job J1S3172 Route 46 NODAWAY, WORTH County. Resurface and shoulder improvements from Route 136 near Ravenwood to Route 169 in Grant City, the total length of improvement being 24.112 miles.
Job J1S3227 Route 129 PUTNAM County. Resurface from the Iowa state line to Route 136 near Unionville, the total length of improvement being 11.048 miles.
Job J2S3178 Route 94 MONTGOMERY, WARREN County. Resurface from Route 19 to Route 47 north junction in Warren County near Marthasville, the total length of improvement being 26 miles.
Job J3S3160 Route W JOHNSON County. Resurface from Route 50 to Route 58, the total length of improvement being 8.828 miles.
Job J4S3210 Route 7 JACKSON County. Coldmill, resurface, ADA improvements and signal improvements from Victor Drive to Wyatt Road in Blue Springs, the total length of improvement being 2.689 miles.
Job J5M0290 Route Various BOONE, CALLAWAY County. Resurface segments of I-70 Outer Roads from 2 miles West of Route 740 in Boone County to Route 54 in Callaway County; Route FF in Callaway County; and Route N in Callaway County from Route B to the Audrain County Line, the total length of improvement being 29.45 miles.
Job J5P3181 Route 54 MILLER County. Grading, pavement and 2 bridges at the Route 54, BR 54, and Osage Hills Road intersection near Lake Ozark, the total length of improvement being 0.805 miles.
Job J5P3241 Route 49 CRAWFORD County. Bridge replacement west of Cherryville over Dry Fork Creek, the total length of improvement being 0.207 miles.
Job J5S3234 Route D CALLAWAY County. Bridge replacement 0.12 Miles South of Outer Road 40 and over I-70 in Williamsburg, Callaway County, the total length of improvement being 0.226 miles.
Job J5S3288 Route CC MONITEAU County. Bridge replacement and Bridge Deck Replacement 0.3 miles and 3.0 miles north of Route C, the total length of improvement being 0.196 miles.
Job J5S3245 Route BB CALLAWAY County. Resurface from Route 54 south to Route AA, the total length of improvement being 12.537 miles.
Job J6I3257 Route I-70 ST LOUIS CITY County. Resurface from Kingshighway Blvd to Branch Street, the total length of improvement being 3.626 miles.
Job J6Q3172E Route Various VARIOUS County. ITS improvement throughout the St. Louis District, the total length of improvement being 0 miles.
Job J6S1908 Route 30 JEFFERSON County. Bridge removals and box culvert replacement on Route 30 over Saline Creek, under Gravois Road and at Valley Deli Road, the total length of improvement being 0.476 miles.
Job J6S3229 Route 180 ST LOUIS CITY County. Coldmill and resurface on Dr. Martin Luther King Drive from St. Louis City limits to Route D, the total length of improvement being 3.951 miles.
Job J6S3396 Route I-70 SOR ST CHARLES County. Resurface from Route T to Wentzville Parkway, the total length of improvement being 4.585 miles.
Job J7S3369 Route Various BENTON County. Bridge rehabilitations at various locations in Benton county, the total length of improvement being 0.218 miles.
Job J9P3585 Route 51 PERRY County. Bridge rehabilitation over Mississippi River on Chester Bridge, the total length of improvement being 0.299 miles.
Job J9S3384 Route 38 WRIGHT County. Bridge replacement over Evening Shade Creek., the total length of improvement being 0.077 miles.

The following seven sets of projects were let as one project (for each set):
(1): Job J2P3202 Route 15 AUDRAIN, MONROE County. Seal coat from Route D to 1.1 Miles North of Route 22 near Mexico in Audrain County, the total length of improvement being 18.325 miles.
(2): Job J2P3345 Route 15 MONROE County. Resurface from Route 154 North Junction to Route D near Paris, the total length of improvement being 6.011 miles.
(3): Job J2S3289 Route KK AUDRAIN County. Seal coat from Route B to Route 54 near Laddonia, the total length of improvement being 4.07 miles.
(4): Job J2S3297 Route 151 AUDRAIN, BOONE, MONROE, SHELBY County. Seal coat from 0.3 Mile North of Rout3 36 to Route 22 near Centralia, the total length of improvement being 44.938 miles.

(1): Job J5S3278 Route 19 CRAWFORD, DENT County. Seal coat from Route 68 to Route 49, the total length of improvement being 23.506 miles.
(2): Job J5S3383 Route Various DENT, PHELPS County. Seal coat at various routes in Phelps and Dent counties, the total length of improvement being 79.491 miles.

(1): Job J5S3279 Route T MARIES, OSAGE County. Resurface and ADA improvements from Route 63 to Route 42, the total length of improvement being 17.38 miles.
(2): Job J5S3392 Route P OSAGE County. Resurface from Route 133 to Route 63, the total length of improvement being 13.94 miles.

(1): Job J7P3422 Route Various VARIOUS County. Sign improvements at various interchange locations in the rural Southwest District, the total length of improvement being 15.215 miles.
(2): Job J8O2373C Route Various STONE, TANEY County. Sign improvements on Routes 76, 376, 465, and 65 near Branson, the total length of improvement being 36.855 miles.
(3): Job J8P3069B Route 65, 360, & 60 CHRISTIAN, GREENE County. Sign improvements at various ramp locations from 0.8 mile north of I-44 to Rte. F, on Rte. 60 from Rte. 125 to W County Line Road, and on Rte. 360 from west of Rte. MM to east of Rte. 413, the total length of improvement being 6.475 miles.

(1): Job J7S3230 Route BB BENTON County. Resurface from Route 65 to end of state maintenance, the total length of improvement being 8.768 miles.
(2): Job J7S3232 Route M BENTON County. Resurface from beginning of state maintenance to Route 7, the total length of improvement being 10.215 miles.
(3): Job J7S3408 Route B BENTON County. Resurface from Route 52 in Cole Camp to end of state maintenance, the total length of improvement being 15.886 miles.

(1): Job J9S3397 Route Z STE GENEVIEVE County. Resurface and Bridge Rehabilitation from Route N to Route 61, the total length of improvement being 4.144 miles.
(2): Job J9S3400 Route A CAPE GIRARDEAU County. Resurface from Route U to Route 25 near Dutchtown, the total length of improvement being 10.688 miles.

(1): Job J9S3518 Route H ST FRANCOIS County. Add shoulders and rumble stripes from Old Fredericktown Road to Route AA, the total length of improvement being 3.927 miles.
(2): Job J9S3519 Route B PERRY County. Add shoulders and rumble stripes from 0.25 miles south of National Guard Drive to I-55, the total length of improvement being 6.386 miles.
(3): Job J9S3527 Route K ST FRANCOIS County. Add shoulders and rumble stripes from Point View Drive to Route D, the total length of improvement being 6.76 miles.
(4): Job J9S3554 Route NN ST FRANCOIS County. Add shoulders and rumble stripes from Route N to MO 221, the total length of improvement being 4.319 miles.
(5): Job J9S3555 Route AA ST FRANCOIS County. Add shoulders and rumble stripes from Route H to Pendelton Road, the total length of improvement being 5.195 miles.
(6): Job J9S3594 Route B PERRY County. Add shoulders and rumble stripes From I-55 to the Perry County Line, the total length of improvement being 2.746 miles.

EDIT: Additional Lettings added.
(1): Job J1P3239 Route 6 SULLIVAN County. Pavement, drainage and ADA improvements within the city limits of Green Castle, the total length of improvement being 0.551 miles.
(2): Job J1S3243 Route D, FF SULLIVAN County. Pavement, drainage and ADA Improvements within the city limits of Green Castle, the total length of improvement being 0.687 miles.

(1): Job J7I3201 Route I-44 GREENE County. Coldmill and resurface just east of Route 360 interchange, the total length of improvement being 17.656 miles.
(2): Job J8I3120 Route I-44 GREENE County. Resurface just east of Route 360 interchange to west of Route 266 interchange, the total length of improvement being 5.393 miles.

(1): Job J7I3083 Route I-49 BARTON, JASPER County. Coldmill and resurface from s/o Route 160 to I-44, the total length of improvement being 29.305 miles. 
Title: Re: MODOT Contract Lettings
Post by: mvak36 on September 13, 2019, 11:13:14 AM
When Missouri received INFRA grant for the I-70 Rocheport bridge, it triggered a 301 million dollar grant to fix bridges around the state.

https://www.modot.org/focus-bridges
Quote

Missouri has 10,384 bridges – the sixth most in the nation. More than 900 of those bridges are in poor condition and 1,131 are weight restricted. Four hundred and thirteen bridges fall into both categories.

Gov. Mike Parson recognized the need for additional funding for infrastructure projects in our state and in January 2019 put forth a proposal to repair or replace hundreds of the state’s worst bridges.

As passed by the 2019 General Assembly and signed by the Governor, $50 million was appropriated from State General Revenue to replace or repair 45 bridges in Fiscal Year 2020. In July, MoDOT received an $81.2 million INFRA Grant from the U.S. Department of Transportation that will facilitate the construction of a new I-70 Missouri River Bridge at Rocheport and I-70 climbing lanes at Mineola Hill in Montgomery County - two significant improvements to the I-70 freight corridor. The grant will also trigger a $301 million bonding program, authorized by the legislature in the 2019 session and to be repaid over seven years from State General Revenue, that will repair or replace an additional 215 bridges across the state - freeing up $301 million from the current Statewide Transportation Improvement Program for new transportation improvement projects

Not only will this program enable us to fix hundreds of poor bridges throughout the state, it will also enable us to deliver additional high-priority transportation projects statewide using the funding already dedicated to these bridges in our current construction program and for which our nationally recognized local planning process will be used.

Going forward, I will try to highlight the bridge projects that are a part of the Focus on Bridges program. I will go back to some of the previous listings this year and highlight those projects as well. The list of bridges being replaced are located at: https://www.modot.org/sites/default/files/documents/STIP%20Bridges%202020-2023%20trimmed%20down_update_1.pdf
Title: Re: MODOT Contract Lettings
Post by: mvak36 on October 10, 2019, 03:55:37 PM
November 15, 2019 Letting: Bid Results (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=8441). Bid Award Winners (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=8481).

Projects listed in blue font are part of Missouri Focus on Bridges (https://www.modot.org/focus-bridges) program.

Job J1I0914 Route I-35 DAVIESS, HARRISON County. Resurface from Route 136 to Route C, the total length of improvement being 13.727 miles.
Job J1I3018 Route I-35 CLINTON County. Coldmill and resurface from north of Route 116 to Clay County line near Holt, the total length of improvement being 8.765 miles.
Job J1I3016 Route I-35 CLINTON County. Coldmill and resurface from DeKalb County line to Shoal Creek near Cameron, the total length of improvement being 4.952 miles.

(1): Job J1I3109 Route I-29 ANDREW County. Bridge replacement over Hopkins Creek, 0.2 mile south of Rte. T near Amazonia, the total length of improvement being 1.101 miles.
(2): Job J1I3241 Route I-29 ANDREW County. Bridge rehabilitation on bridge over Route T, near Amazonia, the total length of improvement being 1.101 miles.


Job J1I3183 Route I-29 BUCHANAN County. Resurface 1.5 miles south of Rte. O (just south of pigeon creek) to platte county line, the total length of improvement being 8.535 miles.
Job J1P3072 Route 6 BUCHANAN, DEKALB County. Resurface and shoulder repairs 0.13 Miles East of route AC to the intersection of Route 6 & Route 31, the total length of improvement being 10.596 miles.

(1): Job J2P3246 Route 6 ADAIR, KNOX County. Resurface from 0.2 mile east of Route 63 to Route 15 south junction in Knox County near Edina, the total length of improvement being 19.99 miles.
(2): Job J2P3292 Route 6 ADAIR County. Seal coat from east of Route 149 at the Chariton River to Bus. 63 in Kirksville, the total length of improvement being 5.889 miles.
(3): Job J2S3288 Route 3 ADAIR, MACON County. Seal coat from east Route 11 in Adair County to Route 156 in Macon County near Cardy, the total length of improvement being 8.809 miles.
(4): Job J2S3298 Route H ADAIR County. Seal coat from La Harpe Street to Route 11 in Kirksville, the total length of improvement being 2.305 miles.
(5): Job J2S3299 Route 11 ADAIR, KNOX, LINN, SULLIVAN County. Seal coat from Rte. 15 near Baring to Rte. 129 in Linn County (two disconnected sections), the total length of improvement being 41.136 miles.
(6): Job J2S3343 Route P ADAIR County. Seal coat from Bus. 63 to Route 63 in Kirksville, the total length of improvement being 0.96 miles.

(1): Job J2S3188 Route 16 LEWIS County. Seal coat from Route 6 to Route B in Canton, the total length of improvement being 15.417 miles.
(2): Job J2S3290 Route K LEWIS County. Seal coat from Route E to Route 6 in LaBelle, the total length of improvement being 8.131 miles.
(3): Job J2S3291 Route C LEWIS County. Seal coat from Route 6 in Ewing to Route B in LaGrange, the total length of improvement being 14.281 miles.

(1): Job J3P3085C Route 210 RAY County. Intersection improvements at Route O and Route Z, the total length of improvement being 0.371 miles.
(2): Job J3P3085D Route 10, 210 RAY County. Intersection improvements at Route 10 and Route 210, the total length of improvement being 0.282 miles.
(3): Job J3P3143 Route 210 RAY County. Intersection improvements at Henkel Dr. east of Route T, the total length of improvement being 0.271 miles.

(1): Job J4I3125 Route I-70 JACKSON County. Coldmill, resurface, and ADA improvements from the Kansas State line to Manchester Trafficway, the total length of improvement being 5.615 miles.
(2): Job J4I3127 Route I-29 JACKSON County. Coldmill and resurface from South of Guinotte Avenue to the Downtown Loop, the total length of improvement being 0.672 miles.

Job J4I3217 Route 140th JACKSON County. Bridge replacement over I-49, the total length of improvement being 0.051 miles.

(1): Job J4P3355 Route K PLATTE County. Resurface from Route 152 to Route 45, the total length of improvement being 1.942 miles.
(2): Job J4S3354 Route U PLATTE County. Resurface from Route 371 to I-29, the total length of improvement being 0.849 miles.
(3): Job J4S3358 Route JJ PLATTE County. Resurface from e/o Cherry to Route 45, the total length of improvement being 2.003 miles.
(4): Job J4S3363 Route Y PLATTE County. Resurface from Buchanan County line to Route Z, the total length of improvement being 0.797 miles.
(5): Job J4S3368 Route H PLATTE County. Resurface from Route 371 to Route 45, the total length of improvement being 10.364 miles.
(6): Job J4S3370 Route H PLATTE County. Resurface from Route 371 North to I-29, the total length of improvement being 0.687 miles.
(7): Job J4S3371 Route P PLATTE County. Resurface from Route H to Route 45, the total length of improvement being 7.25 miles.

(1): Job J5P3237 Route 135 COOPER, PETTIS County. Resurface from I-70 to Highway 50, the total length of improvement being 26.138 miles.
(2): Job J5S3389 Route 98 COOPER County. Resurface from Route 87 to State Maint. Ends, the total length of improvement being 8.376 miles.

(1): Job J5P3121 Route 54 COLE County. Coldmill and resurface from Route E near Brazito to near Stadium Blvd. in Jefferson City, the total length of improvement being 11.076 miles.
(2): Job J5P3128 Route 54 COLE County. Coldmill and resurface from Miller County to Route E near Brazito, the total length of improvement being 14.127 miles.
(3): Job J5P3371 Route 54 COLE, MILLER County. Guard cable installation from route aa in miller county to near stadium boulevard in jefferson city, the total length of improvement being 18.708 miles.

Job J5P3291 Route various DALLAS, LACLEDE County. Seal coat and box culvert replacement west of Lebanon, the total length of improvement being 25.089 miles.
Job J5S3230 Route E, M COLE County. Resurface, add shoulder and ADA improvements from Route 54 to Route B and Route M from Route W to Route 50, the total length of improvement being 13.641 miles.
Job J5S3232 Route M, B, 124 BOONE County. Resurface and ADA improvements just west of Route 63 to Route DD and includes Route B and Route 124 in Hallsville, the total length of improvement being 2.284 miles.

(1): Job J5S3266 Route W MORGAN County. Resurface and add shoulders from Versailles city limit to Route Y, the total length of improvement being 13.057 miles.
(2): Job J5S3327 Route J MORGAN County. Resurface from Route 5 to SME, the total length of improvement being 7.965 miles.

Job J5M0289 Route Y HOWARD County. Resurface from Route 124 to State Maint. Ends, the total length of improvement being 7.501 miles.

Job J5L20BEN Route Various DALLAS, LACLEDE County. Seal coat in Bennett Spring State Park west of Lebanon, the total length of improvement being 7.584 miles.
Job J6I3295 Route I-44, BL44 FRANKLIN County. Microsurface from the St. Louis County line to Route 30 and on Loop 44 from Neosho Street to Route 100, the total length of improvement being 23.791 miles.
Job J6S3306 Route P ST CHARLES County. Resurface and guardrail improvements from Rte 61 in Flint Hill to Rte M in O'Fallon, the total length of improvement being 9.911 miles.
Job J6S3431 Route Various ST CHARLES County. Bridge rehabilitation on Route 94 at Sehrt Creek, Route at Little Dardenne Creek, Route K at Schote Creek, Route K at Dardenne Creek and Route 370 at Cole Creek, the total length of improvement being 0.332 miles.
Job J7P3211 Route 65 BENTON County. Coldmill and resurface from south of Route 52 to the Osage River in Warsaw, the total length of improvement being 31.749 miles.

(1): Job J7S3220 Route 123 POLK County. Resurface from Route 32 to Route 215 south intersection, the total length of improvement being 12.158 miles.
(2): Job J7S3222 Route H DADE County. Resurface from Route Y to Route 160, the total length of improvement being 9.175 miles.
(3): Job J7S3267 Route 215 DADE County. Resurface from Rte. Y in Dade County to Rte. 123 in Polk County, the total length of improvement being 9.682 miles.

(1): Job J7S3227 Route B HENRY, JOHNSON County. Resurface from Route 2 to Route 7, the total length of improvement being 11.42 miles.
(2): Job J7S3228 Route K HENRY County. Resurface from Route 7 in Urich to Route 52 in Montrose, the total length of improvement being 17.036 miles.
(3): Job J7S3229 Route AA HENRY County. Resurface from Route 7 to end of state maintenance, the total length of improvement being 1.991 miles.
(4): Job J7S3409 Route H BATES, HENRY County. Resurface from Loop 49 intersection in Butler to Route K intersection near Montrose, the total length of improvement being 18.089 miles.

Job J7S3404 Route Various VARIOUS County. Seal coat in the west portion of the Southwest District, the total length of improvement being 64.183 miles.
Job J8P3067C Route Various GREENE County. Bridge rehabilitation on and over James River Freeway, the total length of improvement being 0.541 miles.

(1): Job J9S3226 Route D NEW MADRID County. Bridge replacement over drainage ditches 40 and 3, the total length of improvement being 0.074 miles.
(2): Job J9S3330 Route D NEW MADRID County. Bridge replacement over drainage ditches 43 and 2, the total length of improvement being 0.129 miles.

(1): Job J9S3327 Route 61 NEW MADRID County. Bridge replacement between Conran and Portageville, the total length of improvement being 0.07 miles.
(2): Job J9S3328 Route ZZ NEW MADRID County. Bridge replacement 5 miles west of Conran, the total length of improvement being 0.013 miles.


(1): Job J9S3346 Route F STODDARD County. Resurface from Route J to Route 60, the total length of improvement being 6.641 miles.
(2): Job J9S3360 Route CC BUTLER County. Resurface from Route 51 to Route 53, the total length of improvement being 10.664 miles.
(3): Job J9S3362 Route JJ BUTLER County. Resurface from end of maintenance to Route 67, the total length of improvement being 3.162 miles.
(4): Job J9S3398 Route WW STODDARD County. Resurface from Route J to Route 60, the total length of improvement being 8.625 miles.
(5): Job J9S3420 Route A RIPLEY County. Resurface from Route 21 to Arkansas State line, the total length of improvement being 7.893 miles.
(6): Job J9S3421 Route E RIPLEY County. Resurface from Route 142 to end of state maintenance, the total length of improvement being 6.639 miles.
(7): Job J9S3437 Route H DUNKLIN, STODDARD County. Resurface from Route 25 to Route J, the total length of improvement being 17.697 miles.
Title: Re: MODOT Contract Lettings
Post by: mvak36 on November 06, 2019, 12:47:04 PM
https://ksisradio.com/modot-to-receive-over-20m-grant-to-replace-bridges/

Quote
MoDOT is set to receive over $20-million in federal grant money to assist in replacing 40 bridges in rural northern Missouri.

Governor Mike Parson's office says MoDOT will be able to replace 40 bridges in the northern part of the state as a result of an announcement by Congressman Sam Graves, in which Missouri has received a $20.7 million federal grant through the U.S. Department of Transportation’s Competitive Highway Bridge Program.

Parson's office says the bridges, all located north of I-70, are in poor condition, weight-restricted, supported by timber pile, and one-lane wide but carry two-way traffic. In addition to removing current detours and preventing future ones, the grant will help increase safety on the state’s rural roads and reduce costs associated with maintaining the bridges.

"Missouri's infrastructure, specifically bridge infrastructure, has been a key focus for our administration since day one. This grant continues the momentum we’ve gained in recent months to invest in infrastructure improvements," Governor Parson said. "Missouri’s farm-to-market roads are critical connections to Missouri’s highways, railways, and waterways, allowing our farmers to compete in the global marketplace. The bridges that will be replaced as a result of this grant would have posed obstacles to that connectivity had they been further weight restricted or closed."

