News:

The server restarts at 2 AM and 6 PM Eastern Time daily. This results in a short period of downtime, so if you get a 502 error at those times, that is why.
- Alex

Main Menu

I-40 in Memphis/West Memphis prior to 1973

Started by bugo, May 04, 2015, 03:02:57 PM

Previous topic - Next topic

bugo

The I-40 Mississippi River bridge wasn't built until 1973. Was I-40 signed along I-55 before the bridge was built? Was the 40/55 overlap dual signed or did I-40 "end" at I-55?