Remember- the function of these offices is maintenance - not construction. That is to say AHTD does not construct the projects and the presence of the district office would not make any project happen faster. We do have a construction engineer in each district who oversees the REs and the inspectors to ensure construction is completed as it should be.
I'm very aware of the function of the maintenance offices... My comment wasn't about construction at all.
District 9 needs to look at signage in NWA. I think there's a thread about the AR 12 routing.
If you can pass this along to District 9:
http://goo.gl/maps/6p9H3 I pass by this sign a lot in the dark... It's not readable at all. Same with other state road signs along Monroe.
http://goo.gl/maps/ZuaVxI noticed that Washington County did a refresh of signs recently along US 71B.
Benton County wasn't among that.
And there are no mileage distance signs on US 71/I-540 between the very south side of Fayetteville and the MO/AR state line... 40 miles.
Example:
http://goo.gl/maps/0u48sThis needs to be on the rebuild on I-540/Future I-49 in NWA:
http://goo.gl/maps/JkLHu