“When this project is complete, there will be no bridges remaining in northern Missouri that meet those criteria,” State Bridge Engineer Dennis Heckman said. He said the bridges, on average, are 77 years old and deteriorating rapidly.

Only 25 states were eligible to apply for the $225 million in the Competitive Highway Bridge Program – those with a population density of 100 or less per square mile, according to a press release from Parson's office. The grant also required that bridges be bundled in a single contract.

MoDOT intends to pursue a design-build contract to deliver this project.

The Competitive Highway Bridge Program grant comes on the heels of an $81.2 million Infrastructure for Rebuilding America (INFRA) grant from the U.S. Department of Transportation to build a new I-70 Missouri River Bridge at Rocheport.

Receipt of the INFRA grant will also trigger $301 million in state bonding, authorized by the Missouri General Assembly during the 2019 legislative session, that will repair or replace another 215 bridges across the state.

“We are poised to deliver these bridge improvement projects as quickly, efficiently, and innovatively as possible,” MoDOT Director Patrick McKenna said. “We are grateful to Congressman Graves, Governor Parson, and Missouri legislators for their support of additional investment in transportation in Missouri.”


I found the grant application for these bridges. The bridges that will be replaced are listed on page 6 of the pdf (https://www.modot.org/sites/default/files/documents/MoDOT%20Project%20Narrative_1.pdf).
Title: Re: MODOT Contract Lettings
Post by: mvak36 on November 07, 2019, 12:46:27 PM
https://www.bizjournals.com/stlouis/news/2019/11/06/modot-to-revamp-i-270-in-north-county-with-278m.html

Quote
The Missouri Department of Transportation has announced a $278 million project to revamp Interstate 270 in north St. Louis County.

The project will improve safety and reliability along I-270 from Interstate 70 on the west to the western part of Riverview Drive, according to a release. The Missouri Highways and Transportation Commission on Wednesday selected Millstone Weber as the design-build contractor for the project, which is expected to begin in spring 2020 and be completed by December 1, 2023.

MoDOT and Millstone Weber will collaborate over the next few months to plan their approach. Expected improvements include: 

    Reconstruct interchanges at U.S. Route 67 (Lindbergh), Hanley/Graham roads, New Florissant Road, Washington Street/Elizabeth Avenue, West Florissant Avenue, New Halls Ferry Road, Old Halls Ferry Road and Route 367
    Additional lane of pavement on I-270 in both directions from U.S. Route 67 (Lindbergh) to Route 367
    Improve accessibility for bicycles and pedestrians with shared use paths from Lindbergh to Breezy Point Lane along Dunn Road, and from Hanley/Graham roads to Old Halls Ferry Road along Pershall Road
    Improve safety with an updated outer road system that includes outer road conversions and removal of crossover slip ramps

“Seeing this project come to fruition is great progress for the community, the region and the entire state of Missouri,” said MoDOT Director Patrick McKenna. “The I-270 North Project is MoDOT’s largest single project in the last decade. It will replace aging infrastructure, enhance safety and resiliency of the system and improve mobility for freight and passengers, all while creating an economic boost for nearby communities. MoDOT’s design-build model to scale the scope of work to match existing resources has worked well for us, and I believe it will with this project, too."

The project is in response to safety concerns along the interstate. MoDOT said both directions of I-270 have higher than average rates of severe crashes in addition to higher-than-average crash rates, with eastbound I-270 showing an average crash rate 30% higher than the statewide average for interstates.

Also, the interstate is heavily used and is one of the heaviest traveled interstates in Missouri. About 140,000 vehicles, of which 18% are heavy trucks, travel it daily, MoDOT said.

The Millstone Weber team includes Parsons Transportation Group, Horner and Shifrin, CBB, Terracon, Pace Construction and Excel Business Concepts.
Title: Re: MODOT Contract Lettings
Post by: Revive 755 on November 07, 2019, 11:00:54 PM
^ MoDOT's website (http://www.i270north.org/news/) has one image for the proposed redesign of the US 67 interchange, and one for the MO 367 interchange.

The best way I can think of at the moment to describe the US 67 interchange is a volleyball without one of the free-flow levels.  Looks like the eastbound to northbound will feature a triple left.

I am not sure whether it's not in the picture or if the rebuild of the MO 367 interchange gets rid of the SB to EB movement entirely.
Title: Re: MODOT Contract Lettings
Post by: mvak36 on November 08, 2019, 09:31:38 AM
Article regarding the future of I-229: https://www.newspressnow.com/news/local_news/modot-eyes-final-two-alternatives-for-i--bridge/article_8669f8be-0166-11ea-9366-cf6187c928e9.html

MODOT Site: https://www.stjoe229.com/
Title: Re: MODOT Contract Lettings
Post by: mvak36 on November 08, 2019, 11:53:27 AM
December 13, 2019 Letting: Bid Results (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=8501). Bid Award Winners (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=8541).

Projects listed in blue font are part of Missouri Focus on Bridges (https://www.modot.org/focus-bridges) program.

(1): Job J1S0447 Route 46 NODAWAY County. Bridge replacement over Florida Creek, 0.7 mile west of Rte. AB near Maryville, the total length of improvement being 0.076 miles.
(2): Job J1S0616 Route 46 NODAWAY County. Bridge replacement over White Cloud Creek, 2.3 miles east of Rte. AB near Maryville, the total length of improvement being 0.123 miles.
(3): Job J1S3138 Route 46 NODAWAY County. Bridge replacement over Stream, 0.8 mile west of Rte. AB near Maryville, the total length of improvement being 0.088 miles.
(4): Job J1S3139 Route 46 NODAWAY County. Bridge replacement over Big Slough Creek, 3.2 miles east of Rte. AB near Maryville, the total length of improvement being 0.135 miles.


(1): Job J1S3171 Route DD ANDREW County. Resurface from Route T in Savannah to Route 59 in Country Club Village, the total length of improvement being 7.605 miles.
(2): Job J1S3196 Route E BUCHANAN County. Resurface Route 169 to Route 116 near Gower, the total length of improvement being 8.561 miles.
(3): Job J1S3197 Route H BUCHANAN County. Resurface from Route 371 near Faucett to Route 169 in Gower, the total length of improvement being 13.789 miles.

(1): Job J1S3249 Route BUS 169 BUCHANAN County. Resurface from I29 to Mitchell Avenue in Saint Joseph and includes Rte. 6 from the Belt Highway to I29, the total length of improvement being 4.956 miles.
(2): Job J1S3257 Route BUS 169 BUCHANAN County. Resurface from Mitchell Avenue to Rte. FF in St. Joseph, the total length of improvement being 3.146 miles.

Job J1S3350 Route N SULLIVAN County. Culvert replacement 0.02 mile west of Route B, near Green City, the total length of improvement being 0.019 miles.

(1): Job J2P3130 Route 61 MARION County. Resurface from 0.6 Miles South of Route F to 0.4 Miles North of Route 168 near Hannibal, the total length of improvement being 11.451 miles.
(2): Job J2P3168 Route 24 MARION County. Resurface from Route 61 to 0.5 Mile North of Route 36 near Hannibal, the total length of improvement being 4.419 miles.
(3): Job J2P3173 Route 24, 61 MARION County. Intersection improvements at Route 61, 24, and F intersection near Palmyra, the total length of improvement being 0.405 miles.

Job J2P3153 Route 19 AUDRAIN County. Resurface from 0.2 mile north of Route J to 0.1 mile south of Route BB near Laddonia, the total length of improvement being 8.099 miles.

(1): Job J2P3175 Route 36 SHELBY County. Resurface on eastbound lanes from 1.7 miles west of Route 151 to 2.2 miles east of Route PP near Lakenan, the total length of improvement being 19.741 miles.
(2): Job J2P3176 Route 36 MACON, SHELBY County. Resurface on westbound lanes from 1.7 miles west of Route Z to North Fork Salt River near Hunnewell and from 2.2 miles west of Route 151 to 0.8 mile east of Route 63 near Macon, the total length of improvement being 8.47 miles.
(3): Job J2S3155 Route O MACON County. Coldmill and resurface from 0.3 mile north of Route 36 interchange to south ramps at interchange at Bevier, the total length of improvement being 0.329 miles.

(1): Job J2P3203 Route 136 PUTNAM, SCHUYLER County. Seal Coat from Rte. 63 to Rte. N near Livonia, the total length of improvement being 7.848 miles.
(2): Job J2P3213 Route 136 CLARK, SCOTLAND County. Seal Coat from Schuyler County to near Medill, the total length of improvement being 30.896 miles.
(3): Job J2P3214 Route 15 SCOTLAND County. Resurface, shoulders, and ADA improvements from the Iowa State line to the Rte. 136 east junction in Memphis, the total length of improvement being 10.771 miles.

Job J2P3280 Route 36 MACON County. Diamond grinding from the Linn County line to 0.5 mile west of Route C near Bevier, the total length of improvement being 28.753 miles.

(1): Job J2S3184 Route 154 MONROE County. Resurface from Route 24 at Paris to 0.4 miles west of Route 107, the total length of improvement being 12.803 miles.
(2): Job J2S3210 Route 154 MONROE, RALLS County. Resurface from 0.4 mile West of Route 107 to Route 19 near Perry, the total length of improvement being 8.911 miles.

(1): Job J2S3293 Route O MARION, RALLS County. Resurface from the beginning of state maintenance in Hannibal to Route 61 near New London, the total length of improvement being 6.627 miles.
(2): Job J2S3294 Route 168 MARION County. Resurface from 0.2 mile east of Route JJ to Route 61 at Hannibal, the total length of improvement being 6.631 miles.

Job J3I3046 Route I-70 SALINE County. Resurface from Route Y to the Blackwater River Bridge, the total length of improvement being 14.241 miles.

(1): Job J3P3092 Route 41 SALINE County. Bridge replacement at Muddy Creek, 0.3 miles south of 330th Road, the total length of improvement being 0.095 miles.
(2): Job J3S3091 Route 122 SALINE County. Bridge replacement at Muddy Creek, 0.5 miles east of 305th Road, the total length of improvement being 0.161 miles.


Job J3P3111 Route 50 JOHNSON County. Resurface from Jackson County line to CR 1501, the total length of improvement being 5.311 miles.
Job J3S3136 Route C RAY County. Resurface from Route U to Route 10, the total length of improvement being 5.1 miles.
Job J4P3215 Route 169 CLAY County. Resurface from Commercial Ave. to Barry Road, the total length of improvement being 8.081 miles.
Job J4P3276 Route 92 PLATTE County. Coldmill and resurface from MO River to Route 273, the total length of improvement being 7.709 miles.
Job J4S3202 Route 9 PLATTE County. Intersection improvements at Mattox Road, the total length of improvement being 0.351 miles.
Job J4S3223 Route 9 PLATTE County. Resurface from south of NW Lakeview Drive to Route FF, the total length of improvement being 0.86 miles.

(1): Job J4S3254 Route 9 PLATTE County. Resurface from Barry Road to Route 45, the total length of improvement being 3.06 miles.
(2): Job J4S3336 Route Prairie View PLATTE County. Resurface from Route 9 to 56th Street, the total length of improvement being 2.567 miles.

Job J5I3211 Route I-44 LACLEDE County. Resurface from Webster County Line to Pulaski County Line, the total length of improvement being 52.237 miles.
Job J5M0287 Route H PULASKI County. Bridge rehabilitation over I-44 in Waynesville, the total length of improvement being 0.02 miles.
Job J5P3293 Route 19 GASCONADE County. Seal coat from 0.12 miles south of Route H to Drake, the total length of improvement being 17.86 miles.
Job J5S3261 Route Various CALLAWAY, COLE County. Bridge rehabilitation over Route 54 includes Route 94 over Little Tavern Creek in Callaway County and West Main Street over Route 54/Route 63 in Cole County, the total length of improvement being 0.161 miles.
Job J5S3280 Route U, T MILLER, PULASKI County. Resurface and add shoulders from Route 42 to Crocker, the total length of improvement being 25.546 miles.
Job J6I3034 Route I-44 ST LOUIS CITY County. Bridge replacement and coldmill from west of Kingshighway Boulevard to I-55, the total length of improvement being 2.932 miles.
Job J6I3225 Route I-70 ST CHARLES, ST LOUIS County. Bridge rehabilitation over Missouri River, the total length of improvement being 1.242 miles.
Job J6I3263 Route I-270 ST LOUIS County. Resurface from I-70 to Page Avenue, the total length of improvement being 3.306 miles.
Job J6S2211 Route AB ST LOUIS County. Bridge replacement at Hibler Creek, the total length of improvement being 0.066 miles.
Job J6S3089 Route V JEFFERSON County. Slide repair at Hardin Road, the total length of improvement being 0.427 miles.
Job J6S3328 Route 94 ST CHARLES County. Resurface and add shoulders from Route 370 to Burlington Northern Santa Fe Railroad Crossing in Orchard Farm., the total length of improvement being 5.59 miles.

(1): Job J7P3265 Route 60 WEBSTER County. Resurface from 0.6 miles west of Rt A to west of Rt O in Wright County, the total length of improvement being 24.908 miles.
(2): Job J7P3272 Route 60 WEBSTER County. Resurface from Rte. VV in Rogersville to 0.6 miles west of Rte. A, the total length of improvement being 22.374 miles.

Job J7P3423 Route 59 MCDONALD County. Guardrail and signal improvements various locations from 1.7 miles south of Route 76 in Anderson to 2.1 miles south of Route 90 in Noel, the total length of improvement being 3.585 miles.

(1): Job J9I3125 Route I-55 CAPE GIRARDEAU County. Bridge replacements over Route 61, the total length of improvement being 0.808 miles.
(2): Job J9P3460 Route 61 CAPE GIRARDEAU County. Interchange improvements from Old Orchard Road to 0.2 miles south of Veterans Memorial Drive, the total length of improvement being 1.53 miles.

Job J9I3310 Route I-55 STE GENEVIEVE County. Resurface from Jefferson County Line to 0.4 miles south of Rte M overpass in Ozora, the total length of improvement being 44.66 miles.
Job J9I3658B Route 67 MADISON, WAYNE County. Pavement improvements from Co. Rd. 211 intersection to .75 miles north of Route JJ, the total length of improvement being 0.092 miles.

(1): Job J9S3224 Route Z STODDARD County. 4 Bridge replacement from 4.4 miles west of Route 153 intersection to 3.0 miles east of Route 153 intersections, the total length of improvement being 0.4 miles.
(2): Job J9S3224B Route Z STODDARD County. 2 Bridge replacement from 2 miles west of Route 153 intersection to 1 miles west of Route 153 intersection, the total length of improvement being 0.177 miles.

EDIT: Additional projects added to the letting
(1): Job J1P1043B Route 116 CLINTON County. Scrub seal from 169 to Horse Fork Creek, in Plattsburg, and from 0.8 miles east of Route 33, near Lathrop, to I-35, the total length of improvement being 0 miles.
(2): Job J1P3193 Route 136 ATCHISON County. Scrub seal from I-29 in Rockport to Route O, near Tarkio, the total length of improvement being 22.89 miles.
(3): Job J1P3274 Route 136 ATCHISON, NODAWAY County. Scrub seal from Little Tarkio Crk, east of Tarkio, to Rte 71, the total length of improvement being 11.901 miles.
(4): Job J1S3195B Route 169 BUCHANAN County. Scrub seal from Rte FF to Clay County, the total length of improvement being 48.51 miles.
(5): Job J1S3195C Route 116 CALDWELL County. Scrub seal from Rte. D to Rte. A in Braymer, except within the city limits of Polo, the total length of improvement being 36.82 miles.
(6): Job J1S3248 Route T ANDREW County. Scrub seal from Savanah to end of route, the total length of improvement being 20.18 miles.
(7): Job J1S3285 Route Various BUCHANAN, CLINTON, DAVIESS, DEKALB County. Scrub seal in multiple counties in the Northwest District, the total length of improvement being 158.83 miles.
(8): Job J1S3300 Route Various CHARITON, DAVIESS, GRUNDY, HARRISON, LINN, LIVINGSTON County. Scrub seal in the Northwest District, the total length of improvement being 284.75 miles.

(1): Job J1L19CRO Route 128 GRUNDY County. Scrub seal located within Crowder State Park 2.3 miles west of Trenton and 1.3 miles east of Edinburg, the total length of improvement being 4.132 miles.
Title: Re: MODOT Contract Lettings
Post by: kphoger on November 08, 2019, 02:12:39 PM
Article regarding the future of I-229: https://www.newspressnow.com/news/local_news/modot-eyes-final-two-alternatives-for-i--bridge/article_8669f8be-0166-11ea-9366-cf6187c928e9.html

MODOT Site: https://www.stjoe229.com/

I just drove that for the first time a couple of weeks ago.  I'm glad I got the chance, although I wish it had been southbound instead of northbound.
Title: Re: MODOT Contract Lettings
Post by: Revive 755 on November 09, 2019, 11:55:53 AM
(1): Job J2P3130 Route 61 MARION County. Resurface from 0.6 Miles South of Route F to 0.4 Miles North of Route 168 near Hannibal, the total length of improvement being 11.451 miles.
(2): Job J2P3168 Route 24 MARION County. Resurface from Route 61 to 0.5 Mile North of Route 36 near Hannibal, the total length of improvement being 4.419 miles.
(3): Job J2P3173 Route 24, 61 MARION County. Intersection improvements at Route 61, 24, and F intersection near Palmyra, the total length of improvement being 0.405 miles.

Interesting how the control cities for southbound US 61/westbound US 24 will be changing from Hannibal and Monroe City to St. Louis and Kansas City (easternmost mention of Kansas City on US 24?).
Title: Re: MODOT Contract Lettings
Post by: mvak36 on November 09, 2019, 02:35:17 PM
(1): Job J2P3130 Route 61 MARION County. Resurface from 0.6 Miles South of Route F to 0.4 Miles North of Route 168 near Hannibal, the total length of improvement being 11.451 miles.
(2): Job J2P3168 Route 24 MARION County. Resurface from Route 61 to 0.5 Mile North of Route 36 near Hannibal, the total length of improvement being 4.419 miles.
(3): Job J2P3173 Route 24, 61 MARION County. Intersection improvements at Route 61, 24, and F intersection near Palmyra, the total length of improvement being 0.405 miles.

Interesting how the control cities for southbound US 61/westbound US 24 will be changing from Hannibal and Monroe City to St. Louis and Kansas City (easternmost mention of Kansas City on US 24?).

Speaking of US 24 and Kansas City, the project for resigning the US 24 for the route changes is listed on the Tentative Lettings (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=general_info&key=2335) for June 2020 (Project 4I3233).
Title: Re: MODOT Contract Lettings
Post by: mvak36 on December 06, 2019, 09:08:45 AM
January 17, 2020 Letting: Bid Results (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=8561). Bid Award Winners (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=8582).

Projects listed in blue font are part of Missouri Focus on Bridges (https://www.modot.org/focus-bridges) program.

Job J1S3140 Route PP SULLIVAN County. Bridge replacement 0.2 miles east outer Route 139 near Osgood over east Medicine Creek Drainage Ditch, the total length of improvement being 0.257 miles.

(1): Job J2S3046 Route H RALLS County. Bridge rehabilitation over Salt River 1.2 miles north of Route A near Center, the total length of improvement being 0.141 miles.
(2): Job J2S3047 Route A RALLS County. Bridge rehabilitation over Salt River 1.9 miles west of Route H near Center., the total length of improvement being 0.184 miles.

Job J3S3090 Route O PETTIS County. Bridge replacement 2.7 miles north of Lee Road over Muddy Creek, the total length of improvement being 0.13 miles.
Job J3S3184 Route 127 SALINE County. Resurface from Route 20 to I-70, the total length of improvement being 8.753 miles.
Job J4P3214C Route Various JACKSON County. Signal improvements in various intersection on US24, US40 and MO78, the total length of improvement being 31.956 miles.

(1): Job J4P3249 Route 291 CLAY County. Coldmill and resurface from Leonard St to Route 78, the total length of improvement being 10.055 miles.
(2): Job J4P3260 Route 291 CLAY County. Coldmill and resurface from I-435 to north of Kansas Street, the total length of improvement being 5.724 miles.

(1): Job J4S3257 Route 9 PLATTE County. Coldmill and resurface from I-635 to Briarcliff Pkwy, the total length of improvement being 1.02 miles.
(2): Job J4S3259 Route 9 CLAY County. Coldmill and resurface from I-635 to Briarcliff Pkwy, the total length of improvement being 1.59 miles.

Job J4S3359 Route W CLAY County. Resurface from Route 169 to Route C, the total length of improvement being 7.298 miles.

(1): Job J5S3242 Route A GASCONADE County. Bridge replacement over Third Creek, 4.2 miles south of Mount Sterling, the total length of improvement being 0.113 miles.
(2): Job J5S3250 Route D OSAGE County. Bridge replacement over Mistaken Creek, 0.2 miles west of Cooper Hill, the total length of improvement being 0.055 miles.


Job J5S3240 Route AA WASHINGTON County. Bridge replacement over FOURCHE-A-RENAULT Creek, the total length of improvement being 0.0752 miles.

