Proposed FY 2014-2019 Transportation Improvement Program for IL

Started by Revive 755, September 20, 2013, 09:04:51 PM

Previous topic - Next topic

Revive 755

http://www.dot.state.il.us/opp/hip1419/html/maintoc.htm

* It appears that may be some sort of widening in the works for I-72 between IL 4 and the MacArthur extension on the south side of Springfield, but only funded for plan development.

* Some possible progress for the US 67 expressway in Jersey County after 2014.

* Still acquiring land for the Gateway Connector.

* Three more miles of expressway for US 45 near Eldorado


Joe The Dragon

CUMBERLAND FLYOVER
I-190 added lanes

I 90  I-190 TO ILL 43 added lanes are needed.

Any one have the I-190 planes? also the US 12 / 45 work (on going now) seems to be tied to that.

Revive 755

Quote from: Joe The Dragon on September 20, 2013, 11:47:19 PM
Any one have the I-190 planes? also the US 12 / 45 work (on going now) seems to be tied to that.

The last page of the of this study for O'Hare shows what I think is still proposed for I-190 at US 12/US 45:
http://www.faa.gov/airports/airport_development/omp/planning/MP/OAMP/Media/Section_V4-Alternatives-04.pdf

I believe the I-190 interchange with River Road was also have the SB to EB entrance loop replaced with a jughandle type turn.

Joe The Dragon


Revive 755

Quote from: Joe The Dragon on September 22, 2013, 06:54:51 PM
the river road part is not in the airport plans

That part's from memory of a display I saw several months ago - I haven't found an online map for the project.  Given the rumors that the 'Cumberland Flyover' may be changed to a much simpler C-D roadway, IDOT may be tinkering with the design for I-190 at River Road.

ET21

Quote from: Joe The Dragon on September 20, 2013, 11:47:19 PM
CUMBERLAND FLYOVER
I-190 added lanes

I 90  I-190 TO ILL 43 added lanes are needed.

Any one have the I-190 planes? also the US 12 / 45 work (on going now) seems to be tied to that.

Not only that, but the work is also due to the intersection redo of IL-19 at US 12/45, partly in preparation for the Elgin-O'Hare bypass
The local weatherman, trust me I can be 99.9% right!
"Show where you're going, without forgetting where you're from"

Clinched:
IL: I-88, I-180, I-190, I-290, I-294, I-355, IL-390
IN: I-80, I-94
SD: I-190
WI: I-90
MI: I-94, I-196
MN: I-90

ChiMilNet

Bumping this thread. I'm surprised no mention was made on here of the Circle Interchange reconstruction. This is obviously a big one upcoming. While it will be a huge mess and seems to be causing much controversy, it's much needed IMO.



Opinions expressed here on belong solely to the poster and do not represent or reflect the opinions or beliefs of AARoads, its creators and/or associates.