Regional Boards => Central States => Topic started by: Interstate1956 on January 04, 2018, 11:38:25 AM

Title: NE-2
Post by: Interstate1956 on January 04, 2018, 11:38:25 AM
Christmas came a bit early on December 13 when the NE-2/US 75 interchange was opened to traffic. NDOT did a great job with  raising the overpass substantially in order to have a flat highway design. As a citizen of Lincoln, one can only hope that the South & West Beltways can be built sooner than later that would eliminate 15 traffic signals!
Title: Re: NE-2
Post by: kphoger on January 04, 2018, 01:33:47 PM
I utilized that interchange while it was still under construction, back in October.  I didn't realize it was being grade-separated until I was planning my trip and Google refused to route me that way (because the eastbound roadway was closed so Google thought you couldn't go east from there).  I agree that it looked good.
Title: Re: NE-2
Post by: skluth on January 04, 2018, 01:42:08 PM
The South Beltway around Lincoln should be built within 10 years. South Beltway site: http://dot.nebraska.gov/lincoln-south-beltway/

I imagine the West Beltway along US 77 will be upgraded once the South Beltway starts being built. There is no current timetable. West Beltway site: http://dot.nebraska.gov/projects/bna/first10/fy-2020-2023/lincoln-west-beltway/
Title: Re: NE-2
Post by: bugo on January 11, 2018, 12:53:44 AM
Has NE 2 east of Lincoln been repaved in the last 15 years or so? I drove through there in 2001 or 2002 and the road was in horrible shape. It was a concrete highway and you could feel each expansion joint in the road.
Title: Re: NE-2
Post by: Revive 755 on January 12, 2018, 09:24:11 PM
^ I think it had a dowel bar retrofit and diamond grinding done, but not a full resurfacing.
Title: Re: NE-2
Post by: SD Mapman on January 15, 2018, 10:32:58 AM
Quote from: bugo on January 11, 2018, 12:53:44 AM
Has NE 2 east of Lincoln been repaved in the last 15 years or so? I drove through there in 2001 or 2002 and the road was in horrible shape. It was a concrete highway and you could feel each expansion joint in the road.
Parts of it have (I think), but there's still very washboardy sections as per Saturday...
Title: Re: NE-2
Post by: roadman65 on March 22, 2018, 09:07:28 PM
NE-2 Lol!  Interesting thread considering that one user here uses that name to call himself.
Title: Re: NE-2
Post by: theroadwayone on April 01, 2018, 04:52:37 PM
Quote from: roadman65 on March 22, 2018, 09:07:28 PM
NE-2 Lol!  Interesting thread considering that one user here uses that name to call himself.
Damn right.