(1): Job J6I3257 Route I-70 ST LOUIS CITY County. Coldmill and resurface from Kingshighway Blvd to Branch Street, the total length of improvement being 3.626 miles.
(2): Job J6I3338 Route I-70 ST LOUIS, ST LOUIS CITY County. 14 Bridge rehabilitation from Cypress in St. Louis County to Branch in St. Louis City, the total length of improvement being 12.9 miles.
(3): Job J6I3499 Route I-70 ST LOUIS County. Pavement improvements along I-70 from east of Springdale to Bermuda, the total length of improvement being 1.317 miles.

Job J6I3423 Route I-64 ST CHARLES County. Pavement repairs from I-70 to Lake Saint Louis Blvd., the total length of improvement being 2.2 miles.
Job J6S3168 Route AD FRANKLIN County. Bridge replacement over Happy Sac Creek, the total length of improvement being 0.322 miles.
Job J6S3232 Route V JEFFERSON County. Culvert replacement at Joachim Creek, the total length of improvement being 0.08 miles.
Job J6S3319 Route A ST CHARLES County. Resurface and bridge rehabilitation from Route 61 to I-70, the total length of improvement being 3.125 miles.
Job J6S3401 Route Various JEFFERSON County. Pavement improvement, signal installation and ADA improvements on Route 109 to Routes FF and W, near Eureka, the total length of improvement being 0.581 miles.
Job J6M0278 Route Various FRANKLIN County. Resurface on various routes in Franklin County, the total length of improvement being 17.669 miles.

(1): Job J7I3050 Route I-49 BATES County. Bridge deck replacement over the Bates County Drainage Ditch, the total length of improvement being 1.957 miles.
(2): Job J7I3366 Route I-49 BATES County. 3 Bridge rehabilitations over the Marais Des Cygnes River and the Bates County Drainage Ditch, the total length of improvement being 0.716 miles.

(1): Job J7I3405 Route Various VARIOUS County. Job Order Contract for bridge repair in the southern counties of the Southwest District, the total length of improvement being 0 miles.
(2): Job J8I3178 Route Various VARIOUS County. Job Order Contract for bridge repair inside the Ozarks Transportation Organization Boundary are of the Southwest District, the total length of improvement being 0 miles.

Job J7I3406 Route Various VARIOUS County. Job Order Contract for bridge repair in the northern counties of the Southwest District, the total length of improvement being 0 miles.
Job J7I3411 Route I49 VERNON County. Bridge rehabilitation over Marmaton River north of Nevada, the total length of improvement being 0.322 miles.

(1): Job J7S3202 Route C ST CLAIR County. Bridge rehabilitation over Truman Lake, east of Lowry City, 5.5 miles east of Route 13, the total length of improvement being 0.568 miles.
(2): Job J7S3203 Route ZZ ST CLAIR County. Bridge rehabilitation over Truman Lake, the total length of improvement being 0.478 miles.


(1): Job J7S3402 Route Various VARIOUS County. Seal coat in the east portion of the southwest district, the total length of improvement being 97.585 miles.
(2): Job J8S3176 Route Various VARIOUS County. Seal coat in the OTO area of the southwest district, the total length of improvement being 23.4 miles.

Job J8S3161 Route 125 / OO GREENE County. Drainage improvements from e/o Rte. OO to e/o Old Orchard Dr. in Strafford, the total length of improvement being 0.341 miles.

(1): Job J9P3370 Route 63 TEXAS County. Resurface from Cleveland Road to Route U, the total length of improvement being 12.6 miles.
(2): Job J9P3426 Route 60 CARTER, SHANNON County. Resurface from east of Rte. J to County Road 455, the total length of improvement being 8.955 miles.
(3): Job J9S3415 Route F TEXAS County. Pavement Improvements from Route 63 to the end of state maintenance, the total length of improvement being 0.3 miles.
(4): Job J9S3440 Route BUS 63 HOWELL County. Resurface from 0.6 mile south of Rte. 63 to 0.8 mile north of Rte. 60 in Willow Springs, the total length of improvement being 3.04 miles.
(5): Job J9S3445 Route BUS 60 TEXAS County. Resurface from Rte. 63 to Rte. 60, the total length of improvement being 2.986 miles.
(6): Job J9S3531 Route BUS 60 HOWELL County. Resurface from Bus. 63 to Rte. 60 in Willow Springs, the total length of improvement being 1.535 miles.

Job J9P3576 Route 60 VARIOUS County. Slope repair in various locations, the total length of improvement being 177.21 miles.

Job J9P3627 Route Various VARIOUS County. Job Order Contract for erosion control repairs in various locations in the Southeast District, the total length of improvement being 0 miles.

(1): Job J9S3220 Route CC PEMISCOT County. Bridge Replacement 1.3 miles north of Route A, the total length of improvement being 0.111 miles.
(2): Job J9S3222 Route A PEMISCOT County. Bridge replacement 1.5 miles north of Bragg City, the total length of improvement being 0.119 miles.
(3): Job J9S3227 Route T PEMISCOT County. Bridge replacement 4 miles southeast of Hayward, the total length of improvement being 0.111 miles.
(4): Job J9S3331 Route A PEMISCOT County. Bridge replacement 0.5 miles north of Route K intersection, the total length of improvement being 0.057 miles.
(5): Job J9S3332 Route 153 PEMISCOT County. Bridge replacement 0.25 east of Route EE intersection, the total length of improvement being 0.149 miles.

(6): Job J9S3333 Route C PEMISCOT County. Bridge replacement 5 miles west of Steele, the total length of improvement being 0.036 miles.

(1): Job J9S3263 Route 91 STODDARD County. Bridge replacement 0.48 miles east of Rte 91/P intersection, the total length of improvement being 0.03 miles.
(2): Job J9S3264 Route 91 STODDARD County. Bridge replacement 3 Miles East of Bell City, MO, the total length of improvement being 0.05 miles.
(3): Job J9S3278 Route 91 SCOTT County. Bridge replacement from 0.04 miles west of Rte CC/91 intersection, the total length of improvement being 0.069 miles.
(4): Job J9S3279 Route 91 SCOTT County. Bridge replacement fom 1.8 miles west of Rte CC/91 intersection, the total length of improvement being 0.033 miles.

(1): Job J9I3553 Route 60 NEW MADRID, SCOTT, STODDARD County. Resurface from I-57 to Spring Creek, the total length of improvement being 28.962 miles.
(2): Job J9S3571 Route 60 MISSISSIPPI County. Resurface from I-57 to Bridge K0950, the total length of improvement being 10.825 miles.

Job J9M0276 Route 60, 67 BUTLER County. Conduit installation from Route W on BU 67 to 2nd St. on BU 60, the total length of improvement being 3.442 miles.

EDIT: Additional projects added to the letting
Job J4S3218 Route Blue Ridge Boulevard JACKSON County. Bridge replacement over Route 78, the total length of improvement being 0.175 miles.
Title: Re: MODOT Contract Lettings
Post by: mvak36 on January 24, 2020, 11:04:23 AM
February 21, 2020 Letting: Bid Results (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=8601). Bid Award Winners (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=8641).

Projects listed in blue font are part of Missouri Focus on Bridges (https://www.modot.org/focus-bridges) program.

(1): Job J1S0588 Route D DEKALB County. Bridge replacement over Ervins Branch, 0.4 mile north of Rte. W near Maysville, the total length of improvement being 0.15 miles.
(2): Job J1S3133 Route 48 ANDREW County. Bridge replacement over Agee Creek 2 miles east of Route D near Whitesville, the total length of improvement being 0.076 miles.


(1): Job J1P3144 Route 6 GRUNDY County. Resurface and ADA improvements from 4th Street to Muddy Creek bridge in Trenton, the total length of improvement being 1.728 miles.
(2): Job J1P3199 Route 69, 6 DAVIESS, GRUNDY County. Resurface and shoulder repairs from I-35 to 4th Street in Trenton; from I-35 to west end Bridge A6784, the total length of improvement being 34.768 miles.

Job J1P3250 Route 6 DAVIESS, GRUNDY County. Scrub seal from the East end of Bridge A6784 to 4th Street in Trenton, the total length of improvement being 17.386 miles.

(1): Job J1P3239 Route 6 SULLIVAN County. Resurface, drainage and ADA improvements within the city limits of Green Castle, the total length of improvement being 0.551 miles.
(2): Job J1S3243 Route D, FF SULLIVAN County. Resurface, drainage and ADA Improvements within the city limits of Green Castle, the total length of improvement being 0.466 miles.

Job J1S3359 Route 13 CALDWELL County. Bridge rehabilitation over Route 36 in Hamilton, the total length of improvement being 0.021 miles.

(1): Job J2S3120 Route U PIKE County. Bridge replacement 1 mile west of Route 61 near Bowling Green, the total length of improvement being 0.065 miles.
(2): Job J2S3177 Route U PIKE County. Bridge replacement 0.2 mile west of Route 61 near Bowling Green, the total length of improvement being 0.092 miles.
(3): Job J3S2219 Route C PIKE County. Bridge replacement over Crooked Branch 2.4 miles west of Rte. E near Frankford, the total length of improvement being 0.087 miles.


(1): Job J2S3232 Route DD MACON County. Bridge painting over Middle Fork Salt River 3.3 miles east of Route 63 near Kellogg., the total length of improvement being 0.024 miles.
(2): Job J2S3233 Route 151 SHELBY County. Bridge painting over Salt River 0.4 mile west of Route K near Hagers Grove, the total length of improvement being 0.034 miles.
(3): Job J2S3234 Route M MACON County. Bridge painting over Middle Fork Salt River 1.8 miles east of Route 63 near Atlanta., the total length of improvement being 0.027 miles.
(4): Job J2S3235 Route J MACON County. Bridge painting over Middle Fork Salt River 0.6 mile west of Route O near Plainview, the total length of improvement being 0.016 miles.

(1): Job J3P3125 Route 41 SALINE County. Bridge replacement over Flat Creek one mile west of Route D, the total length of improvement being 0.303 miles.
(2): Job J3P3126 Route 41 SALINE County. Bridge replacement over Camp Creek 1.5 miles east of Rte E, the total length of improvement being 0.12 miles.


(1): Job J3S3115 Route D PETTIS County. Bridge replacement 0.9 miles west of McCubbin Road and 0.8 miles east of McAninch Road over Heaths Creek, the total length of improvement being 0.19 miles.
(2): Job J3S3116 Route D PETTIS County. Bridge replacement South Fork of the Blackwater River, 0.7 miles east of MO 127 and 2.4 miles west of Gibson Road, the total length of improvement being 0.241 miles.


Job J4P3212D Route 2 CASS County. Intersection improvements at Blinker Light Road near Harrisonville, the total length of improvement being 0.1985 miles.
Job J4S3356 Route RA JACKSON County. Resurface from S Outer Road to State Maintenance Ends, the total length of improvement being 1.321 miles.

(1): Job J4S3362 Route Z CASS County. Resurface from MO 2 to MO 7 in Garden City, the total length of improvement being 4.085 miles.
(2): Job J4S3364 Route P CASS County. Resurface from MO 7 to Staley Mound Road, the total length of improvement being 4.381 miles.

Job J5I3302 Route I-44 VARIOUS County. Safety improvements at various ramp locations, the total length of improvement being 0 miles.

(1): Job J5S3251 Route K COOPER County. Bridge deck replacement over Black water River north of Black water, the total length of improvement being 0.161 miles.
(2): Job J5S3260 Route DD COOPER County. Bridge deck replacement 0.7 mile west of Route K, near Blackwater, the total length of improvement being 0.15 miles.

Job J6I3341 Route I-55 JEFFERSON, ST LOUIS County. Crack sealing and guardrail from Route 61/67 to Route 141, the total length of improvement being 5.497 miles.
Job J6I3506 Route I-44 FRANKLIN County. Slide repair west of Route OO, the total length of improvement being 0.14 miles.
Job J6M0279 Route 141 ST LOUIS County. Sound wall repair on Route 141 at Helfrich and Ladue Farms, the total length of improvement being 0.008 miles.

(1): Job J6P3422 Route 364 ST LOUIS County. Coldmill and microsurface from Bennington Place to Schuetz Rd, the total length of improvement being 1.712 miles.
(2): Job J6S3267 Route 180 ST LOUIS County. Microsurface and signal improvements from Pennridge/Boenker to I-270, the total length of improvement being 0.14 miles.
(3): Job J6S3406 Route D ST LOUIS County. Coldmill and microsurface from Schuetz Rd to Lindbergh, the total length of improvement being 1.517 miles.

(1): Job J6Q3467 Route Various ST LOUIS CITY County. ITS improvements at various routes across the St. Louis District, the total length of improvement being 0 miles.
(2): Job J6Q3472 Route Various ST LOUIS County. ITS improvments at various locations across the St. Louis District, the total length of improvement being 0 miles.

Job J6S3387 Route TT FRANKLIN County. Resurface and add shoulders from Commercial Ave. to Mill Hill Road, the total length of improvement being 4.78 miles.
Job J0I3006N Route I-44 VARIOUS County. Job Order Contracting for asphalt pavement repair from the Oklahoma State line to Rte. 360 in Greene County, the total length of improvement being 0 miles.
Job J0I3006O Route I-44 GREENE County. Job Order Contracting for asphalt pavement repair in the Ozarks Transportation Organization area, the total length of improvement being 0 miles.
Job J0I3006P Route I-44 WEBSTER County. Job Order Contracting for asphalt pavement repair in Webster County, the total length of improvement being 0 miles.
Job J0I3006W Route I-49 VARIOUS County. Job Order Contracting for asphalt pavement repair from the Cass County line to Rte. 54 in Vernon County, the total length of improvement being 0 miles.
Job J0I3006X Route I-49 VARIOUS County. Job Order Contracting for asphalt pavement repair from Route 54 in Vernon County to I-44 in Jasper County, the total length of improvement being 0 miles.
Job J0I3006Y Route I-49 MCDONALD County. Job Order Contracting for asphalt pavement repair from Rte. 59 to 0.7 mile south of Rte. H, the total length of improvement being 0 miles.
Job J7P3190B Route CC NEWTON County. Culvert replacement approximately 0.5 miles south of Racine, the total length of improvement being 0.09 miles.
Job J8M0261 Route 65 GREENE County. DMS board upgrade on northbound US 65 0.48 miles north of Battlefield Road, the total length of improvement being 0.074 miles.

(1): Job J9L20BAT Route Pilot Knob IRON County. Seal coat in Battle of Pilot Knob State Park, the total length of improvement being 0 miles.
(2): Job J9L20ELE Route Elephant Rocks IRON County. Seal coat in Elephant Rocks State Park, the total length of improvement being 0 miles.
(3): Job J9L20JOH Route Johnson's Shut-Ins IRON County. Seal coat in Johnson's Shut-Ins State Park, the total length of improvement being 0 miles.
(4): Job J9L20LAK Route Lake Wappapello WAYNE County. Seal coat at Lake Wappapello, the total length of improvement being 0 miles.
(5): Job J9L20SAM Route Sam A Baker WAYNE County. Seal coat in Sam A. Baker State Park, the total length of improvement being 0 miles.

(1): Job J9P3427 Route 160 OREGON County. Resurface from Route 99 east to Route FF, the total length of improvement being 19.726 miles.
(2): Job J9S3377 Route 76 DOUGLAS, HOWELL County. Resurface from Route 137 east to Route 181, the total length of improvement being 10.606 miles.
(3): Job J9S3412 Route 142 HOWELL County. Resurface from Route 101 east to Route E, the total length of improvement being 9.721 miles.
(4): Job J9S3416 Route MM TEXAS County. Resurface from Route 38 to south end of Bridge No. A2967, the total length of improvement being 12.372 miles.
(5): Job J9S3417 Route AM WRIGHT County. Resurface from Route 95 to end of state maintenance, the total length of improvement being 4.032 miles.
(6): Job J9S3419 Route Z HOWELL County. Resurface from Route 76 to Route P, the total length of improvement being 8.102 miles.
(7): Job J9S3422 Route M OREGON County. Resurface from Route 63 to Route 160, the total length of improvement being 9.632 miles.
(8): Job J9S3423 Route J OZARK County. Resurface from Route 160 to Arkansas state line, the total length of improvement being 6.705 miles.
(9): Job J9S3424 Route JJ DOUGLAS County. Resurface from Route 5 to Route 95, the total length of improvement being 11.889 miles.

Job J9S3209 Route 142 RIPLEY County. Bridge replacement over Little Black River, north of Naylor, the total length of improvement being 0.134 miles.

(1): Job J9S3257 Route 153 VARIOUS County. Resurface from Route 60 in Stoddard county south to Route 25 in Dunklin county, the total length of improvement being 46.804 miles.
(2): Job J9S3291 Route E DUNKLIN County. Resurface and add shoulders from Route 84 to Route 25, the total length of improvement being 2.697 miles.
(3): Job J9S3402 Route C MISSISSIPPI County. Resurface from Route B to Route 105, the total length of improvement being 5.471 miles.

Job J9S3385 Route J OZARK County. Bridge replacement over Lick Creek, the total length of improvement being 0.18 miles.

(1): Job J9S3393 Route AA CAPE GIRARDEAU County. Bridge replacement over Caney Fork Creek, 0.31 miles west of CRD 475, the total length of improvement being 0.073 miles.
(2): Job J9S3395 Route ZZ SCOTT County. Bridge replacement 0.2 miles east of Route BB intersection near Sikeston, the total length of improvement being 0.111 miles.
(3): Job J9S3439 Route P BOLLINGER County. Bridge replacement 2.2 miles west of Route 51 near Arab, the total length of improvement being 0.236 miles.


EDIT: Additional lettings added
(1): Job J1P3382 Route 24 CARROLL County. Flood repair from south end of bridge over Moss Creek to the Missouri River Bridge near Waverly, the total length of improvement being 4.15 miles.
(2): Job J2P2211 Route 24 CARROLL, CHARITON County. Resurface and shoulder improvements 1.9 miles east of Rte. 41, near Dewitt, to Rte 5 in Keytesville, the total length of improvement being 16.016 miles.


(1): Job J7P3299 Route 7 BENTON, CEDAR, DADE, HENRY, ST CLAIR County. Bridge rehabilitation at various locations in various counties in the Southwest District, the total length of improvement being 0 miles.
(2): Job J7P3360 Route 7 BENTON County. Bridge rehabilitation over Truman Lake, the total length of improvement being 0.4 miles.
(3): Job J7S3359 Route 64 HICKORY County. Bridge rehabilitation over Lake Pomme de Terre, the total length of improvement being 0.327 miles.
Title: Re: MODOT Contract Lettings
Post by: mvak36 on February 10, 2020, 10:20:45 PM
They have opened (a few days early :)) the letting for the MO portion of the Bella Vista Bypass on their lettings page (https://www.modot.org/modot-online-plans-room). I will update this post later in the week once the remaining March 20 projects are added to that page.

March 20, 2020 Letting: Bid Results (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=8661). Bid Award Winners (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=8701)

Projects listed in blue font are part of Missouri Focus on Bridges (https://www.modot.org/focus-bridges) program.

Job J7P0601 Route I-49 MCDONALD County. Construct new interstate from Pineville to the Arkansas state line, the total length of improvement being 5.006 miles.

EDIT: Adding remaining lettings
Job J1S3347 Route T HOLT County. Grading, drainage and paving from 0.6 miles to 0.63 miles south of Rte. 111 near Forest City, the total length of improvement being 0.2 miles.
Job J2P2211 Route 24 CARROLL, CHARITON County. Resurface and shoulder improvements 1.9 miles east of Rte. 41, near Dewitt, to Rte 5 in Keytesville, the total length of improvement being 16.016 miles.

(1): Job J2P3171 Route 61 RALLS County. Intersection improvements at Rte. A and 5th St. intersections in New London, the total length of improvement being 1.435 miles.
(2): Job J2S3295 Route 61 RALLS County. Resurface and ADA improvements from Rte. 61 to 0.2 mile north of Rte. 19 at New London, the total length of improvement being 1.586 miles.

Job J3S0623 Route 161 MONTGOMERY County. Bridge replacement over Smith Branch 3.4 miles south of Rte. 19 near Danville, the total length of improvement being 0.135 miles.

(1): Job J3S3106 Route 765 PETTIS County. ADA improvements from Morgan Street to Pacific Street, the total length of improvement being 0.256 miles.
(2): Job J7S3403 Route B BENTON County. ADA improvements from Jefferson Street to 0.03 miles north of Valley Street in Cole Camp, the total length of improvement being 0.043 miles.

Job J4I3197 Route 273 PLATTE County. Bridge replacement over I-29, the total length of improvement being 0.298 miles.
Job J4I3325 Route I-29 VARIOUS County. Sign installation at various ramps along I-29, the total length of improvement being 33.661 miles.
Job J5S3429 Route H PULASKI County. Bridge rehabilitation over I-44 in Waynesville, the total length of improvement being 0.02 miles.
Job J5P3425 Route 8 WASHINGTON County. Fiber interconnect, signal improvements and add turn lanes from Route 8 to Route O/U east of Potosi, the total length of improvement being 3.18 miles.
Job J5S3243 Route 100 OSAGE County. Bridge replacement 1.1 miles northwest of Morrison, the total length of improvement being 0.184 miles.
Job J5S3430 Route OO DALLAS, LACLEDE County. Resurface from Route 64A to Route 32 near Bennett Spring State Park, the total length of improvement being 8.925 miles.
Job J5S3432 Route Y HOWARD County. Resurface from Route 124 to State Maintenance Ends, the total length of improvement being 7.501 miles.
Job J0I3006M Route Various VARIOUS County. Job Order Contract for pavement repair in various locations in the St. Louis District, the total length of improvement being 0 miles.

