Quote from: on_wisconsin on July 18, 2025, 09:07:50 AMWhy in the bloody hell would they even be proposing new stop lights on 51 at MKE St...

https://wisconsindot.gov/Documents/projects/by-region/sw/us51-corridor/0725milwaukee.pdf

For the EIS, they have to show they considered other alternatives.


WISFreeways

Madison Beltline study: website claims PEL out by "summer 2025"; I guess we'll have to wait at most 16 more days.
https://wisconsindot.gov/Pages/projects/by-region/sw/madisonbeltline/default.aspx

I-39/90/94 study: super exciting!
https://wisconsindot.gov/Pages/projects/by-region/sw/399094/default.aspx

US 12 freeway conversion to WIS 19: crickets. Despite being arguably the most important of the current studies.
https://wisconsindot.gov/Pages/projects/by-region/sw/12freeway/default.aspx

2009-era me chose this generic username...

mgk920

I do like the idea of a full directional 'T' interchange between the (interstates) and US 151 to the northeast at Washington Ave ('East Towne interchange').  A full separation of the freeway-to-freeway' traffic from the local surface streets, as well as from the transit BRT line at that location.

Mike

hobsini2

Quote from: mgk920 on September 06, 2025, 01:20:31 PMI do like the idea of a full directional 'T' interchange between the (interstates) and US 151 to the northeast at Washington Ave ('East Towne interchange').  A full separation of the freeway-to-freeway' traffic from the local surface streets, as well as from the transit BRT line at that location.

Mike
More like the 41/29 interchange in Green Bay or the 39/90/43 interchange in Beloit? I don't think there's enough room for the latter at 151 and 30/90/94.
I knew it. I'm surrounded by assholes. Keep firing, assholes! - Dark Helmet (Spaceballs)

The Ghostbuster

It appears that either a standard diamond interchange or a SPUI will be constructed as the service interchange at the reconstructed Interstate 39/90/94 interchange at US 151: https://wisconsindot.gov/Documents/projects/by-region/sw/399094/0124us151highcrossicalt1directionalspuivsdiamond.pdf.

mgk920

Quote from: hobsini2 on September 06, 2025, 01:36:55 PM
Quote from: mgk920 on September 06, 2025, 01:20:31 PMI do like the idea of a full directional 'T' interchange between the (interstates) and US 151 to the northeast at Washington Ave ('East Towne interchange').  A full separation of the freeway-to-freeway' traffic from the local surface streets, as well as from the transit BRT line at that location.

Mike
More like the 41/29 interchange in Green Bay or the 39/90/43 interchange in Beloit? I don't think there's enough room for the latter at 151 and 30/90/94.

I have seen WisDOT drawings of it, with the freeway ramps 'piggybacked' over the restored local surface streets.  It is tight with no full '65' speed ramps and ROW takings, but it does work.

Mike

mgk920

Quote from: The Ghostbuster on Today at 11:31:01 AMIt appears that either a standard diamond interchange or a SPUI will be constructed as the service interchange at the reconstructed Interstate 39/90/94 interchange at US 151: https://wisconsindot.gov/Documents/projects/by-region/sw/399094/0124us151highcrossicalt1directionalspuivsdiamond.pdf.

Those look to me like full 'free flow' for the connections between the US 151 freeway to the northeast and the interstate(s) with Washington Ave/High Crossing Bd to the northeast getting the 'Texas frontage road' treatment.  It is more apparent in the second option (the 'conventional diamond' for the Washington Ave surface street).  WisDOT is definitely planning this for the long term.

Mike

WISFreeways

To clarify.
Here is the preferred alternative for the I-39/90/94 study.
https://wisconsindot.gov/Documents/projects/by-region/sw/399094/1224section2.pdf
2009-era me chose this generic username...

Sani

I'm kind of surprised they're not looking at an interchange at Hanson Road / Eastpark Boulevard instead of Hoepker Road, especially with the UW Health East Madison complex being right there. I know it's just over a mile from US 151, but you could put ramps to and from northbound 39/90/94 to a roundabout on Portage Road at the north entrance to the hospital and have the ramps to and from the southbound interstate wrap around the substation on the northwest corner of the interchange.

thspfc

Quote from: Sani on Today at 03:07:24 PMI'm kind of surprised they're not looking at an interchange at Hanson Road / Eastpark Boulevard instead of Hoepker Road, especially with the UW Health East Madison complex being right there. I know it's just over a mile from US 151, but you could put ramps to and from northbound 39/90/94 to a roundabout on Portage Road at the north entrance to the hospital and have the ramps to and from the southbound interstate wrap around the substation on the northwest corner of the interchange.