More US 31 upgrades between Indy and South Bend

Started by monty, July 12, 2019, 04:23:31 PM

Previous topic - Next topic

wh15395

Quote from: Great Lakes Roads on September 25, 2025, 03:20:16 PM"Level Up 31" project to begin construction on or after October 6th. Phase 1 of the project involves three ramp closures.

1. Closure of the southbound U.S. 31 ramp to 106th Street through late-December
2. Closure of eastbound 106th Street at U.S. 31 through late-December
3. Closure on the eastbound I-465 ramp to southbound Meridian Street through mid-December

Website: https://levelup31.com/

I remember predicting this project would need to be done when 31 was originally reconstructed about a decade ago. I have no idea how INDOT ever thought single lane ramps from 31 to 465 would be sufficient in either direction. They started backing up almost right after construction finished up last time.