(1): Job J6I3243 Route I-44 FRANKLIN County. 7 Bridge rehabilitations east of MO 100 to Highway OO in Pacific, the total length of improvement being 0.474 miles.
(2): Job J6I3252 Route I-44 ST LOUIS County. 6 Bridge rehabilitations from US Route 66 to BNSF R.R. on I-44 in Eureka, the total length of improvement being 0.917 miles.

Job J6I3405 Route I-44 VARIOUS County. Wrong way signing installation from Route WW/D in Sullivan to 7th Street in St. Louis City, the total length of improvement being 66.669 miles.
Job J6I3426 Route I-64 ST LOUIS CITY County. Add debris netting between 14th Street to 8th Street, the total length of improvement being 0.453 miles.

(1): Job J6M0276 Route Y FRANKLIN County. Resurface from Route YY to Route E, the total length of improvement being 5.255 miles.
(2): Job J6S3420 Route ZZ, Y FRANKLIN County. Resurface from Route C to Route Y on Route ZZ and from Route YY to Route 50 on Route Y, the total length of improvement being 13.409 miles.

Job J6P3333 Route Various VARIOUS County. Job Order Contract for pavement repair in various locations in the St. Louis District, the total length of improvement being 0 miles.

(1): Job J6S3240 Route I-55 JEFFERSON County. Coldmill, resurface, & drainage from Route M to Route Z, the total length of improvement being 4.327 miles.
(2): Job J6S3421 Route I-55 JEFFERSON County. Resurface and ADA improvements from Vogel Road to end of maintenance and Imperial Main Street from OR 55 to Old State Road, the total length of improvement being 4.232 miles.

Job J6S3287 Route Various JEFFERSON County. 6 Bridge rehabilitations on Routes 30, B, NN and MM, the total length of improvement being 1.132 miles.
Job J6S3390 Route 30 JEFFERSON County. Grading and pavement from Rivermont Trail to 0.5 miles west and then from Local Hillsboro Road to 500 feet east, the total length of improvement being 0.57 miles.

(1): Job J7I3412 Route I-44 WEBSTER County. Pavement repair various locations in Webster County, the total length of improvement being 41.218 miles.
(2): Job J8P3182 Route Various CHRISTIAN, GREENE County. Pavement repair various locations around Springfield, the total length of improvement being 142.2 miles.

(1): Job J7P3105B Route 376 TANEY County. Bridge rehabilitation 0.5 miles east of Rte 265 in Branson, the total length of improvement being 0.23 miles.
(2): Job J8P3068B Route 60, 65 GREENE County. Bridge rehabilitation at the US 60 & US 65 interchange in Greene County, the total length of improvement being 0.759 miles.
(3): Job J8P3068C Route 65 GREENE County. Bridge rehabilitation at the US160 and I-44 and the US 65 and Route D interchanges, the total length of improvement being 0.08 miles.

(1): Job J7P3244 Route 37 BARTON County. ADA Improvements from Jefferson Street to Gallagher Road in Golden City, the total length of improvement being 0.324 miles.
(2): Job J7S3247 Route H JASPER County. ADA improvements from Park St. to 4th St. in Jasper, the total length of improvement being 0.38 miles.
(3): Job J7S3253 Route MM JASPER County. ADA improvements at Ruby Jack Trail crossing and from 3rd Street to Grant Street in Oronogo, the total length of improvement being 0.414 miles.

(1): Job J7P3246 Route 82 CEDAR County. ADA improvements from McCrary street to Route 54 in El Dorado Springs, the total length of improvement being 1.165 miles.
(2): Job J7S3182 Route WW ST CLAIR County. ADA improvements various locations on Rt WW in Osceola, the total length of improvement being 0.958 miles.

Job J7S3251 Route K HENRY County. ADA improvements on various locations on Route K in Urich, on Route K in Germantown, from California Ave. to Missouri Ave. in Montrose and from High St. to Mechanic St, the total length of improvement being 1.148 miles.
Job J8P3067B Route 13 GREENE County. Bridge rehabilitation from 1.75 miles South of Route O to 2.5 North of I-44 North of Springfield, the total length of improvement being 0.239 miles.
Job J8P3087B Route 160 CHRISTIAN County. Intersection improvements on US 160 and South Street in Nixa., the total length of improvement being 0.33 miles.
Job J8Q3180 Route 160 CHRISTIAN, GREENE County. ITS improvements from South Street to Farm Road 192, the total length of improvement being 4.2 miles.

(1): Job J9I3110 Route I-55 CAPE GIRARDEAU, PERRY County. Resurface 0.7 miles South of Route KK to Route T, the total length of improvement being 13.876 miles.
(2): Job J9I3309 Route I-55 VARIOUS County. Resurface in southbound lane from Route 51 to Route 61 and from Route 74 to Route 77 and in northbound lane from Route 77 to Route M, the total length of improvement being 45.213 miles.

Job J9P3091 Route 84 DUNKLIN County. Bridge painting and rehabilitation over St. Francis River, the total length of improvement being 0.361 miles.
Job J9P3512 Route 62 NEW MADRID County. Coldmill and resurface from Route 25 to Route 61, the total length of improvement being 18.828 miles.
Job J9P3520 Route 412 DUNKLIN County. Resurface from end of divided highway to Route VV, the total length of improvement being 21.14 miles.
Job J9P3631 Route Various VARIOUS County. Job Order Contract for asphalt repair on all major highways except interstates in the Southeast District, the total length of improvement being 0 miles.
Job J9S3634 Route Various VARIOUS County. Job Order Contract for concrete pavement repair on all major highway except interstates in the Southeast district, the total length of improvement being 0 miles.
Job J9S3219 Route BUS 63 OREGON County. Bridge replacement over Burlington Northern Santa Fe Railroad and Two Mile Creek, the total length of improvement being 0.112 miles.

EDIT: More projects added to letting
Job J1S3377 Route B ATCHISON County. Pavement repair and resurface from I-29 to US 59 near Rock Port, the total length of improvement being 15.641 miles.

(1): Job J1S3209 Route C CARROLL County. Culvert replacement over Branch of Turkey Creek 1.9 miles west of Route F, the total length of improvement being 0.12 miles.
(2): Job J1S3209B Route C CARROLL County. Culvert replacement over Turkey Creek 1.9 miles west of Route F, the total length of improvement being 0.1373 miles.


(1): Job J2S2168 Route D MACON County. Bridge replacement Over Burlington Northern Santa Fe Railroad in La Plata, the total length of improvement being 0.122 miles.
(2): Job J2S3198 Route DD MACON County. Bridge replacement over Billy's Branch 0.8 mile west of Route K near Ten Mile, the total length of improvement being 0.08 miles.


Job J3P3185 Route 65 PETTIS County. Bridge rehabilitations 1.6 miles south of Route B, over Flat Creek, the total length of improvement being 0.449 miles.
Job J6I3383 Route I-44 ST LOUIS County. Sign improvements from Crawford County line to I-70 in St. Louis City, the total length of improvement being 68.8 miles.

(1): Job J8P0588I Route 14 CHRISTIAN County. Grading and pavement from 32nd Street to 22nd Street in Ozark, the total length of improvement being 0.752 miles.
(2): Job J8P3015 Route 14 CHRISTIAN County. Grading and pavement on Jackson Street at Route NN in Ozark, the total length of improvement being 0.458 miles.
(3): Job J8P3096 Route 14 CHRISTIAN County. Grading and pavement on Jackson Street to 0.1 miles west of Route NN in Ozark, the total length of improvement being 0.62 miles.
(4): Job J8P3115 Route 14 CHRISTIAN County. Coldmill and resurface through the City of Ozark, from 3rd Street to 6th Street, the total length of improvement being 2.756 miles.
Title: Re: MODOT Contract Lettings
Post by: skluth on February 11, 2020, 12:09:42 AM
(1): Job J2P3130 Route 61 MARION County. Resurface from 0.6 Miles South of Route F to 0.4 Miles North of Route 168 near Hannibal, the total length of improvement being 11.451 miles.
(2): Job J2P3168 Route 24 MARION County. Resurface from Route 61 to 0.5 Mile North of Route 36 near Hannibal, the total length of improvement being 4.419 miles.
(3): Job J2P3173 Route 24, 61 MARION County. Intersection improvements at Route 61, 24, and F intersection near Palmyra, the total length of improvement being 0.405 miles.

Interesting how the control cities for southbound US 61/westbound US 24 will be changing from Hannibal and Monroe City to St. Louis and Kansas City (easternmost mention of Kansas City on US 24?).
That's actually a good idea. The locals already know which roads to take locally. But any long distance drivers aren't likely to know whether they're going towards STL or KC from the older control cities, even if they'll more likely take US 36 and I-35 to KC instead of US 24.
Title: Re: MODOT Contract Lettings
Post by: mvak36 on April 02, 2020, 04:38:47 PM
April 17, 2020 Letting: Bid Results (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=8721). Bid Award Winners (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=8761)

Projects listed in blue font are part of Missouri Focus on Bridges (https://www.modot.org/focus-bridges) program.

Job J0I3006B Route I-29, I-229 VARIOUS County. Job Order Contract for asphalt pavement repair from the Iowa State line to the Platte County Line, the total length of improvement being 0 miles.
Job J0I3006D Route I-35 VARIOUS County. Job Order Contract for asphalt pavement repair from the Iowa State line to the Clay County line, the total length of improvement being 0 miles.
Job J1P3298 Route 36 VARIOUS County. Job Order Contract for asphalt pavement repair from the Kansas State line to the Macon County line, the total length of improvement being 0 miles.

(1): Job J2P3222 Route 136 SCHUYLER County. ADA improvements from Fifth Street to Perry Street in Lancaster, the total length of improvement being 0.156 miles.
(2): Job J2P3224 Route 136 SCHUYLER County. ADA improvements from Cemetery Street to Angus Drive and on Route A from Route 136 to Bondurant Street in Downing, the total length of improvement being 0.874 miles.
(3): Job J2S3221 Route M MACON County. ADA improvements from Aaron Street to Orchard Street in Atlanta, the total length of improvement being 0.184 miles.

Job J3S3083 Route 131 JOHNSON, LAFAYETTE County. Resurface and add shoulders from Odessa south city limits to Highway 50, the total length of improvement being 10.458 miles.
Job J3S3137 Route Y PETTIS County. Resurface and ADA improvements from Quisenberry Road to Route 65, the total length of improvement being 3.169 miles.
Job J4P3266 Route Various VARIOUS County. Bridge rehabilitations at various locations throughout the urban Kansas City district, the total length of improvement being 0.714 miles.
Job J4Q3397 Route Various VARIOUS County. ITS improvements in the urban Kansas City District, the total length of improvement being 0 miles.
Job J4S3294 Route Various VARIOUS County. Signal improvements in various locations in the Kansas City District, the total length of improvement being 0 miles.
Job J5P3427 Route Various BOONE County. Fiber Interconnect in Columbia, the total length of improvement being 9.467 miles.
Job J5S3248 Route EE HOWARD County. Bridge deck replacement Route EE approximately 2 miles west of route J, the total length of improvement being 0.076 miles.
Job J6I3389 Route I-55 JEFFERSON County. Grading and pavement Route I-55 near St. louis county, the total length of improvement being 0.785 miles.
Job J6I3506 Route I-44 FRANKLIN County. Rock removal west of Route OO, the total length of improvement being 0.14 miles.

(1): Job J7I3343 Route I-44 VARIOUS County. Sign installation at various interchanges, the total length of improvement being 90.199 miles.
(2): Job J8I3146 Route I-44 GREENE County. Sign installation at various interchanges, the total length of improvement being 21.521 miles.

(1): Job J7P3187I Route 571 JASPER County. Intersection improvements intersection of Elk St. and Fairlawn Ave, the total length of improvement being 0.102 miles.
(2): Job J7S3269 Route 571 JASPER County. Coldmill and resurface from south of Route E to I-49 in Carthage, the total length of improvement being 1.509 miles.
(3): Job J7S3284 Route 571 JASPER County. ADA improvements from Rte E to South of Fir Rd in Carthage, the total length of improvement being 1.236 miles.

Job J0I3006T Route Various VARIOUS County. Job Order Contract for asphalt pavement repairs from the Jefferson County Line to the Arkansas State Line on I-55 and all of I-57 and I-155, the total length of improvement being 0 miles.
Job J0I3006U Route Various VARIOUS County. Job Order Contract for concrete pavement repairs from the Jefferson County Line on I-55 to the Arkansas State line and all of I-57 and I-155, the total length of improvement being 0 miles.

(1): Job J9I3559 Route I-55, I-57 MISSISSIPPI, SCOTT County. Light installation in various locations in the Southeast District, the total length of improvement being 2.455 miles.
(2): Job J9I3572 Route I-155 PEMISCOT County. Light installation on Route U exit 4 and Route 84 exit 6, the total length of improvement being 1.308 miles.

Job J9P3578 Route Various VARIOUS County. Job Order Contract for guard cable and guardrail repairs in various locations in the Southeast District, the total length of improvement being 0 miles.
Job J9P3578B Route Various VARIOUS County. Job Order Contract for guardrail and guard cable repairs in various locations in the Southeast District, the total length of improvement being 0 miles.
Title: Re: MODOT Contract Lettings
Post by: mvak36 on April 02, 2020, 04:59:28 PM
I missed this earlier but apparently they awarded a Design-Build contract for the I-70 Climbing Lanes (https://www.modot.org/mineola-hill-climbing-lanes-design-build) project during yesterday's meeting.

News Release: https://www.modot.org/node/18315
Quote

ESS Team Selected for I-70 Climbing Lanes at Mineola Hill in Montgomery County
Project Expected to be Completed by Nov. 30, 2021

HANNIBAL – By the end of next year, drivers will have the opportunity to utilize a third lane on both east and westbound Interstate 70 in Montgomery County in the area known as Mineola Hill. The ESS Team, headquartered in Columbia, Missouri, was selected today as the apparent best-value proposer by the Missouri Highways and Transportation Commission.

This highway project was made possible by a federal Infrastructure for Rebuilding America (INFRA) grant in combination with the replacement of the I-70 Missouri River Bridge at Rocheport in Boone and Cooper Counties.

The ESS Team is comprised of Emery Sapp & Sons serving as the prime contractor and Bartlett & West providing design services.

The ESS Team was one of three design-build teams competing for the contract. Design-build is a project delivery method that combines both the design and construction phases into one contract to save time and resources. Information about the project can be found at https://www.modot.org/mineola-hill-climbing-lanes-design-build.

“The project’s primary purpose is to construct eastbound and westbound truck climbing lanes near Mineola Hill to enable traffic to flow more safely and efficiently and to replace the bridges within the project limits to replace existing deficient structures,” explained MoDOT Project Director Brandi Baldwin. Construction on the project will begin later this summer.

“We’re proud to have been selected to build the new lanes and look forward to a good working relationship with the team and the region,” said Matt Oesch, project manager for the ESS Team. “We’re committed to building a quality project at a good value as quickly as possible.”

The project goals are:
   
  • Optimize traffic flow and safety with the project limits during and after construction.
  • Use the available resources wisely to improve safety, reliability and long-term performance of the assets with the project limits.
  • Meet or beat the construction completion date of Nov. 30, 2021.The ESS Team’s goal is to subcontract 10 percent of the construction and 14 percent of the professional and design activities to Disadvantaged Business Enterprise companies.  Federal workforce goals also require that 11.4 percent of those working on the project are minorities, and 6.9 percent are female.
  • The next step in the design-build process is for the ESS Team to fine-tune its design plans. Construction is expected to begin in July.
  • The program budget is $15.8 million dollars which includes preliminary engineering, construction engineering, stipends and the $14.4 million dollar design-build contract.

Title: Re: MODOT Contract Lettings
Post by: Revive 755 on April 02, 2020, 09:51:48 PM
Job J6I3389 Route I-55 JEFFERSON County. Grading and pavement Route I-55 near St. louis county, the total length of improvement being 0.785 miles.

Aux lane for SB I-55 between Route A and US 67 in the Festus - Crystal City area.
Title: Re: MODOT Contract Lettings
Post by: mvak36 on April 29, 2020, 10:49:04 AM
May 15, 2020 Letting: Bid Results (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=8781). Bid Award Winners (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=8821).

Projects listed in blue font are part of Missouri Focus on Bridges (https://www.modot.org/focus-bridges) program.

Job J2P3262 Route Various VARIOUS County. Job Order Contract for guardrail repair at various locations in the Northeast District, the total length of improvement being 0 miles.
Job J2P3364 Route US 61 LEWIS County. Lighting improvements at Rte. P interchange in Canton, the total length of improvement being 0.501 miles.
Job J0I3006F Route Various VARIOUS County. Job Order Contract for asphalt pavement repair at various interstate locations in the urban Kansas City District, the total length of improvement being 0 miles.
Job J0I3006H Route I-70 VARIOUS County. Job Order Contract for asphalt repair at various locations in the Kansas City District, the total length of improvement being 0 miles.
Job J3P3118C Route Various PETTIS County. Signal improvement at various intersection in Sedalia, the total length of improvement being 0 miles.
Job J4I3175 Route Various VARIOUS County. Job Order Contracting for bridge repair at various locations in the urban Kansas City District, the total length of improvement being 0 miles.
Job J4I3239 Route Various VARIOUS County. Job Order Contract for lighting repair at various locations in the urban Kansas City District, the total length of improvement being 0 miles.
Job J4I3269 Route Various VARIOUS County. Job Order Contracting for fence repair at various location in the urban Kansas City District, the total length of improvement being 0 miles.
Job J4P3187 Route Various VARIOUS County. Job Order Contract for concrete pavement repair in various major route locations in the urban Kansas City District, the total length of improvement being 0 miles.
Job J4P3381 Route Various VARIOUS County. Sign installation at various locations in the urban Kansas City District, the total length of improvement being 0 miles.
Job J4S3167 Route 7 JACKSON County. Signal improvements and add intersection turn lanes on 8th Street in Blue Springs, the total length of improvement being 0.379 miles.
Job J4S3205 Route 1 CLAY County. Build new roundabout on Route 1 at Parvin Road, the total length of improvement being 0.108 miles.
Job J5P3426 Route Various CALLAWAY, COLE, MILLER County. Signal improvements at MO 52 and RT CC in Eldon; at RT OO and Summit Dr. in Holts Summit; at RT C and RT CC in Jefferson City, the total length of improvement being 0 miles.
Job J5S3322 Route 66 LACLEDE County. Bridge removal west of Lebanon over the Gasconade River, the total length of improvement being 0.265 miles.
Job J5S3431 Route N, Y MARIES County. Resurface from Route 133 to Route 28 and Route Y from Route 28 to the ends of state maintenance, the total length of improvement being 8.544 miles.
Job J6I3515 Route I-70 ST CHARLES County. Pavement improvements from Mid Rivers Mall Drive to Fifth Street, the total length of improvement being 6.767 miles.
Job J6I3525 Route Various ST CHARLES, ST LOUIS County. Box culvert & channel cleanout at various locations in the St. Louis District, the total length of improvement being 0 miles.
Job J6M0274 Route Various VARIOUS County. Signal improvements at various locations in the St. Louis District, the total length of improvement being 0 miles.

(1): Job J6P3188B Route 141 ST LOUIS County. Interchange improvements and bridge improvements at the Route 364 interchange, the total length of improvement being 0.338 miles.
(2): Job J6P3188C Route 141 ST LOUIS County. Interchange Improvements at the Route 364 interchange, the total length of improvement being 1.619 miles.

Job J6P3246 Route 50 FRANKLIN County. Resurface and intersection improvements at Route EE and East Denmark Rd. near Union, MO, the total length of improvement being 2.809 miles.
Job J6P3380 Route Various ST LOUIS, ST LOUIS CITY County. Job Order Contract for guardrail repair at various locations throughout St. Louis County/City, the total length of improvement being 0 miles.
Job J6P3381 Route Various VARIOUS County. Job Order Contract for guard cable repair at various locations throughout the St. Louis District, the total length of improvement being 0 miles.
Job J6P3382 Route Various VARIOUS County. Job Order Contract for fence repair at various locations throughout the St. Louis District, the total length of improvement being 0 miles.
Job J6S3258 Route 115 ST LOUIS CITY County. Microsurface and ADA improvements from St. Louis city limits to Natural Bridge, the total length of improvement being 4.86 miles.
Job J6S3275 Route 231 ST LOUIS County. Pavement rehabilitation just south of River City Casino Blvd along Rte. 231 to Franru Lane, the total length of improvement being 2.872 miles.
Job J6S3300 Route F ST CHARLES County. Pavement and shoulder improvements from Route D in New Melle to Route 94 near Defiance, the total length of improvement being 10.329 miles.
Job J6S3402 Route AF FRANKLIN County. Signal and lighting improvements at Route 185 and I-44 ramps in Sullivan, the total length of improvement being 0.498 miles.
Job J6S3514 Route I-64 ST LOUIS County. Drainage improvements on south outer road east of Timberlake Manon Drive and on north outer road east of Mason Road, the total length of improvement being 0.114 miles.
Job J6I2222 Route I-64 ST LOUIS CITY County. Interchange improvements from west of Ewing Ave to east of 21st Street, the total length of improvement being 0.89 miles.

(1): Job J7P2228C Route 160 DADE County. Bridge deck replacement over Stockton Lake, 4 miles east of Greenfield, the total length of improvement being 0.443 miles.
(2): Job J7P3195 Route 160 DADE County. Bridge deck replacement over Stockton Lake, 4 miles east of Greenfield, the total length of improvement being 0.333 miles.


