News:

Check out the AARoads Wiki!

Main Menu

Interstate 81 in Syracuse

Started by The Ghostbuster, May 25, 2016, 03:37:19 PM

Previous topic - Next topic

Rothman

Quote from: vdeane on October 12, 2025, 10:37:29 PMI discovered an interesting situation with the I-81 project when I was checking a few things out yesterday.  On future BL 81, the SB ramp to Glen St is open - but not signed.  Meanwhile, a sign for the N Clinton St exit is up... even though it doesn't look like it will be opening in the near term.  In other interesting news, the signs for SB exit 96 all have temporary patches for "NY 481 south".

Yep...just drove past it again today.  Very frustrating.  I should find out more about the situation this week on the lack of signage.
Please note: All comments here represent my own personal opinion and do not reflect the official position(s) of NYSDOT.


vdeane

#1801
I took a look, and the plans for contract 6 are up!  Signage and the staging for each "phase" of work begin on part 3 of 4 of the RFP plans (part 6 of the final RFP).  Looks like West Street will be exit 15A in both directions, even though there won't be an exit 15B eastbound.  Also of interest is that I-690 EB will be closed through most of this work.

Quote from: Rothman on October 12, 2025, 11:19:28 PM
Quote from: vdeane on October 12, 2025, 10:37:29 PMI discovered an interesting situation with the I-81 project when I was checking a few things out yesterday.  On future BL 81, the SB ramp to Glen St is open - but not signed.  Meanwhile, a sign for the N Clinton St exit is up... even though it doesn't look like it will be opening in the near term.  In other interesting news, the signs for SB exit 96 all have temporary patches for "NY 481 south".

Yep...just drove past it again today.  Very frustrating.  I should find out more about the situation this week on the lack of signage.
I think I saw a sign near the ground there, so hopefully soon.  Still, it would have been nice if it was there when I was out getting pictures!
Please note: All comments here represent my own personal opinion and do not reflect the official position of NYSDOT or its affiliates.

Rothman

I think someone mentioned the uncovered BL-81 shield?  Anyway, saw it this past weekend on a sign assembly at the northern interchange between I-81 and I-481 on I-481 NB after taking the I-81 NB to I-/NY 481 NB ramp.

I think I've also heard the shield will be covered again soon...

(personal opinion emphasized)
Please note: All comments here represent my own personal opinion and do not reflect the official position(s) of NYSDOT.

The Ghostbuster

Given the mess that both the under-reconstruction roadway and a mixture of signage with old exit numbers and new ones, it's a wonder anyone can make their way through the Syracuse area. Even using Google Maps Street View through Syracuse is a chore. The reconstruction and exit renumbering project will be worth it, and once it is finished, there shouldn't be any more confusion, but until then, it will be a colossal mess.

vdeane

Quote from: Rothman on October 27, 2025, 04:49:41 PMI think someone mentioned the uncovered BL-81 shield?  Anyway, saw it this past weekend on a sign assembly at the northern interchange between I-81 and I-481 on I-481 NB after taking the I-81 NB to I-/NY 481 NB ramp.

I think I've also heard the shield will be covered again soon...

(personal opinion emphasized)
Is there a point to having it covered, given that the exit in question is currently closed?  Will the ramp even be open before the designation swap happens?  I noticed that exit 1A of BL 81 isn't bothering with this.
Please note: All comments here represent my own personal opinion and do not reflect the official position of NYSDOT or its affiliates.

Rothman

Quote from: vdeane on October 27, 2025, 08:46:54 PM
Quote from: Rothman on October 27, 2025, 04:49:41 PMI think someone mentioned the uncovered BL-81 shield?  Anyway, saw it this past weekend on a sign assembly at the northern interchange between I-81 and I-481 on I-481 NB after taking the I-81 NB to I-/NY 481 NB ramp.

I think I've also heard the shield will be covered again soon...

(personal opinion emphasized)
Is there a point to having it covered, given that the exit in question is currently closed?  Will the ramp even be open before the designation swap happens?  I noticed that exit 1A of BL 81 isn't bothering with this.

Just compliance with FHWA's wishes, I believe.

It is my understanding that both the northern and southern interchanges are scheduled to be fully operational by the end of the year...with more outstanding finish-up work at the southern interchange than the northern.  CSX bridge won't be done until next fall.

That all said, there's a lot of work to be done still at the southern interchange in my opinion...and it's almost November...

(personal opinion emphasized)
Please note: All comments here represent my own personal opinion and do not reflect the official position(s) of NYSDOT.