formulanone

Quote from: freebrickproductions on March 21, 2025, 10:35:21 PMNow we've just got to wait for the widening between Exits 7 and 9 to be finished.

The construction highlights one of my first-world pet peeves: temporarily moving the lane over just exactly enough that one of your wheel tracks can't keep steady because the lanes are uneven, due to milling away the road surface where the stripes had been located.


Avalanchez71

Quote from: freebrickproductions on May 10, 2018, 11:46:25 PMhttps://www.al.com/news/huntsville/index.ssf/2018/05/i-565_widening_project_on_fast.html
Quote from: AL.comI-565 widening project on 'fast track,' ALDOT says

The Alabama Department of Transportation on Thursday said that widening I-565 in Huntsville is a "high priority project for us," echoing comments Gov. Kay Ivey made Wednesday.

Planning documents on the ALDOT website indicating that the I-565 project won't see new construction until 2043 are "outdated," spokesman Tony Harris said in an interview with AL.com. He also said work on the highway is "fast tracking."

"We have consultants actively engaged, working on that project right now," Harris said.

Harris, however, said he could not put an estimated date on when construction might begin on what's been described as a $100 million project.

The perspective from ALDOT came a day after the issue of widening I-565 became a political flashpoint at a ribbon cutting for GE Aviation in Huntsville.

At the end of his brief remarks at the ribbon cutting, Huntsville Mayor Tommy Battle - challenging Ivey for the Republican gubernatorial nomination on June 5 - called out to state Sen. Arthur Orr seated in the audience about the need to expand I-565.

Orr, whose district includes the critical area of I-565 that officials agree needs widening, is also a member of the state General Fund committee and considered one of the most influential lawmakers in Montgomery.

After Battle concluded his speech, Ivey returned to the podium unprompted to reiterate her statement made during a speech in Huntsville last month that the interstate spur from I-65 into Huntsville is a "high priority" for her.

According to Harris, I-565 is getting attention.

"I know that work is now physically underway and is the first step to having plans that we can begin building from," he said.

But projects such as widening the federal highway are tedious exercises, Harris said. While it's basically stipulated that I-565 needs additional lanes to accommodate what's already a traffic bottleneck before the Mazda Toyota Manufacturing USA facility brings about 10,000 direct and indirect jobs to the area, there is more to be done than simply adding lanes, Harris said.

While I-565 expands to five lanes of traffic both east and westbound as it approaches downtown Huntsville, the highway shrinks to two lanes in each direction between Huntsville International Airport and I-65. That stretch of roadway connects a handful of manufacturing facilities such as Mazda Toyota, Polaris, GE Aviation and BOCAR with the rest of the automotive world.

He pointed to the I-565 interchange on I-65 as needing study to assess how it can handle additional lanes of traffic. There are also environmental issues in the I-565 area that will need attention as well, Harris said.

"We've got to identify to what extent improvement s are needed where I-565 connects to I-65," he said. "And what impact additional lanes will have on that entire corridor in terms of other improvements that might be needed at other interchanges. And there is at least some of that area where some detailed environmental studies will be required.

"That work is all fast tracking, ramping up and we will prosecute that work as fast as the department can."

Harris said ALDOT is aware of the growing industry presence on the I-565 corridor and the need for expansion.

"That area is seeing tremendous growth and the state recognizes the need to respond to that," he said.

Sounds like we might be getting some good news...
All widening does is allow more people to use the highway and clog it up even more.  It doesn't solve problems, it causes more.

formulanone

#252
Quote from: Avalanchez71 on May 09, 2025, 10:32:15 PMAll widening does is allow more people to use the highway and clog it up even more.  It doesn't solve problems, it causes more.

Wow, never heard the induced demand excuse used before by someone named for a pickup truck. It's such a broken fallacy because while one part might be true, following it does nothing to help the situation. There's no serious long range plans to widen everything all at once, because that doesn't exist...anywhere.

Tell me you've driven on the arterials and side roads during rush hours in Huntsville without telling me you've never driven here during rush hours. Those roads are already clogged up and nobody plans to widen them, either. Have you noticed the glacial pace of road widening here at all?

Avalanchez71

I spend time in Huntsville at least one day every other month.

freebrickproductions

The city (and ideally the general metro area(s) if not the state) do need to invest in alternative forms of transportation, but I-565 still absolutely needed the widening. Before the section between I-65 and County Line Road was widened, I-565 was pretty much a bumper to bumper crawl all the way from Exit 13 to I-65.

Unfortunately, Alabama does not invest state funding in mass transit, though I know the city is looking at improving its bus network and maybe even expanding that to light or commuter rail in the future.
May or may not be batticorn.

I also collect traffic lights, road signs, fans, and railroad crossing equipment.

Art in avatar by Dencounter!

(They/Them)

ElishaGOtis

Quote from: freebrickproductions on May 10, 2025, 10:06:07 PMThe city (and ideally the general metro area(s) if not the state) do need to invest in alternative forms of transportation, but I-565 still absolutely needed the widening. Before the section between I-65 and County Line Road was widened, I-565 was pretty much a bumper to bumper crawl all the way from Exit 13 to I-65.

