Big problem: US 93 is completely closed from I-40 to SR 71. One wreck just south of I-40, and another on the two-lane section northwest of Wickenburg.
The only ways to get between Phoenix and Las Vegas today are I-17 or SR 89 north to I-40 west, or I-10 west (or US 60 west to I-10, if already in or near Wickenburg) to US 95 north.
Or via Southwest!
Seriously, the 4-laning of this corridor can't come soon enough, with or without I-11!
This seems to be acknowledged in the latest 5 year plan but omits the Cane Springs widening and any widening work between SR 89 and SR 71. The Tegner to SR89 Gap project remains intact but is almost completed paid by Maricopa County, isn't it? At least the Kingman interchange is there.
From the list:
Kabba Wash Bridge
Project Limits US 93 Bridge 492 milepost 97.5 to 98.5 (1 mile)
Description Design/Construct Bridge Rehabilitation
$4M
Project Name Sycamore Creek Bridge NB, Gray Wash Bridge
Route US 93
Project Limits US 93 Bridge 640 milepost 127.63 to 128.63 (1 mile), US 93 Bridge 641 milepost 128.63 to 129.63 (1 mile)
Bridge Rehabilitation
$1.1M
Project Name S of Nothing - S of Jct SR-97
Route US 93
Project Limits US 93 from S of Nothing to Jct SR-97 milepost 144 to 156 (12 mile)
Description Pavement Rehabilitation
$27 million
Project Name MP 160-180.6, Wickieup
Route US 93
Project Limits US 93 milepost 160 to 180.6 (20.6 mile)
Description Center line rumble strips
$361K
Project Name Tegner St - Wickenburg Ranch Way
Route US 93
Project Limits US 93 from Tenger Street to SR-89 milepost 193 to 198 (5 mile)
Description US93: Tegner Street - SR89 "The Gap": Construct Divided Highway Local ID: DOT18-707 & DOT20-724
$54,981,000
Project Name US-93/I-40 West Kingman TI
Route I 40
Project LimitsInterchange on I 40 at I-40 West Kingman and US-93
Description Right of Way, Design, and Construct TI
$84 million
https://www.abc15.com/traffic/deadly-gamble-update-adot-to-make-us-93-safety-improvementshttps://azdot.gov/sites/default/files/media/2021/03/2022-2026-tentative-5yr-plan.pdf