(1): Job J7P3120 Route 37 BARRY County. Coldmill, resurface and ADA improvements from south of Route 60 to the Arkansas State line, the total length of improvement being 31.67 miles.
(2): Job J7P3400 Route 37 BARRY County. Resurface and add passing lane 1 mile north of Wahburn, the total length of improvement being 0.845 miles.

Job J7P3416 Route Various VARIOUS County. Job Order Contract for guardrail and guard cable repair at various locations in the rural Southwest District, the total length of improvement being 0 miles.

(1): Job J8P3113 Route 60 GREENE County. Coldmill and resurface from Route 174 in Republic to Route 413, the total length of improvement being 8.326 miles.
(2): Job J8P3127 Route 60 GREENE County. Coldmill and resurface from west of Illinois Street to 174, the total length of improvement being 5.143 miles.
(3): Job J8S3159B Route 60 GREENE County. Intersection improvements at Route 174 in Republic, the total length of improvement being 0.562 miles.

Job J8P3183 Route Various VARIOUS County. Job Order Contract for guardrail and guard cable repair in the urban Southwest District, the total length of improvement being 0 miles.
Job J9M0276 Route BUS 67 BUTLER County. Conduit installation from Route W on BU 67 to BU 60, the total length of improvement being 2.552 miles.
Job J9P3212 Route 17 TEXAS County. Bridge replacement over Big Creek, the total length of improvement being 0.287 miles.
Job J9P3623 Route Various PEMISCOT, PERRY County. Slide repair at various locations within the Southeast District, the total length of improvement being 0 miles.
Job J9P3662 Route Various VARIOUS County. Pavement marking along Route 60 and Route 67, the total length of improvement being 0 miles.
Job J9S3063 Route BUS 61 SCOTT County. Bridge replacement over Route M and Railroad, the total length of improvement being 0.187 miles.
Job J9S3637 Route Various VARIOUS County. Job Order Contract for ADA transition plan improvements at various locations in Southeast District, the total length of improvement being 0 miles.
Title: Re: MODOT Contract Lettings
Post by: mvak36 on May 14, 2020, 10:24:54 PM
Not many listings in this letting (probably due to funding issues due to COVID). I will update this post if more projects are added.

June 19, 2020 Letting: Bid Results (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=8841). Bid Award Winners (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=8881).

Projects listed in blue font are part of Missouri Focus on Bridges (https://www.modot.org/focus-bridges) program.

Job J1I3233 Route I-229 ANDREW, BUCHANAN County. Coldmill and resurface from I-29, north of St. Joseph, to Route 371, the total length of improvement being 10.66 miles.
Job J7P3174 Route 54 VERNON County. Bridge deck replacement over Missouri and Northern Arkansas Railroad in Nevada, the total length of improvement being 0.257 miles.
Job J7P3190G Route 266 GREENE County. Bridge replacement over Pickerel Branch 1.3 miles east of Plano, the total length of improvement being 0.05 miles.
Job J9S3616 Route AB HOWELL County. Grading and pavement from 2.2 miles west of Route 160 to 2 miles west of Route 160, the total length of improvement being 0.214 miles.

EDIT: Additional project added to letting.
Job J1P3236 Route 36 CALDWELL, LINN, LIVINGSTON County. Coldmill and resurface from Parson's Creek to Macon Co., LAJR from Clinton to Macon Counties, the total length of improvement being 73.358 miles.
Title: Re: MODOT Contract Lettings
Post by: mvak36 on June 03, 2020, 11:32:01 PM
The winning bids for the May letting (https://www.aaroads.com/forum/index.php?topic=19531.msg2495205#msg2495205) were announced at the MHTC meeting today (6/3)
Title: Re: MODOT Contract Lettings
Post by: Gnutella on June 04, 2020, 12:19:49 AM
Good, Mineola Hill is always a clusterfuck.
Title: Re: MODOT Contract Lettings
Post by: skluth on June 08, 2020, 04:57:06 PM
Job J6I3389 Route I-55 JEFFERSON County. Grading and pavement Route I-55 near St. louis county, the total length of improvement being 0.785 miles.

Aux lane for SB I-55 between Route A and US 67 in the Festus - Crystal City area.

That's nice and probably needed. But what's really needed is a NB US 67 to NB I-55 flyover ramp. I hate that cloverleaf ramp and I bet any traffic on NB I-55 hates slowing down for all the traffic entering from that ramp.
Title: Re: MODOT Contract Lettings
Post by: STLmapboy on July 02, 2020, 12:30:55 AM
(1): Job J6S3141 Route 109 ST LOUIS County. Bridge rehabilitation over Route 100, the total length of improvement being 0.104 miles.
(2): Job J6S3141B Route 109 ST LOUIS County. Add roundabout at Route 100, the total length of improvement being 0.3492 miles.
(3): Job J6S3141C Route 109 ST LOUIS County. Add bicycle/pedestrian trail s/o Route 100 to Cambury Lane, the total length of improvement being 0.281 miles.
(4): Job J6S3141D Route 109 ST LOUIS County. Add roundabout at Main Street, the total length of improvement being 0.19 miles.

My uncle is a city planner in Wildwood and was looking to MoDOT for a few years to get the south roundabout in at 109. Glad everything's gone through by now.
Title: Re: MODOT Contract Lettings
Post by: ozarkman417 on July 13, 2020, 12:33:22 PM
MODOT hasn't released any new bid lettings for quite some time now. Could it be the second wave? Funding?  Even the last one had very few projects.
Title: Re: MODOT Contract Lettings
Post by: mvak36 on July 14, 2020, 12:33:09 PM
The winning bids for the June letting (https://www.aaroads.com/forum/index.php?topic=19531.msg2499643#msg2499643) were announced at the MHTC meeting on July 8.
Title: Re: MODOT Contract Lettings
Post by: mvak36 on July 14, 2020, 12:36:52 PM
MODOT hasn't released any new bid lettings for quite some time now. Could it be the second wave? Funding?  Even the last one had very few projects.

We'll find out either this week or next week when they post the August lettings in their Online Plans (https://www.modot.org/modot-online-plans-room) room. I'm guessing with the funding issues there might not be too many.
Title: Re: MODOT Contract Lettings
Post by: mvak36 on July 16, 2020, 03:52:55 PM
August 21, 2020 Letting: Bid Results (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=8901). Bid Award Winners (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=8941).

Projects listed in blue font are part of Missouri Focus on Bridges (https://www.modot.org/focus-bridges) program.

Job J1S3122 Route V HARRISON County. Bridge replacement over Coal Creek, 1.2 miles north of Rte. WW near Cainsville, the total length of improvement being 0.143 miles.
Job J1S3344 Route 111 HOLT County. Resurface from Rte. 118 to Rte. 159 near Big Lake and on SP 111 from Rte. 111 to Rte. 59 in Craig, the total length of improvement being 4.439 miles.

(1): Job J1S3354 Route D ATCHISON County. Resurface from Rte. A to Rte. 136 near Phelps City, the total length of improvement being 5.026 miles.
(2): Job J1S3357 Route U ATCHISON County. Resurface from Rte. 136 to Rte. E near Phelps City, the total length of improvement being 3.655 miles.
(3): Job J1S3358 Route E ATCHISON County. Resurface from Rte. U to Rte. 111 near Langdon, the total length of improvement being 2.345 miles.
(4): Job J1S3375 Route W HOLT County. Resurface from I-29 to Rte. 111 in Corning, the total length of improvement being 0.762 miles.

(1): Job J1S3355 Route V ATCHISON County. Resurface from Iowa state line to end of state maintenance, the total length of improvement being 5.68 miles.
(2): Job J1S3356 Route Z ATCHISON County. Resurface from I-29 to end of route, the total length of improvement being 3.298 miles.
(3): Job J1S3357B Route U ATCHISON County. Resurface from Rte. E to end of state maintenance near Phelps City, the total length of improvement being 3.808 miles.

(1): Job J1S3374 Route 111 HOLT County. Resurface from Rte. W in Corning to Spur 111 in Craig, the total length of improvement being 8.057 miles.
(2): Job J1S3376 Route 111 ATCHISON, HOLT County. Resurface from Rte. E to Rte. W in Corning, the total length of improvement being 9.812 miles.

Job J2P3262 Route Various VARIOUS County. Job order contract for guardrail repair in Audrain, Randolph, Monroe, Ralls, Marion, Shelby, Pike, Montgomery, Lincoln, Warren Counties, the total length of improvement being 0 miles.
Job J2P3262B Route Various VARIOUS County. Job order contract for guardrail repair in Macon, Schuyler, Scotland, Knox, Adair, Lewis, Clark Counties, the total length of improvement being 0 miles.
Job J4I3382 Route Various VARIOUS County. Sign installation at various locations in the urban Kansas City District, the total length of improvement being 0 miles.
Job J4I3475 Route I-70 JACKSON County. Drainage repair 0.5 miles east of Route H/F, the total length of improvement being 0.058 miles.
Job J0I3006H Route I-70 VARIOUS County. Job Order Contract for asphalt pavement repair at various locations in the Kansas City District, the total length of improvement being 0 miles.
Job J5I3408 Route Various BOONE, CALLAWAY, MORGAN, PULASKI, WASHINGTON County. High friction surface treatment on curves on multiple routes across Central District, the total length of improvement being 3.216 miles.
Job J5P3323 Route 5 LACLEDE County. Coldmill and resurface from west of Adams Ave. to south of Farmers Ln., Rte. 64 at Rte. 5 and add intersection turn lane at exit ramp 129 on I-44 eastbound at Rte. 5 in Lebanon, the total length of improvement being 2.44 miles.
Job J5S3367 Route O CALLAWAY County. Bridge deck replacement over Auxvasse Creek, 6 miles southeast of Fulton, the total length of improvement being 0.36 miles.
Job J6S3513 Route 61, 67, 50 ST LOUIS County. Pavement marking from 0.3 miles south of Rte. D to Swan Drive and Grand Avenue to Barracksview Road, the total length of improvement being 14.018 miles.

(1): Job J7S3181 Route H GREENE, POLK County. Resurface on Rte. H from Rte. 32 to Rte. WW, the total length of improvement being 20.49 miles.
(2): Job J7S3215 Route KK POLK County. Resurface from Rte. 13 to Rte. H, the total length of improvement being 6.697 miles.
(3): Job J8S3092 Route H GREENE County. Resurface from Rte. WW to Stoneridge St., the total length of improvement being 4.431 miles.
(4): Job J8S3185 Route KK GREENE County. Resurface from Rte. H to US 65, the total length of improvement being 5.068 miles.
(5): Job J8S3186 Route AA GREENE County. Resurface from Rte. H to US 65, the total length of improvement being 5.072 miles.

(1): Job J7S3189K Route A BATES County. Resurface from the Kansas state line to I-49, the total length of improvement being 16.632 miles.
(2): Job J7S3189L Route F BATES County. Resurface from Rte. J to Loop 49 in Passaic, the total length of improvement being 9.93 miles.
(3): Job J7S3189M Route J BATES County. Resurface from Kansas state line to Rte. F, the total length of improvement being 5.46 miles.
(4): Job J7S3189N Route Y BATES County. Resurface from Rte. 18 in Merwin to Rte. J in Amsterdam, the total length of improvement being 4.638 miles.

Job J7S3301 Route MO 245 CEDAR, DADE County. Resurface from Rte. 32 west of Fair Play to Rte. 160, the total length of improvement being 16.28 miles.

(1): Job J7M0265 Route Various VARIOUS County. Job Order Contract for signal and lighting repairs at various locations in the Southwest District, the total length of improvement being 0 miles.
(2): Job J7M0266 Route Various VARIOUS County. Job Order Contract for signal and lighting repairs at various locations in the Southwest District, the total length of improvement being 0 miles.
(3): Job J8M0262 Route Various VARIOUS County. Job Order Contract for signal and lighting repair in various locations in the Southwest District, the total length of improvement being 0 miles.

Edit: Additional Projects added
Job J1S3157 Route 139 CHARITON County. Bridge replacement over Grand River Overflow, 1.6 miles west of Rte. EE near Sumner, the total length of improvement being 0.117 miles.
Job J1S3158 Route P HARRISON County. Bridge replacement over White Oak Creek, 0.4 miles west of Rte. TT near McFall, the total length of improvement being 0.091 miles.
Job J2S2185 Route Z CARROLL County. Bridge replacement over Tater Hill Creek, 1.1 miles west of Rte. 65 near Coloma, the total length of improvement being 0.129 miles.
Title: Re: MODOT Contract Lettings
Post by: kphoger on July 16, 2020, 03:58:57 PM
Projects listed in blue font are part of Missouri Focus on Bridges (https://www.modot.org/focus-bridges) program.

Were you planning to format some of them to be blue?
Title: Re: MODOT Contract Lettings
Post by: mvak36 on July 16, 2020, 04:00:24 PM
Projects listed in blue font are part of Missouri Focus on Bridges (https://www.modot.org/focus-bridges) program.

Were you planning to format some of them to be blue?

I haven't seen any yet in the listing. I probably copied that over from another letting. I'll remove it for now and will add it if any of those bridge projects are added.
Title: Re: MODOT Contract Lettings
Post by: US71 on July 18, 2020, 01:53:08 PM
May 15, 2020 Letting:

Job J5S3322 Route 66 LACLEDE County. Bridge removal west of Lebanon over the Gasconade River, the total length of improvement being 0.265 miles.


This project is on hold. The Missouri 66 Association is trying to save this bridge, but the state appears to be dragging its heels and creating new obstacles.
Title: Re: MODOT Contract Lettings
Post by: ozarkman417 on August 17, 2020, 12:00:24 PM
September 18, 2020 Letting:

Projects listed in blue font are part of Missouri Focus on Bridges (https://www.modot.org/focus-bridges) program.

Job J1P3234 Route 136 NODAWAY County. Resurface from 102 River to Rte. 46 near Ravenwood, the total length of improvement being 8.223 miles.
Job J3S3137 Route Y PETTIS County. Resurface from Quisenberry Road to Route 65, the total length of improvement being 3.169 miles.
Job J4P3212 Route H JACKSON County. Intersection Improvement at Pink Hill Rd, the total length of improvement being 0.157 miles.
Job J5I3423 Route I-70 BOONE, CALLAWAY County. Pavement repair from Saline County line to Montgomery County line, the total length of improvement being 99.73 miles.
Job J5P3333 Route 50 COLE County. Resurface from east of West Truman Blvd. to east of Kaylor Bridge Road and from east of Route M to east of Stoney Gap Road, the total length of improvement being 12.399 miles.

(1): Job J5P3343 Route 47 WASHINGTON County. Seal coat from the Franklin County Line to Rte. 21, the total length of improvement being 11.064 miles.
(2): Job J5S3345 Route 47 WASHINGTON County. Seal coat from Rte. 21 to St. Francois County line, the total length of improvement being 8.472 miles.

Job J5S3264 Route N OSAGE County. Bridge replacement over Contrary Creek north of Freedom, the total length of improvement being 0.104 miles.
Job J5S3281 Route FF DENT County. Bridge replacement over Norman Creek, the total length of improvement being 0.066 miles.
Job J5S3282 Route N MARIES County. Bridge deck replacement over Rodgers Creek, the total length of improvement being 0.035 miles.
Job J5S3316 Route Various COOPER, HOWARD County. Resurface from Rte. U to Rte. 50 in Tipton, on Rte. W from Rte. A to Rte. 240 and on Rte. EE from Rte. A to Rte. J in Howard County, the total length of improvement being 33.838 miles.
Job J5S3331 Route Various LACLEDE County. Seal coat on various routes in Laclede County, the total length of improvement being 15.621 miles.
Job J5S3353 Route Various ST FRANCOIS, WASHINGTON County. Seal coat on various routes in Washington and St. Francois counties, the total length of improvement being 33.579 miles.
Job J5S3355 Route D,V MARIES, PULASKI County. Seal coat from Rte. 28 to I-44 and Maries County Rte. V from Rte. 42 to Rte. N, the total length of improvement being 16.516 miles.
Job J5S3504 Route F CALLAWAY County. Bridge rehabilitation over US 54 west of Fulton, the total length of improvement being 0.049 miles.
Job J5S3385 Route U WASHINGTON County. Resurface from Route 8 to Route M, the total length of improvement being 9.536 miles.
Job J6P3523 Route 67 ST LOUIS County. Pavement improvements from north of I-70 to south of Page Avenue, the total length of improvement being 3.651 miles.
Job J6S3049 Route 180 ST LOUIS County. Resurface from Interstate 170 to St. Louis City limits, the total length of improvement being 3.633 miles.
Job J6S3233 Route 30 ST LOUIS County. Signal Improvements from Sappington Road to Seibert Avenue, the total length of improvement being 0 miles.
Job J6S3545 Route 70 ST LOUIS CITY County. Bridge rehabilitation over I-70 at West Florissant Avenue, the total length of improvement being 0.108 miles.
Job J7I3358 Route I-49 MCDONALD County. Resurface from 1.5 miles north of Rte. EE to Goodin Hollow Road, the total length of improvement being 7.179 miles.
Job J7P3281 Route US54 VERNON County. Resurface from the Kansas State line to Webster Street in Nevada, the total length of improvement being 16.107 miles.

(1): Job J7S3189B Route J BARRY County. Resurface from beginning of state maintenance to Rte. 86 south of Golden, the total length of improvement being 3.741 miles.
(2): Job J7S3189C Route 76 STONE County. Resurface from Flat Creek Road west of Cape Fair to Rte. 173, the total length of improvement being 3.954 miles.
(3): Job J7S3189D Route OO STONE County. Resurface from beginning of route to Rte. 13 near Kimberling City, the total length of improvement being 2.78 miles.

(1): Job J7S3189I Route BB GREENE County. Resurface on Rte. BB From MO 123 To MO 13, the total length of improvement being 11.189 miles.
(2): Job J8S3123 Route O GREENE County. Resurface from Jackson Street in Willard to Rte. 13, the total length of improvement being 5.654 miles.

Job J7S3302 Route B VERNON County. Resurface from I-49 in Sheldon to Rte. 97 and upgrade pedestrian facilities to comply with ADA Transition Plan at First St. in Sheldon, the total length of improvement being 14.861 miles.     
Title: Re: MODOT Contract Lettings
Post by: US71 on August 17, 2020, 12:07:40 PM
I received an e-mail this morning that the MO 76 bridge at Table Rock Lake is being re-decked. Was that on a previous post I missed?
Title: Re: MODOT Contract Lettings
Post by: ozarkman417 on August 17, 2020, 12:41:34 PM
I received an e-mail this morning that the MO 76 bridge at Table Rock Lake is being re-decked. Was that on a previous post I missed?

Quote from:  March 15, 2019 MODOT Bid Lettings
(1): Job J7P2228B Route 76 STONE County. Bridge deck replacement over Table Rock Lake near Cape Fair, the total length of improvement being 0.354 miles.
Title: Re: MODOT Contract Lettings
Post by: mvak36 on August 17, 2020, 01:00:36 PM
September 18, 2020 Letting:
 

Thanks for doing that. Was busy with work last week so I completely forgot about this.
Title: Re: MODOT Contract Lettings
Post by: ozarkman417 on September 11, 2020, 10:22:51 PM
October 16, 2020 Letting:

Projects listed in blue font are part of Missouri Focus on Bridges program.

(1): Job J1P3106 Route 169 GENTRY County. Bridge rehabilitation over Middle Fork Grand River, 0.6 mile east of Rte. YY near Gentry, the total length of improvement being 0.093 miles.
(2): Job J1S3253 Route EE HARRISON County. Bridge rehabilitation over Panther Creek, 0.1 mile south of Rte. F, near New Hampton, the total length of improvement being 0.034 miles.

(1): Job J1S3061 Route B HOLT County. Bridge rehabilitation over I-29 near Oregon, the total length of improvement being 0.091 miles.
(2): Job J1S3136 Route A DEKALB County. Bridge rehabilitation over Lost Creek, 0.5 mile south of Rte. W near Maysville, the total length of improvement being 0.098 miles.

(1): Job J1S3161 Route BB MERCER County. Bridge deck replacement over Branch of Weldon Fork Creek, 3.5 miles west of Rte. 65, near Mercer, the total length of improvement being 0.028 miles.
(2): Job J1S3163 Route Y PUTNAM County. Bridge deck replacement over Blackbird Creek, 2.6 miles south of Rte. 129 near Unionville, the total length of improvement being 0.055 miles.

(1): Job J1S3245 Route 11 LINN County. Scrub seal from intersection of Rte. 11 and Rte. 129 to intersection of Rte. 11 and Bus. Route 36 in Brookfield, the total length of improvement being 21.825 miles.
(2): Job J1S3247 Route 129 LINN, SULLIVAN County. Scrub seal from intersection of Rte. H and Rte. 129 to intersection of Rte. 129 and Rte. 11 south of Green City, the total length of improvement being 11.362 miles.

Job J2P3334 Route 36 MARION, SHELBY County. Pavement improvements from 1.7 miles west of Rte. Z to 0.7 mile west of Bus. 36 west junction at Monroe City, the total length of improvement being 7.231 miles.

