News:

The server restarts at 2 AM and 6 PM Eastern Time daily. This results in a short period of downtime, so if you get a 502 error at those times, that is why.
- Alex

Main Menu

Diverging Diamond Mulitplication

Started by Brandon, July 16, 2010, 02:21:35 PM

Previous topic - Next topic

Brandon

IDOT, ISTHA, and the City of Naperville are planning to replace the IL-59/I-88 interchange (currently a diamond) with a diverging diamond.
http://www.naperville.il.us/route59expansion.aspx
http://triblocal.com/Naperville/detail/196853.html

QuoteThe design phase of the project is expected to be approved this summer. Phase II, contract plan preparation and land acquisition, is about 18 to 24 months away. Construction of the road may not be completed until 2016.

It is a pretty nasty stretch of IL-59, from Fox Valley SC north to I-88.  Really unbearbale during rush hour.
"If you think this has a happy ending, you haven't been paying attention." - Ramsay Bolton, "Game of Thrones"

"Symbolic of his struggle against reality." - Reg, "Monty Python's Life of Brian"


wh15395

INDOT is also planning a diverging diamond interchange for I-69 and Dupont Road in Fort Wayne. It would be the first one in Indiana.
http://www.wane.com/dpp/news/local/new-i-69-ramps-planned-for-union-chapel

mukade