Unfortunately, Alabama does not invest state funding in mass transit, though I know the city is looking at improving its bus network and maybe even expanding that to light or commuter rail in the future.


Amtrak has entered the chat
I can drive 55 ONLY when it makes sense.

NOTE: Opinions expressed here on AARoads are solely my own and do not represent or reflect the statements, opinions, or decisions of any agency. Any official information I share will be quoted or specified from another source.

My ideal speed limits (FAKE/FICTIONAL NOT OFFICIAL) :
https://www.google.com/maps/d/edit?mid=1Ia4RR_BaYyzgJq4n3JcYzkNZjLYKzGQ

freebrickproductions

Quote from: ElishaGOtis on May 12, 2025, 06:21:16 PM
Quote from: freebrickproductions on May 10, 2025, 10:06:07 PMThe city (and ideally the general metro area(s) if not the state) do need to invest in alternative forms of transportation, but I-565 still absolutely needed the widening. Before the section between I-65 and County Line Road was widened, I-565 was pretty much a bumper to bumper crawl all the way from Exit 13 to I-65.

Unfortunately, Alabama does not invest state funding in mass transit, though I know the city is looking at improving its bus network and maybe even expanding that to light or commuter rail in the future.


Amtrak has entered the chat

I know city leaders have previously expressed interest in having Amtrak come to Huntsville, though I don't know if there's enough political will in this region for Amtrak to come here.
May or may not be batticorn.

I also collect traffic lights, road signs, fans, and railroad crossing equipment.

Art in avatar by Dencounter!

(They/Them)

freebrickproductions

Sounds like I-565's widening is coming along nicely:
https://aldotnews.com/2026/08/11/i-565-widening-moves-toward-next-stage/
Quote from: ALDOT
A recent aerial view of the I-565 widening project near Exit 8 (Glenn Hearn Boulevard). Concrete barriers separate traffic from the newly-constructed inside lanes on each roadway.

AUG 11, 2026
Expect traffic control changes
Expect nighttime lane closures this week and next week in preparation for the next stage of work on the I-565 widening project in Madison.

Since the $29 million project began in Fall 2024, the median of I-565 from Exit 7 (County Line Road) to Bradford Creek, between Exit 8 (Glenn Hearn Boulevard) and Exit 9 (Wall Triana Highway), has remained cordoned by concrete barriers.

With the inside widening work on that part of the project substantially complete, the contractor, Wiregrass Construction, will now relocate the barriers to other areas requiring widening.

Areas still requiring widening include the outside shoulder near Exit 7 and the median near Exit 9.

Nighttime lane closures
Weather permitting, expect single-lane closures on four to five upcoming nights.

The contractor will relocate eastbound barriers on the evenings of Wednesday, Aug. 12, and Thursday, Aug. 13. They will then relocate westbound barriers on the evenings of Sunday, Aug. 16, Monday, Aug. 17, and possibly Tuesday, Aug. 18.

Work will begin about 7 p.m. each night and conclude about 6 a.m. the following day.

State troopers will assist with traffic control during this operation.

An interstate highway that is being expanded to six lanes, On each side, the newly-paved inside lanes are separated from the outer two lanes by concrete barriers.


With additional lanes constructed to the inside of each roadway between Exit 7 and Bradford Creek, I-565 will now undergo widening in other areas.

Lane shift change
On the eastbound roadway, the current, rightward lane shift will change to a lane shift to the left.

A subcontractor will remove existing traffic stripe and pavement markers and install new stripe and markers delineating the new lane shift.

An interstate highway that is being expanded to six lanes, On each side, the newly-paved inside lanes are separated from the outer two lanes by concrete barriers.


The west end of the project, where the contractor will widen to the outside of I-565 near Exit 7.
Workers install guardrail posts.


Drainage, guardrail and sod have been installed in the median between the widened roadways.


Bridge widening
In addition to constructing a third lane on each roadway to east of Exit 9, the project includes widening two sets of bridges, at Bradford Creek west of Exit 9 and at Intergraph Way and the Norfolk Southern railroad east of Exit 9.

Last week, bridge subcontractor Miller & Miller installed girders for the final spans of the bridges at Bradford Creek.

Due to the narrow work area between the bridges, the westernmost spans of the bridges are the last to be constructed.

Two bridges in the process of being widened. The bridge deck is in place on all but the final spans of either bridge, where girders have just been installed.


Last week, a subcontractor installed girders — long horizontal beams to support the future bridge deck — for widening the last spans of the I-565 bridges over Bradford Creek, near Exit 9.

ALDOT anticipates work on the bridges at Intergraph Way and the Norfolk Southern railroad resuming this fall, following completion of the bridges at Bradford Creek.
May or may not be batticorn.

I also collect traffic lights, road signs, fans, and railroad crossing equipment.

Art in avatar by Dencounter!

(They/Them)

Plutonic Panda

Awesome I love a good freeway widening believe it or not. This will be a nice addition to the road and the residents in the area.