(1): Job J2S3204 Route J RALLS County. Seal Coat from Rte. 36 to Rte. 154 at Perry, the total length of improvement being 19.123 miles.
(2): Job J2S3205 Route W MONROE, RALLS County. Seal coat from Rte. 24 in Monroe City to Rte. J, the total length of improvement being 4.001 miles.
(3): Job J2S3209 Route W MARION County. Seal coat from Rte. 61 north junction to Rte. 61 south junction and on Rte. 61 outer road from Rte. W to 0.3 mile south of Rte. W in Hannibal, the total length of improvement being 3.305 miles.
(4): Job J2S3229 Route A MARION County. Resurface from Rte. 6 to Rte. 168 near Palmyra, the total length of improvement being 8.387 miles.
(5): Job J2S3302 Route H MARION, RALLS County. Resurface from Rte. 36 to Rte. 19 at Center, the total length of improvement being 13.541 miles.
(6): Job J2S3305 Route 61 MARION County. Seal coat from 0.1 mile north of Rte. BB to 0.1 mile north of Rte. 24 and Rte. 61 in Palmyra, the total length of improvement being 2.782 miles.
(7): Job J2S3306 Route 168 MARION, SHELBY County. Seal coat from Rte. 15 to Bus 61 in Palmyra, the total length of improvement being 31.169 miles.
(8): Job J2S3331 Route C MARION County. Seal coat from Rte. Z west junction to Rte. 168 near Palmyra, the total length of improvement being 9.759 miles.
(9): Job J2S3348 Route DD RALLS County. Resurface from Rte. 36 to end of state maintenance near Huntington Lane, the total length of improvement being 3.718 miles.
(10): Job J2S3349 Route Z MARION, RALLS County. Seal coat from Rte. C to Rte. 36 near Monroe City, the total length of improvement being 6.788 miles.

Job J3S3147 Route T JOHNSON County. Resurface from Route 58 in Kingsville to Route 2, the total length of improvement being 7.703 miles.
Job J4I3222 Route I-70 JACKSON County. Resurface from Route 7 to Horseshoe Creek bridge, the total length of improvement being 8.742 miles.
Job J4I3233 Route 24 JACKSON County. Sign improvements on I-70 and I-435, the total length of improvement being 29.374 miles.
Job J4P3248 Route 2 CASS County. Resurface and shoulder improvements from the Kansas state line to I-49, the total length of improvement being 16.259 miles.
Job J5I3137 Route I-70 CALLAWAY County. Coldmill and resurface from Cedar Creek at the Boone/Callaway County line to Route 54 in Kingdom City, the total length of improvement being 23.288 miles.
Job J5S3176 Route J GASCONADE County. Bridge replacement over First Creek 0.5 miles west of Rte. 100, the total length of improvement being 0.063 miles.
Job J6P3446 Route Various FRANKLIN, JEFFERSON, ST CHARLES, ST LOUIS, ST LOUIS CITY County. Job order contract for bridge repairs at various major route locations in the St. Louis District, the total length of improvement being 0 miles.
Job J6Q3173E Route Various FRANKLIN, JEFFERSON, ST CHARLES, ST LOUIS, ST LOUIS CITY County. ITS improvements at various locations in the St. Louis District, the total length of improvement being . miles.
Job J7P3107C Route 249, FF JASPER County. Bridge Rehabilitation on northbound bridge over I-44 and on Rte. FF over I-49 and I-44 in Joplin, the total length of improvement being 0.236 miles.

(1): Job J7S3189E Route MM TANEY County. Resurface from Rte. 76 in Mildred to end of Rte., the total length of improvement being 1.177 miles.
(2): Job J7S3189F Route K TANEY County. Resurface from Rte. 76 to end of state maintenance, the total length of improvement being 2.782 miles.
(3): Job J7S3189G Route VV TANEY County. Resurface from beginning of state maintenance to Rte. 76, the total length of improvement being 2.059 miles.
(4): Job J7S3189H Route P TANEY County. Resurface from Rte. 265 to end of state maintenance, the total length of improvement being 0.844 miles.

Job J7S3205 Route 123 POLK County. Bridge replacement over Barren Creek 1.3 miles south of Fair Play, the total length of improvement being 0.061 miles.
Job J7S3292 Route 90 BARRY, MCDONALD County. Resurface and shoulder improvements from Rte. 43 near Southwest City to Rte. 37 near Washburn, the total length of improvement being 45.765 miles.
Job J8S3205 Route NN CHRISTIAN, GREENE County. Resurface from 0.1 mile south of Farm Road 197 to 0.1 mile east of Rte. J in Ozark, the total length of improvement being 4.337 miles.
Job J9I3545 Route I-55 SCOTT County. Resurface from I-57 to Rte. 77, the total length of improvement being 29.245 miles.
Job J9P3233 Route 61 CAPE GIRARDEAU, PERRY, STE GENEVIEVE County. Resurface from Rte. OO to north of Rte. 177, the total length of improvement being 61.14 miles.

*Job 6S3404 & Job 7I3363 are said to appear on this letting according to the FOB document, but is not on MoDOT's Online Plan Room yet.       
Title: Re: MODOT Contract Lettings
Post by: mvak36 on September 12, 2020, 10:59:28 PM
October 16, 2020 Letting:

Job J4I3233 Route 24 JACKSON County. Sign improvements on I-70 and I-435, the total length of improvement being 29.374 miles.
   

Looks like they're doing the signage upgrades for the re-route of US24.
Title: Re: MODOT Contract Lettings
Post by: STLmapboy on September 13, 2020, 04:58:14 PM
October 16, 2020 Letting:

Job J4I3233 Route 24 JACKSON County. Sign improvements on I-70 and I-435, the total length of improvement being 29.374 miles.
   

Looks like they're doing the signage upgrades for the re-route of US24.
I'm sorry, where's 24 being rerouted to?
Title: MODOT Contract Lettings
Post by: mvak36 on September 13, 2020, 05:12:00 PM
October 16, 2020 Letting:

Job J4I3233 Route 24 JACKSON County. Sign improvements on I-70 and I-435, the total length of improvement being 29.374 miles.
   

Looks like they're doing the signage upgrades for the re-route of US24.
I'm sorry, where's 24 being rerouted to?
I think the part from the downtown loop to 435 will now follow 70 till the 70/435 interchange and the north up 435 back to the current US24.
Title: Re: MODOT Contract Lettings
Post by: stridentweasel on September 13, 2020, 06:08:31 PM
I think the part from the downtown loop to 435 will now follow 70 till the 70/435 interchange and the north up 435 back to the current US24.

That seems really out of the way.  Like something Kansas would do.
Title: Re: MODOT Contract Lettings
Post by: mvak36 on September 13, 2020, 10:44:56 PM
Here's the link to MODOT's request of the US24 relocation to AASHTO from back in 2018: https://route.transportation.org/wp-content/uploads/sites/50/2018/09/ALL-USRN-Applications-MO-OH-Annual-Meeting-2018.pdf

Pages 5 and 6 of that pdf have a picture of the new routing.
Title: Re: MODOT Contract Lettings
Post by: mvak36 on September 25, 2020, 06:38:59 PM
I went for a mini-drive today just to get out of the house. I drove by the Lewis and Clark Viaduct, the part of US24 that's being turned back to the city, and the I-435/I-70 interchange by the stadiums.

Viaduct: The bridge looks like its mostly done. The I-beams (not sure if I'm using the correct term) are all in place from end to end and it looks like they're still doing some work on top of the bridge. They said it will open by the end of the year so I'm assuming they're mostly close to getting done.

US24: It's probably a good thing they're routing it on I-70 instead of on that stretch of Independence Avenue. Lot of traffic lights and the road seems kind of cramped. Side note: I kind of wish they would have worked with Kansas and routed US40 and US24 along I-670 instead of having it follow 70, but that's just my opinion.

I-435/I-70 interchange: The turbine ramps are nice. The 435 SB ramp to 70E felt a little steep to me but otherwise not too bad. US24 is already signed on the BGS's on 435 NB and SB as they approach I-70. The exit for the Blue Ridge Cutoff on 70EB looks like it's on the same exit as the one for 70EB to 435SB (it splits off to the left shortly after taking the exit and then merges with the SB to EB turbine ramp for a short stretch before splitting off to the right to go towards the exit). It was signed pretty well on the exit ramp, but I'm not sure how well it was signed on the advance BGS's on 70.
Title: Re: MODOT Contract Lettings
Post by: STLmapboy on September 25, 2020, 07:18:34 PM
Viaduct: The bridge looks like its mostly done. The I-beams (not sure if I'm using the correct term) are all in place from end to end and it looks like they're still doing some work on top of the bridge. They said it will open by the end of the year so I'm assuming they're mostly close to getting done.
You heard about this (https://www.reddit.com/r/missouri/comments/ixsyus/wtf/) by chance?
Title: Re: MODOT Contract Lettings
Post by: mvak36 on September 25, 2020, 07:22:56 PM
Viaduct: The bridge looks like its mostly done. The I-beams (not sure if I'm using the correct term) are all in place from end to end and it looks like they're still doing some work on top of the bridge. They said it will open by the end of the year so I'm assuming they're mostly close to getting done.
You heard about this (https://www.reddit.com/r/missouri/comments/ixsyus/wtf/) by chance?
Nope that’s the first I’m hearing of it. That’s crazy.

Edit: Found this article (https://www.thedrive.com/news/36689/nissan-muranos-urban-adventure-on-unfinished-bridge-is-a-clueless-driver-classic). Hopefully there was no damage to the bridge. It looked like the car took the worst of it.
Title: Re: MODOT Contract Lettings
Post by: mvak36 on September 27, 2020, 01:48:03 PM

*Job 6S3404 & Job 7I3363 are said to appear on this letting according to the FOB document, but is not on MoDOT's Online Plan Room yet.     

Looks like 7I3363 was added. Nothing on the other one though.
Title: Re: MODOT Contract Lettings
Post by: STLmapboy on September 27, 2020, 08:34:36 PM
Viaduct: The bridge looks like its mostly done. The I-beams (not sure if I'm using the correct term) are all in place from end to end and it looks like they're still doing some work on top of the bridge. They said it will open by the end of the year so I'm assuming they're mostly close to getting done.
You heard about this (https://www.reddit.com/r/missouri/comments/ixsyus/wtf/) by chance?
Nope that’s the first I’m hearing of it. That’s crazy.

Edit: Found this article (https://www.thedrive.com/news/36689/nissan-muranos-urban-adventure-on-unfinished-bridge-is-a-clueless-driver-classic). Hopefully there was no damage to the bridge. It looked like the car took the worst of it.
Yeah, a few bent nails but nothing big. Had it happened a few months earlier, when there was no bridge, we may have seen a different story for the car.
Title: Re: MODOT Contract Lettings
Post by: mvak36 on September 29, 2020, 11:36:58 PM
I-435/I-70 interchange: The turbine ramps are nice. The 435 SB ramp to 70E felt a little steep to me but otherwise not too bad. US24 is already signed on the BGS's on 435 NB and SB as they approach I-70. The exit for the Blue Ridge Cutoff on 70EB looks like it's on the same exit as the one for 70EB to 435SB (it splits off to the left shortly after taking the exit and then merges with the SB to EB turbine ramp for a short stretch before splitting off to the right to go towards the exit). It was signed pretty well on the exit ramp, but I'm not sure how well it was signed on the advance BGS's on 70.

Looks like they're getting ready to open the loop ramps at the interchange this week.
https://www.modot.org/node/21085
Quote
JACKSON COUNTY– The Missouri Department of Transportation will have numerous lane and ramp closures at I-435 and I-70 this week as crews prepare to OPEN brand new ramps within the interchange. The new loop ramps leading from I-70 to I-435 are anticipated to open on Thursday, Oct. 1. Motorists should expect delays in the area and plan to find alternate routes if necessary. All work and all ramp openings are weather permitting.
.....
Title: Re: MODOT Contract Lettings
Post by: STLmapboy on October 04, 2020, 06:39:55 PM
Job J6S3258 Route 115 ST LOUIS CITY County. Microsurface and ADA improvements from St. Louis city limits to Natural Bridge, the total length of improvement being 4.86 miles.
I drove along Natural Bridge from 170 to Salisbury today. The microsurfacing is brand new--unstriped--and starts about here (https://www.google.com/maps/@38.6759355,-90.250782,3a,75y,130.3h,81.76t/data=!3m7!1e1!3m5!1snANPBdjdeQcpvygv3jgFRg!2e0!6s%2F%2Fgeo3.ggpht.com%2Fcbk%3Fpanoid%3DnANPBdjdeQcpvygv3jgFRg%26output%3Dthumbnail%26cb_client%3Dmaps_sv.tactile.gps%26thumb%3D2%26w%3D203%26h%3D100%26yaw%3D305.51804%26pitch%3D0%26thumbfov%3D100!7i16384!8i8192/). It went all the way to Salisbury and was poured about a month and a half before--as seen in this (https://www.youtube.com/watch?v=ra0DJsmloOk/) MoDOT video. The concrete median is mostly poured, (as seen here (https://www.youtube.com/watch?v=CqH0Db1PJA8/)) and may be a tad too wide--I found mysellf driving over the bike lane in places, which will presumably be restriped. Cones were everywhere, but I didn't see any workers (it's a Sunday, after all). In places, the middle of the median had mounds of dirt--I assume they'll plant some grass there.

New traffic lights start here (https://www.google.com/maps/@38.6738149,-90.2459045,3a,75y,122.37h,88.94t/data=!3m6!1e1!3m4!1sAiuTsOpJMHmic0zow34-WA!2e0!7i16384!8i8192/), at Shreve, and there are about six to eight of them going down to Salisbury (some old trusses remain). The new lights are standard MO installs, with concrete bases and non-electrified street signs; the signals are Econolite buttonbacks and of course there are FYAs. There are also retroflective yellow backplates, however, which are unusual for Missouri. One of the signals (at Newstead) can be seen in this (https://www.youtube.com/watch?v=MyXsL696m4Y/) video.
Title: Re: MODOT Contract Lettings
Post by: mvak36 on October 15, 2020, 11:57:29 PM
November 20, 2020 Letting: Bid Results (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=9081). Bid Award Winners (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=9121).

Projects listed in blue font are part of Missouri Focus on Bridges (https://www.modot.org/focus-bridges) program.

Job J1S1045 Route 33 DEKALB County. Resurface from Rte. 6 to Rte. 36 near Maysville, the total length of improvement being 8.819 miles.
Job J1S3221 Route 46 NODAWAY County. Resurface from east of the Nodaway River bridge to Icon Road west of Maryville, the total length of improvement being 9.815 miles.
Job J1S3299 Route 59 ANDREW County. Resurface from Rte. I-29 near Fillmore to Rte. 71 near Savannah, the total length of improvement being 5.455 miles.

(1): Job J3P3080 Route 50 PETTIS County. Resurface from Sedalia Sub railway line east to Morgan County, the total length of improvement being 6.992 miles.
(2): Job J3P3080B Route 50 PETTIS County. Pavement improvements from 0.1 miles east of Air Center Circle to 0.1 miles east of Airpark Road, the total length of improvement being 0.254 miles.

Job J3P3093 Route 41 SALINE County. Bridge deck replacement from 1.5 miles east of Rte. 65 over Rte. O and Mexico Sub Railroad, the total length of improvement being 0.1942 miles.
Job J3S3083 Route 131 JOHNSON, LAFAYETTE County. Resurface and add shoulders from Odessa south city limits to Rte. 50, the total length of improvement being 10.458 miles.
Job J4P3213 Route 92 CLAY County. Resurface and add shoulders from Liberty St. in Smithville to Nation Rd. in Kearney on MO 92, the total length of improvement being 8.944 miles.
Job J4S3246 Route 150 JACKSON County. Pavement Improvements from 0.1 miles east of Andrews Road to 0.2 miles west of Byars Road, the total length of improvement being 1.037 miles.
Job J4S3328 Route 12 JACKSON County. Resurface from I-435 to Spring Street, the total length of improvement being 3.082 miles.

(1): Job J5P3199 Route 50 MORGAN County. Intersection Improvements at Rte. 5 west of Tipton, the total length of improvement being 0.755 miles.
(2): Job J5P3272 Route 50 MONITEAU, MORGAN County. Resurface and guardrail improvements from Pettis County line to 0.1 mile west of Bus. 50 west of California, the total length of improvement being 23.001 miles.
(3): Job J5S3267 Route 87 MONITEAU County. Resurface and guardrail improvements from 0.1 mile south of Bus. 50 to Rte. 50 in California, the total length of improvement being 1.87 miles.

Job J5P3379 Route 5 LACLEDE County. Resurface from 0.8 miles south of the Camden County line to 0.2 miles north of Lebanon, the total length of improvement being 11.528 miles.
Job J5S3318 Route E,740 BOONE County. Resurface from 0.9 miles North of I-70 to 0.1 miles East of Route 63, in Columbia, the total length of improvement being 7.209 miles.
Job J6I3356 Route I-70 ST CHARLES County. Resurface from Lake St. Louis Blvd. to Rte. K in O'Fallon, the total length of improvement being 3.421 miles.
Job J6I3544 Route I-55 ST LOUIS County. Pavement Improvements from Weber Rd. to Lindbergh Blvd., the total length of improvement being 4.118 miles.
Job J6I3546 Route I-270,I-64 ST LOUIS County. Pavement Improvements from Rte. 340 to I-44 and Rte. D to I-44, the total length of improvement being 17.472 miles.
Job J6M0275 Route 94 ST CHARLES County. Pavement and drainage improvements at Rte. 94 s-curve in Defiance, the total length of improvement being 0.0728 miles.
Job J6S3425 Route 366 ST LOUIS CITY County. Resurface from St. Louis City Limits to Broadway Ave., the total length of improvement being 5.075 miles.

(1): Job J7I3361 Route I-49 JASPER, NEWTON County. Pavement improvements from I-44 to 0.8 mile south of Rte. FF and at the northbound bridge over Rte. V, the total length of improvement being 2.298 miles.
(2): Job J7I3361B Route I-49 NEWTON County. Resurface and pavement improvements on southbound lanes from Shoal Creek to Rte. 175 and from 0.5 mile to 1.7 miles south of Iris Road, the total length of improvement being 1.72 miles.
(3): Job J7I3482 Route I-44 JASPER County. Resurface on westbound lanes at Rte. 66/Loop 44 east of Duenweg, the total length of improvement being 0.855 miles.

(1): Job J7P3235 Route 65 CHRISTIAN County. Resurface from 1 mile south of Rte. F to 0.4 mile north of Rte. EE, the total length of improvement being 5.763 miles.
(2): Job J8P3116 Route 65 CHRISTIAN County. Resurface from Rte. CC to 1 mile south of Rte. F in Ozark, the total length of improvement being 11.048 miles.

(1): Job J7P3276 Route 13 POLK, ST CLAIR County. Resurface from 0.5 mile north of Rte. UU to 0.1 mile south of 565th Road, the total length of improvement being 49.153 miles.
(2): Job J7P3277 Route 13 GREENE, POLK County. Resurface from 0.1 mile south of 565th Road to Rte. WW, the total length of improvement being 8.66 miles.
(3): Job J8P3118 Route 13 GREENE County. Resurface from Rte. WW to 0.1 mile north of Norton Road in Springfield, the total length of improvement being 11.461 miles.

Job J7P3407 Route 249 JASPER County. Job order contract for slide repair from Rte. 171 in Carterville to Rte. VV (Zora Street) near Joplin, the total length of improvement being . miles.

(1): Job J7P3417B Route Various VARIOUS County. Seal coat at various minor routes in various counties, the total length of improvement being 50.78 miles.
(2): Job J8S3204 Route ZZ GREENE County. Seal coat from Rte. M to Farm Road 194 (County Line Road) in Republic, the total length of improvement being 3.085 miles.

(1): Job J7P3424 Route Various NEWTON, POLK, STONE, WEBSTER County. High friction surface treatment at various locations in Newton, Polk, Stone, and Webster counties, the total length of improvement being 5.184 miles.
(2): Job J8S3193 Route Various CHRISTIAN, GREENE County. High friction surface treatment at various locations in the urban Southwest District, the total length of improvement being 1.174 miles.

(1): Job J8P3032B Route 60 GREENE County. Interchange improvements from National Avenue to Route 65 and reconfigure interchange at Bus 65 (Glenstone Avenue) in Springfield, the total length of improvement being 3.074 miles.
(2): Job J8P3122 Route 60 GREENE County. Resurface from e/o Glenstone to Highland Springs Blvd in Springfield, the total length of improvement being 2.51 miles.

Job J8S3152 Route D GREENE County. Bridge rehabilitation over the James River 3.2 miles east of Springfield, the total length of improvement being 0.234 miles.
Job J9P3394 Route US 63 HOWELL County. Resurface from Rte. N to Rte. 14, the total length of improvement being 5.257 miles.

(1): Job J9S3329 Route W NEW MADRID County. Bridge replacement over Drainage Ditch 2, the total length of improvement being 0.058 miles.
(2): Job J9S3596 Route Z,W NEW MADRID, STODDARD County. Bridge improvements over Drainage Ditches 1, 37, and 40, the total length of improvement being 0.135 miles.

Job J9S3368 Route ZZ DUNKLIN County. Bridge rehabilitation over north Deering Drainage Ditch, the total length of improvement being 0.039 miles.

Edit (additional lettings added):
(1): Job J7P3190H Route K VERNON County. Bridge replacement over Camp Branch 2.6 miles east of Bristow, the total length of improvement being 0.115 miles.
(2): Job J7P3190J Route BB VERNON County. Bridge replacement over Moore Branch 3.5 miles south of Nevada, the total length of improvement being 0.134 miles.


Job J9M0280 Route Bus. 60 BUTLER County. ITS signal conduit from Westwood Boulevard to Main Street, the total length of improvement being 0.856 miles.
Title: Re: MODOT Contract Lettings
Post by: mvak36 on October 15, 2020, 11:59:51 PM
September 18, 2020 Letting:

The projects in this letting have been awarded.
Bid Results (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=8961) & Bid Award Winners (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=9002).
Title: Re: MODOT Contract Lettings
Post by: mvak36 on October 20, 2020, 08:37:32 AM
https://ksisradio.com/modot-to-receive-over-20m-grant-to-replace-bridges/

Quote
MoDOT is set to receive over $20-million in federal grant money to assist in replacing 40 bridges in rural northern Missouri.

Governor Mike Parson's office says MoDOT will be able to replace 40 bridges in the northern part of the state as a result of an announcement by Congressman Sam Graves, in which Missouri has received a $20.7 million federal grant through the U.S. Department of Transportation’s Competitive Highway Bridge Program.

Parson's office says the bridges, all located north of I-70, are in poor condition, weight-restricted, supported by timber pile, and one-lane wide but carry two-way traffic. In addition to removing current detours and preventing future ones, the grant will help increase safety on the state’s rural roads and reduce costs associated with maintaining the bridges.

"Missouri's infrastructure, specifically bridge infrastructure, has been a key focus for our administration since day one. This grant continues the momentum we’ve gained in recent months to invest in infrastructure improvements," Governor Parson said. "Missouri’s farm-to-market roads are critical connections to Missouri’s highways, railways, and waterways, allowing our farmers to compete in the global marketplace. The bridges that will be replaced as a result of this grant would have posed obstacles to that connectivity had they been further weight restricted or closed."

“When this project is complete, there will be no bridges remaining in northern Missouri that meet those criteria,” State Bridge Engineer Dennis Heckman said. He said the bridges, on average, are 77 years old and deteriorating rapidly.

Only 25 states were eligible to apply for the $225 million in the Competitive Highway Bridge Program – those with a population density of 100 or less per square mile, according to a press release from Parson's office. The grant also required that bridges be bundled in a single contract.

MoDOT intends to pursue a design-build contract to deliver this project.

The Competitive Highway Bridge Program grant comes on the heels of an $81.2 million Infrastructure for Rebuilding America (INFRA) grant from the U.S. Department of Transportation to build a new I-70 Missouri River Bridge at Rocheport.

Receipt of the INFRA grant will also trigger $301 million in state bonding, authorized by the Missouri General Assembly during the 2019 legislative session, that will repair or replace another 215 bridges across the state.

“We are poised to deliver these bridge improvement projects as quickly, efficiently, and innovatively as possible,” MoDOT Director Patrick McKenna said. “We are grateful to Congressman Graves, Governor Parson, and Missouri legislators for their support of additional investment in transportation in Missouri.”


They've put up a website for this project: https://www.modot.org/farm-bridge-program

The project will be design-build and is currently planned to be awarded in summer 2021.
Title: Re: MODOT Contract Lettings
Post by: mvak36 on November 12, 2020, 06:53:54 PM
December 18, 2020 Letting: Bid Results (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=9141). Bid Award Winners (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=9162).

Projects listed in blue font are part of Missouri Focus on Bridges (https://www.modot.org/focus-bridges) program.

(1): Job J2P3137 Route 61 RALLS County. Bridge redeck over Norfolk Southern Railroad 0.9 mile north of Rte. HH in Hannibal, the total length of improvement being 0.271 miles.
(2): Job J2P3138 Route 61 RALLS County. Bridge redeck over Bear Creek 0.6 mile north of Rte. HH in Hannibal, the total length of improvement being 0.071 miles.


(1): Job J2P3201 Route 79 LINCOLN County. Seal coat from Pike County line to Route N near Winfield, the total length of improvement being 16.419 miles.
(2): Job J2S3189 Route EE LINCOLN County. Seal coat from Route Y to Route 47 near Winfield, the total length of improvement being 5.247 miles.
(3): Job J2S3238 Route W LINCOLN County. Resurface from Route B to Route KK near Brussells, the total length of improvement being 7.825 miles.
(4): Job J2S3303 Route B LINCOLN County. Resurface from Route 61 to Route 79 at Elsberry, the total length of improvement being 10.586 miles.
(5): Job J2S3308 Route E LINCOLN County. Seal coat from Route O north junction to Route UU in Silex, the total length of improvement being 10.839 miles.

(1): Job J2P3212 Route 15 KNOX, SCOTLAND County. Resurface and sidewalk improvements from Rte. 136 west junction at Memphis to Rte. 6 north junction in Edina, the total length of improvement being 22.307 miles.
(2): Job J2P3362 Route 15 KNOX, SCOTLAND County. Add shoulders from Rte. 136 west junction at Memphis to Rte. 6 north junction in Edina, the total length of improvement being 21.788 miles.

(1): Job J2P3254 Route 24 RANDOLPH County. Resurface from 1.5 miles west of Rte. C to 0.9 mile east of Rte. 63 near Moberly, the total length of improvement being 8.647 miles.
(2): Job J2S3206 Route C MACON, RANDOLPH County. Seal coat from 0.4 mile south of Rte. 36 to Rte. JJ in Huntsville, the total length of improvement being 23.36 miles.
(3): Job J2S3207 Route A RANDOLPH County. Seal coat from Bus. 63 in Moberly to Rte. B south junction near Higbee, the total length of improvement being 9.592 miles.
(4): Job J2S3255 Route EE RANDOLPH County. Resurface from just east of Rte. 63 to end of state maintenance near Moberly, the total length of improvement being 4.719 miles.
(5): Job J2S3350 Route B RANDOLPH County. Chip seal from Rte. 63 near Clark to Rte. 3 near Roanoke in Howard County, the total length of improvement being 18.278 miles.

(1): Job J2S3186 Route N MONTGOMERY County. Bridge replacement over I-70 1.8 miles east of Rte. YY near Mineola, the total length of improvement being 0.203 miles.
(2): Job J2S3187 Route P MONTGOMERY County. Bridge replacement over Dry Fork Creek 0.7 mile south of Rte. K near Americus, the total length of improvement being 0.12 miles.
(3): Job J2S3200 Route J MONTGOMERY County. Bridge rehabilitation over Clear Creek 2.5 miles west of Rte. 19 near Big Spring, the total length of improvement being 0.08 miles.


(1): Job J2S3300 Route B LEWIS County. Resurface from Rte. 61 north of Canton to south of LaGrange at Rte. 61, the total length of improvement being 12.335 miles.
(2): Job J2S3347 Route B LEWIS County. Sidewalk improvements from Henderson Ave. to Oak St. in Canton and from Poage St. to Polk St. in LaGrange, the total length of improvement being 0.613 miles.

Job J4I3200 Route 92 PLATTE County. Interchange and intersection improvements at I-29 in Platte City, the total length of improvement being 0.547 miles.
Job J4I3216 Route 29 PLATTE County. Resurface and guardrail improvements from Platte County line to Rte. 273, the total length of improvement being 9.906 miles.
Job J4P3255 Route 291 JACKSON County. Signal improvements from 0.2 mile north of Stuart Road to 0.1 mile south of Persels Road in Lee's Summit, the total length of improvement being 0.47 miles.

(1): Job J4S3251 Route 78 JACKSON County. Resurface from Speck Road to Rte. 7, the total length of improvement being 4.649 miles.
(2): Job J4S3258 Route 78 JACKSON County. Resurface from Rte. 291 to Belmont Boulevard, the total length of improvement being 0.269 miles.

(1): Job J4S3252 Route 9 PLATTE County. Resurface from Mattox Rd. to I-635 in Riverside, the total length of improvement being 1.593 miles.
(2): Job J4S3261 Route 9 PLATTE County. Resurface from Rte. FF to Mattox Road, the total length of improvement being 1.97 miles.

(1): Job J4S3280 Route 69 CLAY, PLATTE County. Resurface from Klamm Road to Denver Avenue, the total length of improvement being 4.459 miles.
(2): Job J4S3281 Route 69 CLAY County. Resurface from just north of Garrison Road to Denver Avenue, the total length of improvement being 2.908 miles.

Job J4S3290 Route FF PLATTE County. Bridge replacement over Rush Creek 2.1 miles west of Rte. 9 in Parkville and 0.1 mile east of Union Chapel Road, the total length of improvement being 0.043 miles.
Job J5P3338 Route 40 COOPER County. Bridge rehabilitation over Missouri River in Boonville, the total length of improvement being 0.641 miles.
Job J5S3229 Route H COLE County. Bridge superstructure replacement over Bois Brule Creek 2.0 mile south of Rte. E, the total length of improvement being 0.21 miles.

(1): Job J5S3232 Route B/M/124 BOONE County. Resurface from west of Rte. 63 to Rte. DD and Rte. B and Rte. 124 in Hallsville, the total length of improvement being 2.242 miles.
(2): Job J5S3319 Route J/O/UU BOONE County. Resurface and shoulder improvements from Rte. 124 to Rte. O, Rte. J to the end of state maintenance, and Rte. O to I-70 eastbound ramp, the total length of improvement being 23.381 miles.
(3): Job J5S3388 Route A BOONE County. Pavement improvements from Rte. 63 to the end of state maintenance in Hartsburg, the total length of improvement being 4.306 miles.

(1): Job J5S3380 Route CC OSAGE County. Pavement and shoulder improvements from Rte. 50 to the end of state maintenance, the total length of improvement being 4.679 miles.
(2): Job J5S3384 Route B GASCONADE, PHELPS County. Pavement and shoulder improvements from Rte. 28 near Bland to Rte. 68 in St. James, the total length of improvement being 21.154 miles.

Job J6M0282 Route 21/B JEFFERSON County. Culvert replacement from 200 feet west of Old Rte. 21, the total length of improvement being 0.013 miles.

(1): Job J7P3105D Route 65 TANEY County. Bridge rehabilitation over Lake Taneycomo in Branson, the total length of improvement being 0.156 miles.
(2): Job J7P3190L Route 65 TANEY County. Bridge rehabilitation over Lake Taneycomo between Branson and Hollister, the total length of improvement being 0.192 miles.

Job J7P3107J Route 39 DADE County. Bridge rehabilitation over Stockton Lake 4.3 miles north of Greenfield, the total length of improvement being 0.129 miles.
Job J7P3107K Route 83 BENTON County. Bridge deck replacement over Truman Reservoir, the total length of improvement being 0.181 miles.

EDIT: Additional lettings added

(1): Job J1P0862 Route 36 BUCHANAN County. Resurface and guardrail improvements from Missouri River bridge to 0.75 mile east of Rte. AC in St. Joseph, the total length of improvement being 5.005 miles.
(2): Job J1P3237 Route 36 DEKALB County. Resurface and guardrail improvements from East of Rte.31 to Rte. C and from Rte. 33 to the Grindstone River, the total length of improvement being 2.741 miles.

Job J4I3200 Route 92 PLATTE County. Interchange and intersection improvements at I-29 in Platte City, the total length of improvement being 0.547 miles.

(1): Job J4P3015 Route 24 JACKSON County. Bridge replacement from west of Osage St. to 1 mile west of Rte. H and from Burnley Rd. to 0.2 mile west of Osage St. at Union Pacific RR, Drainage Ditch, and Fire Prairie Creek, the total length of improvement being 1.189 miles.
(2): Job J4P3015B Route 24 JACKSON County. Bridge replacement from 0.6 mile east of Burnley Road and 0.2 mile west of Osage Street in Buckner, the total length of improvement being 0.028 miles.
Title: Re: MODOT Contract Lettings
Post by: mvak36 on November 19, 2020, 12:16:29 PM
October 16, 2020 Letting:
 

The projects in this letting have been awarded.
Bid Results (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=9021) & Bid Award Winners (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=9061).

Also, Job J7I3363 was added to this letting after the initial notice.

Job J7I3363 Route I-49 VERNON County. Bridge replacement on southbound bridge over Missouri and North Arkansas Railroad, the total length of improvement being 0.303 miles.
Title: Re: MODOT Contract Lettings
Post by: KCRoadFan on November 24, 2020, 10:01:15 PM
I went for a mini-drive today just to get out of the house. I drove by the Lewis and Clark Viaduct, the part of US24 that's being turned back to the city, and the I-435/I-70 interchange by the stadiums.

Viaduct: The bridge looks like its mostly done. The I-beams (not sure if I'm using the correct term) are all in place from end to end and it looks like they're still doing some work on top of the bridge. They said it will open by the end of the year so I'm assuming they're mostly close to getting done.

US24: It's probably a good thing they're routing it on I-70 instead of on that stretch of Independence Avenue. Lot of traffic lights and the road seems kind of cramped. Side note: I kind of wish they would have worked with Kansas and routed US40 and US24 along I-670 instead of having it follow 70, but that's just my opinion.

I-435/I-70 interchange: The turbine ramps are nice. The 435 SB ramp to 70E felt a little steep to me but otherwise not too bad. US24 is already signed on the BGS's on 435 NB and SB as they approach I-70. The exit for the Blue Ridge Cutoff on 70EB looks like it's on the same exit as the one for 70EB to 435SB (it splits off to the left shortly after taking the exit and then merges with the SB to EB turbine ramp for a short stretch before splitting off to the right to go towards the exit). It was signed pretty well on the exit ramp, but I'm not sure how well it was signed on the advance BGS's on 70.

Last week, I drove up 435 through the reconstructed interchange near the stadiums and I, too, saw the US 24 shields on the 70 West BGS. Further north, I also noticed that the BGS at Exit 59 (US 24/Winner Road/Independence Avenue) had been changed to say "24 East."

That being said, there seems to be some disagreement as to whether 24 still runs along Independence Avenue west of 435. I just drove the length of "the Avenue" earlier this evening, and I saw no fewer than three US 24 shields along that stretch. Perhaps the entity in charge of those signs (either MoDOT or the City of KCMO) believes that 24 still runs along the Avenue, or maybe just hasn't gotten around to taking the shields down yet.

For what it's worth, Exit 2H from the I-70 freeway loop is still marked "24 East" (Street View here: https://www.google.com/maps/@39.1064266,-94.573718,3a,75y,105.35h,75.8t/data=!3m6!1e1!3m4!1sbdkMrtcBzSdHG0PIeyVzgA!2e0!7i16384!8i8192).  Also, both Google Maps and Apple Maps still have US 24 following Independence Avenue through the city, so as far as I'm concerned, that's still the "real" route. There doesn't seem to be much in the way of across-the-board agreement with regards to 24's route, as to whether it's been realigned or not.

(As I mentioned earlier, even MoDOT signage is inconsistent - perhaps the Avenue west of 435 could be signed as Business US 24? Maybe that's a thought...)
Title: Re: MODOT Contract Lettings
Post by: mvak36 on December 04, 2020, 07:11:03 AM
The winning bids for the November letting (https://www.aaroads.com/forum/index.php?topic=19531.msg2540957#msg2540957) were awarded at the MHTC meeting on 12/2.
Title: Re: MODOT Contract Lettings
Post by: mvak36 on December 18, 2020, 02:57:48 PM
January 22, 2021 Letting: Bid Results (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=9182). Bid Award Winners (https://www6.modot.mo.gov/eBidLettingPublicWeb/viewStream.do?documentType=post_info&key=9222).

Projects listed in blue font are part of Missouri Focus on Bridges (https://www.modot.org/focus-bridges) program.

(1): Job J1I3020B Route 29 ANDREW, HOLT County. Bridge painting over the Nodaway River, 0.8 mile south of Rte. 59 near Oregon, the total length of improvement being 0.173 miles.
(2): Job J1I3099B Route 29 HOLT County. Bridge painting over Rte. E and Kimsey Creek, near Mound City, the total length of improvement being 0.09 miles.
(3): Job J1P3023B Route 29 HOLT County. Bridge painting over Davis Creek, 0.2 mile south of Rte. 118 near Mound City, the total length of improvement being 0.04 miles.
(4): Job J1S3181 Route Various CLINTON, DAVIESS, SULLIVAN County. Bridge painting on various bridges in Daviess, Sullivan and Clinton Counties, the total length of improvement being 0.312 miles.

(1): Job J1P3252 Route 65 GRUNDY County. Bridge rehabilitation over Rte. 6 in Trenton, the total length of improvement being 0.077 miles.
(2): Job J1P3255 Route 36 LIVINGSTON County. Bridge rehabilitation over Blackwell Creek, 1.2 miles east of Rte. 65 near Chillicothe, the total length of improvement being 0.087 miles.

(1): Job J1P3254 Route 159 HOLT County. Bridge rehabilitation over Big Lake Overflow 1 mile west of Rte. 11, near Big Lake, the total length of improvement being 0.067 miles.
(2): Job J1S3251 Route 59 ANDREW County. Bridge rehabilitation over Route I-29 1.2 miles south of the Nodaway River near Fillmore, the total length of improvement being 0.06 miles.

(1): Job J1S3420 Route BB ATCHISON County. Resurface from B Avenue to Rte. A in Watson, the total length of improvement being 3.191 miles.
(2): Job J1S3421 Route TT ATCHISON County. Resurface from Rte. 59 to O Avenue near Fairfax, the total length of improvement being 1.492 miles.
(3): Job J1S3428B Route A ATCHISON County. Resurface from B Avenue to Rte. D near Watson, the total length of improvement being 2.513 miles.

(1): Job J1S3422 Route V CARROLL County. Resurface from Rte. 24 to end of state maintenance near DeWitt, the total length of improvement being 2.774 miles.
(2): Job J1S3423 Route O CARROLL County. Resurface from Rte. V to end of state maintenance near DeWitt, the total length of improvement being 1.655 miles.
(3): Job J1S3424 Route M CHARITON County. Resurface from Rte. 11 to Rte. F near Brunswick, the total length of improvement being 6.474 miles.

(1): Job J1S3425 Route JJ MERCER County. Bridge scour repair over Honey Creek 2.2 miles east of Rte. Y near Spickard, the total length of improvement being 0.022 miles.
(2): Job J1S3426 Route JJ MERCER County. Bridge scour repair over Honey Creek 0.5 mile east of Rte. Y near Spickard, the total length of improvement being 0.021 miles.
(3): Job J1S3427 Route E MERCER County. Bridge scour repair over Honey Creek 0.6 mile east of Rte. Y near Princeton, the total length of improvement being 0.02 miles.

Job J1S3428 Route A ATCHISON County. Resurface from Rte. D to I-29 near Watson, the total length of improvement being 1.107 miles.
Job J2P2215 Route 63 ADAIR County. Resurface and ADA improvements from Rte. 6 south junction (Illinois St.) to Patterson street in Kirksville, the total length of improvement being 0.819 miles.

(1): Job J2P2216 Route 63 MACON County. Resurface and ADA improvements from 0.4 mile south of Rte. DD to 0.6 mile south of Rte. YY and on BUS. 36 from 0.1 mile east of Maffry Ave. near Macon, the total length of improvement being 7.44 miles.
(2): Job J2S3339 Route 36 MACON County. Resurface from Rte. 63 to Rte. 36 in Macon, the total length of improvement being 2.641 miles.

Job J2P3283 Route 63 ADAIR, MACON County. Pavement improvements from 1.2 miles south of Rte. KK to 0.5 mile north of Rte. DD in Macon County near Macon, the total length of improvement being 20.905 miles.
Job J3P3062 Route 65 PETTIS County. Resurface from 0.4 mile south of Rte. 52 to Rte. B in Sedalia, the total length of improvement being 10.686 miles.

(1): Job J4I3291 Route 29 PLATTE County. Bridge replacement over 56th Street, 1.8 miles west of Rte. 169 near Riverside, the total length of improvement being 0.21 miles.
(2): Job J4I3297 Route 29 PLATTE County. Bridge replacement over Rte. AA, 0.8 mile west of Rte. 169 near Northmoor, the total length of improvement being 0.21 miles.


Job J4I3396 Route Various CASS, CLAY, JACKSON County. Sign replacement at various locations in the urban Kansas City District, the total length of improvement being 0 miles.
Job J4P3352 Route US 50 JACKSON County. Pavement improvements from 0.8 mile east of George Road to Rte. RA, the total length of improvement being 5.955 miles.

(1): Job J4P3373 Route 58 CASS County. Bridge replacement over Big Creek, 0.1 mile east of Hilltop Rd. and 0.2 mile west of Walnut Street, the total length of improvement being 0.093 miles.
(2): Job J4P3379 Route 291 CASS County. Bridge deck replacement at Middle Big Creek, 1.3 miles south of Rte. 150 and 0.6 mile north of 163rd Street in Lake Winnebago, the total length of improvement being 0.2652 miles.

Job J4S3375 Route PECULIAR DR CASS County. Bridge replacement over East Creek, 1 mile south of Main Street and 0.2 mile north of 195th Street, the total length of improvement being 0.161 miles.
Job J4S3389 Route 67th St JACKSON County. Bridge replacement at I-435 from Corrington Avenue and 0.1 mile west of Richmond Avenue, the total length of improvement being 0.116 miles.

(1): Job J5P3236 Route 68/HH DENT, PHELPS County. Resurface and shoulder improvements from Rte. 8 to Rte. 19 near Salem and Rte. HH from Rte. 32 to the end of state maintenance, the total length of improvement being 25.047 miles.
(2): Job J5S3277 Route F DENT County. Pavement improvements from Rte. 32 to Rte. E, the total length of improvement being 6.854 miles.
(3): Job J5S3393 Route K PHELPS County. Pavement Improvements from Rte. 63 to the end of state maintenance, the total length of improvement being 12.933 miles.

Job J5P3337 Route 54,63 CALLAWAY, COLE County. Bridge rehabilitation over the Missouri River, the total length of improvement being 1.178 miles.
Job J5P3399 Route 50,63 GASCONADE, MARIES County. Bridge rehabilitation on Rte. 63 and Rte. 50 over Gasconade River, the total length of improvement being 0.348 miles.
Job J5S3324 Route UU,JJ CALLAWAY County. Resurface and add rumblestripes from Rte. O to Rte. JJ and on Rte. JJ from I-70 to Rte. UU, the total length of improvement being 12.836 miles.
Job J5S3386 Route Various COLE County. Pavement and guardrail improvements from Lookout Trail in Centertown to Rte. C, Rte. Y from Rte. M in Taos to Big Meadows Rd. and Rte. W from Rte. B in Wardsville to end of state maintenance, the total length of improvement being 19.307 miles.
Job J6I3498 Route Various JEFFERSON, ST CHARLES, ST LOUIS, ST LOUIS CITY County. Sign installation at various ramp locations in St. Charles, St. Louis, St. Louis City, and Jefferson Counties, the total length of improvement being 71.95 miles.
Job J6P3325 Route 370 ST CHARLES, ST LOUIS County. Pavement and guardrail improvements from Elm in St. Charles County to the I-270 interchange in St. Louis County, the total length of improvement being 5.555 miles.
Job J6P3477 Route Various FRANKLIN, ST CHARLES, ST LOUIS, ST LOUIS CITY County. High friction surface treatment on curves at various locations around the St. Louis District, the total length of improvement being 0.912 miles.
Job J6S3575B Route W,FF JEFFERSON County. Seal coat on Rte. W from Rte. 109 to Rte. 30 and on Rte. FF from Rte. F to Rte. 109, the total length of improvement being 9.8 miles.
Job J6P3446 Route Various VARIOUS County. Job order contract for bridge repairs at various major route locations in the St. Louis District, the total length of improvement being 0 miles.

(1): Job J7I3254 Route I-49 JASPER County. Bridge rehabilitation over the Missouri and Northern Arkansas Railroad and over Opossum Creek near Jasper, the total length of improvement being 0.231 miles.
(2): Job J7I3256 Route I-49 JASPER County. Bridge Rehabilitation on northbound bridge over Coon Creek near Jasper, the total length of improvement being 0.201 miles.

Job J7P3107B Route 266 LAWRENCE County. Bridge replacement over Billies Creek 0.1 mile west of Halltown, the total length of improvement being 0.164 miles.
Job J7P3190C Route FF VERNON County. Bridge deck replacement over Drywood Creek 2.2 miles west of Rte. F, the total length of improvement being 0.1374 miles.

(1): Job J7P3190D Route B BATES County. Bridge deck replacement over Camp Branch 1.5 miles west of Rte. P and Panther Creek 1.3 miles west of Rte. P, the total length of improvement being 0.738 miles.
(2): Job J7S3261 Route M BATES County. Bridge deck replacement over the Osage River, the total length of improvement being 0.335 miles.

(3): Job J7S3481 Route M BATES County. Culvert replacement from 0.5 mile north of the Osage River, the total length of improvement being 0.022 miles.

Job J7P3417 Route Various BATES, BENTON, DALLAS, HENRY, HICKORY, PETTIS, POLK County. Seal coat on various minor routes in Benton, Dallas, Polk, Hickory, Henry, Bates, and Pettis counties, the total length of improvement being 101.779 miles.
Job J9P3169 Route 160 OZARK County. Pavement and guardrail improvements from 0.9 miles east of County Road 530 to 0.3 miles west of North Fork River, the total length of improvement being 1.1 miles.
Job J9P3558 Route 17 HOWELL, TEXAS County. Shoulder improvements from Rte. 106 to Rte. 60, the total length of improvement being 9.951 miles.
Job J9P3628 Route Various VARIOUS County. Job order contract for erosion control at various locations in the Southeast District, the total length of improvement being 0 miles.

(1): Job J9P3709 Route 51 BOLLINGER County. Scrub seal from Rte. 72 to Rte. 34 in Marble Hill, the total length of improvement being 17.697 miles.
(2): Job J9P3711 Route 95 OZARK County. Scrub seal from Rte. 5 to Rte. 160 near Theodosia, the total length of improvement being 20.504 miles.
(3): Job J9S3708 Route Y ST FRANCOIS, STE GENEVIEVE County. Scrub seal from Rte. 67 to I-55 near Bloomsdale, the total length of improvement being 17.933 miles.
(4): Job J9S3710 Route K HOWELL County. Scrub seal from Rte. KK to Rte. 63 in West Plains, the total length of improvement being 10.5 miles.
(5): Job J9S3712 Route E STODDARD County. Scrub seal from Rte. 25 in Bloomfield to Rte. N, the total length of improvement being 6.785 miles.
(6): Job J9S3713 Route H NEW MADRID County. Scrub seal from end of state maintenance to Rte. 61 in Matthews, the total length of improvement being 6.652 miles.

Job J9S3340 Route J BOLLINGER, MADISON, PERRY County. Pavement and shoulder improvements from Rte. 72 to Rte. 51, the total length of improvement being 17.828 miles.
Job J9S3556 Route M BUTLER County. Shoulder improvements from County Road 462 to County Road 441, the total length of improvement being 7.625 miles.
Job J9S3732 Route 60 MISSISSIPPI County. High friction surface treatment on various curves from Rte. EE near Charleston to end of state maintenance, the total length of improvement being 1.38 miles.

EDIT: Additional lettings added
Job J0I3006G Route Various VARIOUS County. Job order contract for concrete pavement repair at various interstate locations in the urban Kansas City District, the total length of improvement being . miles.
Job J7I3362 Route I-49 BARTON County. Bridge replacement over North Fork Spring River 4.5 miles south of Rte. 160 to 2.0 miles north of Rte. 126 south of Lamar, the total length of improvement being 0.425 miles.
Job J4S3380 Route Baltimore Ave JACKSON County. Bridge replacement over I-670, 0.1 mile south of 14th Street and 0.1 mile west of Richmond Avenue, the total length of improvement being 0.043 miles.
Title: Re: MODOT Contract Lettings
Post by: mvak36 on January 13, 2021, 01:24:00 PM
The winning bids for the December letting (https://www.aaroads.com/forum/index.php?topic=19531.msg2547116#msg2547116) were awarded at the MHTC meeting on 1/6/21.
Title: Re: MODOT Contract Lettings
Post by: mvak36 on January 15, 2021, 11:25:33 AM
February 19, 2021 Letting:

Projects listed in blue font are part of Missouri Focus on Bridges (https://www.modot.org/focus-bridges) program.

Job J1I3110 Route I-29 ATCHISON County. Bridge rehabilitation over the Nishnabotna River, 1 mile south of the Iowa State line, the total length of improvement being 0.889 miles.
Job J1P3287 Route Various CHARITON, LIVINGSTON County. ADA improvements in Chillicothe, Rte. 5 in Keytesville and Rte. 129 in Salisbury, the total length of improvement being 0.398 miles.

(1): Job J2S0413 Route 11 ADAIR County. Bridge replacement over Steer Creek 4.7 miles east of Rte. 63 near Kirksville, the total length of improvement being 0.103 miles.
(2): Job J2S0416 Route 149 ADAIR County. Bridge replacement over Shuteye Creek 3 miles south of Rte. D near Connelsville, the total length of improvement being 0.098 miles.


(1): Job J2S3005 Route M LINCOLN County. Bridge replacement over King's Lake 1.9 miles east of Rte. 79 near Elsberry, the total length of improvement being 0.097 miles.
(2): Job J2S3330 Route CC LINCOLN County. Bridge replacement over Bryant's Creek 3.6 Miles West of Rte. 79 near Elsberry, the total length of improvement being 0.114 miles.

Job J3M0255 Route 70 SALINE County. Pavement improvements at Rte. 65 interchange, the total length of improvement being 0.135 miles.
Job J3S3127 Route YY SALINE County. Bridge replacement over I-70 3.6 miles west of Rte. 65 and 3.2 miles east of Rte. K, the total length of improvement being 0.127 miles.
Job J4P3268B Route 169 CLAY County. ADA improvements from south of Commercial Avenue to Rte. 92, the total length of improvement being 0.691 miles.
Job J4S3282 Route Hickman Mills JACKSON County. Pavement improvements from Bannister Road to Blue River Road, the total length of improvement being 1.248 miles.

(1): Job J5I3365 Route I-70 CALLAWAY County. Bridge rehabilitation over Auxvasse Creek east of Kingdom City, the total length of improvement being 0.36 miles.
(2): Job J5I3366 Route I-70 BOONE County. Bridge rehabilitation over Perche Creek, the total length of improvement being 1.162 miles.


Job J5P3270 Route 54 CAMDEN County. Bridge rehabilitation over the Grand Glaize Arm of the Lake of the Ozarks near Osage Beach, the total length of improvement being 0.679 miles.
Job J5P3387 Route 19,100 GASCONADE County. Pavement improvements from Missouri River bridge to 0.1 mile south of Rte. H and on Rte. 100 from Rte. 19 to 0.3 mile east of Reserve Street, the total length of improvement being 1.865 miles.

(1): Job J5S3342 Route T,V GASCONADE County. Seal coat and guardrail improvements on Rte. T from Rte. 50 in Rosebud to end of state maintenance and on Rte. V from Rte. 19 to Rte. T, the total length of improvement being 17.317 miles.
(2): Job J5S3351 Route A,Y GASCONADE County. Seal coat on Rte. A from Rte. 28 in Bland to Rte. 50 in Mt. Sterling and on Rte. Y from Rte. A to Rte. 28 in Owensville, the total length of improvement being 21.664 miles.

Job J6S3292 Route A JEFFERSON County. Resurface and guardrail improvements from Old Highway 21 to East of Collins Drive, the total length of improvement being 8.82 miles.
Job J6S3392 Route AJ FRANKLIN County. Resurface from Rte. YY to Rte. 50, the total length of improvement being 6.095 miles.
Job J6S3495 Route 364 ST LOUIS County. Bridge rehabilitation from Seven Pines Drive to Bennington Place, the total length of improvement being 1.104 miles.
Job J6P3543 Route Various FRANKLIN County. Seal coat from Rte. 50 to Rte. AC, on Rte. AT from Rte. 50 to Rte. M, and on Rte. H from Rte. 50 to Rte. AC, the total length of improvement being 21.665 miles.
Job J6S3591 Route Various FRANKLIN County. Seal coat from Rte. 50 to Rte. AC, Rte. AC from Rte. H to Rte. 185, and Rte. AN from Rte. H to Shawnee Ford Road, the total length of improvement being 14.317 miles.
Job J7P3107H Route 83/H BENTON County. Bridge rehabilitation over Rte. 65 0.3 mile south of Warsaw and on Rte. H over Cole Camp Creek 8 miles east of Lincoln, the total length of improvement being 0.12 miles.
Job J7P3190I Route 265 STONE County. Bridge replacement on private drive over Pine Run Creek 0.1 mile south of Rte. AA, the total length of improvement being 0.012 miles.

(1): Job J7P3262 Route 171 JASPER County. Resurface and intersection improvements from Kansas state line to 0.6 mile west of Rte. 43, the total length of improvement being 14.266 miles.
(2): Job J7P3263 Route 171 JASPER County. Resurface from 0.6 mile west of Fir Road in Airport Drive to east of Centennial Avenue in Webb City, the total length of improvement being 7.679 miles.
(3): Job J7P3268 Route 171 JASPER County. Resurface from east of Centennial Avenue in Webb City to I-49 in Carthage, the total length of improvement being 15.189 miles.
(4): Job J7S3189J Route O JASPER County. Resurface and add shoulders at various locations from Rte. D in Alba to Rte. 96, the total length of improvement being 2.685 miles.

(1): Job J7P3283 Route 171 JASPER County. ADA improvements at various locations from the Frisco Greenway Trail to Main Street in Webb City, the total length of improvement being 0.823 miles.
(2): Job J7S3250 Route O JASPER County. ADA improvements at various locations from Maple Street to Walnut Street in Alba, the total length of improvement being 0.028 miles.

(1): Job J7P3299 Route Various BENTON, CEDAR, DADE, HENRY, ST CLAIR County. Bridge rehabilitation at various locations in various counties in the Southwest District, the total length of improvement being 3.11 miles.
(2): Job J7P3360 Route 7 BENTON County. Bridge rehabilitation over Truman Lake, the total length of improvement being 0.4 miles.
(3): Job J7S3359 Route 64 HICKORY County. Bridge rehabilitation over Lake Pomme de Terre, the total length of improvement being 0.327 miles.

(1): Job J8I3147 Route I-44 GREENE County. Pavement improvements at Rte. 744 (Mulroy Road) interchange in Springfield, the total length of improvement being 1.942 miles.
(2): Job J8S3151 Route 744 GREENE County. Bridge rehabilitation on Mulroy Road over I-44, the total length of improvement being 0.48 miles.
(3): Job J8S3155 Route 44 GREENE County. Pavement improvements from I-44 to east of Broadview Place in Springfield, the total length of improvement being 0.224 miles.

Job J8P2391 Route 13 STONE County. Signal improvements at Kissee Avenue in Kimberling City, the total length of improvement being 0.2 miles.
Job J9S3620 Route 60 STODDARD County. ADA improvements at various locations in Bertrand, East Prairie, Charleston, Dexter, Malden, and Catron, the total length of improvement being 3.72 miles.

EDIT: Additional Lettings Added
(1): Job J4P3275 Route 92 PLATTE County. Intersection improvements at intersection of Rte. 45 Spur, the total length of improvement being 0.329 miles.
(2): Job J4S3278 Route 45 PLATTE County. Resurface from Route 92 to Route 45, the total length of improvement being 2.153 miles.

Job J5P3195 Route 63 BOONE County. Intersection improvements from Rte. Y and Rte. M to Rte. H, the total length of improvement being 2.255 miles.
Job J9S3383 Route A WAYNE County. Bridge replacement over Small Creek, the total length of improvement being 0.032 miles.
Job J9M0281 Route 60,67 VARIOUS County. Striping upgrades on Rte. 60 and Rte. 67, the total length of improvement being 0 miles.

Title: Re: MODOT Contract Lettings
Post by: mvak36 on February 03, 2021, 07:44:06 PM
https://fox4kc.com/news/modot-selects-contractor-to-replace-buck-oneil-bridge/
Quote
LEE’S SUMMIT, Mo. – The Missouri Highways and Transportation Commission announced Wednesday that it has selected Massman-Clarkson, A Joint Venture, as the design-build contractor to replace the Buck O’Neil Bridge, formally known as the Broadway Bridge.

Construction is anticipated to begin in fall of 2021 and be fully complete by late fall of 2024.

....

The new bridge will cost close to $220 million to construct and will provide a safe, connective and accessible transportation facility that improves regional and local system performance.

The “Buck” O’Neil Memorial Bridge is a triple arch bridge carrying U.S. Route 169 over the Missouri River, and serves as a key regional connection between downtown Kansas City and communities north of the river. MoDot said the bridge is safe but nearing the end of its projected service life.

Opened in 1956, the bridge is nearly 65 years old. Close to 50,000 vehicles use the bridge daily.

Title: Re: MODOT Contract Lettings
Post by: mvak36 on February 08, 2021, 09:43:39 AM
The winning bids for the January letting (https://www.aaroads.com/forum/index.php?topic=19531.msg2555856#msg2555856) were awarded at the MHTC meeting on 2/3/21.
Title: Re: MODOT Contract Lettings
Post by: mvak36 on February 13, 2021, 11:33:36 PM
March 19, 2021 Letting:

Projects listed in blue font are part of Missouri Focus on Bridges (https://www.modot.org/focus-bridges) program.

Job J0I3007B Route I-29 ANDREW, ATCHISON, BUCHANAN, HOLT County. Job order contract for pavement repair from the Iowa State Line to Buchanan/Platte County line, the total length of improvement being . miles.
Job J0I3007D Route I-35 CALDWELL, CLINTON, DAVIESS, DEKALB, HARRISON County. Job order contract for pavement repair from the Iowa State Line to Clinton/Clay county line, the total length of improvement being . miles.

(1): Job J2P3089 Route 15 SCOTLAND County. Bridge replacement over South Wyaconda River 0.1 mile south of Rte. BB near Memphis, the total length of improvement being 0.161 miles.
(2): Job J3P0568 Route 15 SCOTLAND County. Bridge replacement over Foreman/Gunns Branch 0.4 mile north of Rte. AA near Memphis, the total length of improvement being 0.114 miles.

(1): Job J2S3148 Route C LEWIS County. Bridge replacement over Durgens Creek 1 mile west of Rte. P near LaGrange, the total length of improvement being 0.114 miles.
(2): Job J3S2202 Route K LEWIS County. Bridge replacement over Middle Fabius River 1.9 Miles South of Rte. Y near Labelle, the total length of improvement being 0.123 miles.


Job J2S3359 Route 2nd Street LINCOLN County. Bridge removal over Cuivre River in Moscow Mills, the total length of improvement being 0.1 miles.

(1): Job J3S3105 Route V LAFAYETTE County. ADA improvements in Corder from Liess Street to 22nd Street, the total length of improvement being 0.52 miles.
(2): Job J3S3146 Route V LAFAYETTE County. Pavement resurfacing from Rte. 20 in Corder to Rte. AA, the total length of improvement being 2 miles.
(3): Job J3S3157 Route W LAFAYETTE County. Pavement resurfacing from Rte. 20 to Lincoln Ave. in Alma, the total length of improvement being 0.77 miles.

(1): Job J4I3436 Route I-435 CLAY County. Drainage and pavement improvements from Rte. 69 to 48th Street, the total length of improvement being 0.017 miles.
(2): Job J4S3386 Route 53rd Ter CLAY County. Bridge replacement over I-435, 0.8 miles south of Rte. 69 and 0.7 miles north of 48th Street, the total length of improvement being 0.189 miles.

Job J4S3286 Route J CASS County. Bridge deck replacement over Young Branch, 0.1 mile south of 217th Street and 0.4 mile northeast of Branic Drive in Peculiar, the total length of improvement being 0.101 miles.
Job J4S3298 Route 7 JACKSON County. ADA improvments from Shaw Parkway to Pink Hill Road, the total length of improvement being 0.751 miles.
Job J4S3326 Route 7 CASS, JACKSON County. Intersection improvements at Stringtown Rd. and 155th Street (County Line Road), the total length of improvement being 0.491 miles.
Job J4S3338 Route 350 JACKSON County. Intersection improvements on MO 350 at Gregory Boulevard, the total length of improvement being 0.14 miles.
Job J4S3477 Route 152 CLAY, PLATTE County. Interchange improvements at Platte Purchase interchange, the total length of improvement being 0.254 miles. Will be let in a future letting.
Job J4M0259B Route 70 JACKSON County. Mowing, landscaping, and litter pick-up from Paseo Blvd. to west of I-470 interchange, the total length of improvement being 12.205 miles.
Job J5I3324 Route I-44 LACLEDE County. Bridge rehabilitation over Gasconade Overflow, the total length of improvement being 0.072 miles.
Job J0I3007K Route Various VARIOUS County. Job order contract for concrete pavement repair at various Interstate locations in the St. Louis District, the total length of improvement being 0 miles.
Job J6M0284 Route I-270 ST LOUIS County. Bridge rehabilitation over I-44, the total length of improvement being 0.017 miles.
Job J6M3410 Route AH FRANKLIN County. Bridge rehabilitation over I-44, the total length of improvement being 0.076 miles.
Job J6P2421B Route Various FRANKLIN, JEFFERSON, ST CHARLES, ST LOUIS, ST LOUIS CITY County. Job order contract for concrete pavement improvements at various major route locations in the St. Louis District, the total length of improvement being 0 miles.

(1): Job J6Q3469 Route Various ST CHARLES, ST LOUIS, ST LOUIS CITY County. ITS improvements at various locations within the St. Louis District, the total length of improvement being 0 miles.
(2): Job J6Q3473 Route Various FRANKLIN, JEFFERSON, ST CHARLES, ST LOUIS, ST LOUIS CITY County. ITS improvements at various locations throughout the St. Louis District, the total length of improvement being 0 miles.

Job J6S3408 Route OR 70 ST CHARLES County. Intersection improvements at the intersection of Lake St. Louis, Veterans Memorial Parkway, and I-70 eastbound ramps, the total length of improvement being 0.625 miles.
Job J7P3190F Route EE MCDONALD County. Bridge replacement over Indian Creek 0.4 mile south of Lanagan, the total length of improvement being 0.186 miles.
Job J7P3464 Route 7 BENTON, HENRY County. Resurface from east of Rte. PP at Tightwad to Rte. 65 at Warsaw, the total length of improvement being 14.357 miles.
Job J8P3129 Route 60,413 GREENE County. ADA improvements at various locations from 0.3 mile west of Illinois St. to Rte. 174 in Republic and various locations on Sunshine St. from Scenic Ave. to Kansas Expressway in Springfield, the total length of improvement being 1.75 miles.
Job J9P3458 Route 160 HOWELL, OZARK County. Resurface and add rumblestripes from Rte. 5 to Rte. 101, the total length of improvement being 22.212 miles.
Job J9P3632 Route Various VARIOUS County. Job order contract for asphalt pavement repair on all major highways except interstates in the Southeast District, the total length of improvement being 0 miles.
Job J9S3213 Route C MADISON County. Bridge replacement over St. Francis River, the total length of improvement being 0.321 miles.
Job J9S3638 Route Various VARIOUS County. Job order contract for ADA improvements at various locations in the Southeast District, the total length of improvement being 0 miles.

EDIT: Additional letting added
Job J5S3265 Route C CRAWFORD County. Bridge replacement over Little Bourbeuse River, the total length of improvement being 0.104 miles.