When is the awful mess of I-95 south of Philly going to be finished?
You mean in Wilmington? Or the paving project in Delaware County?
Everything from the PA line north to Exit 8 has been a disaster. My take is because they have to maintain 3 lanes each way, it takes a very long time to get anything done.
PennDOT seems to run that project (and many paving projects) far less efficiently than other organizations, even PTC does much better.
I don't know what they've done other than mill and repave; certainly could be some other stuff going on. But it really is taking a long time to do whatever it is they're doing.
When's the last time you drove through? they took the old barrier wall out, put a new higher one in while doing concrete work on the bridges and fixing all guard rails, along with redoing the concrete sections under the roadway, and repaving.
Fixing all old signs, line strips, reflectors and all.
They basically did a whole major Rehab on the road from the Delaware line to The Airport. Something we can all attest that the portion through Chester needed badly, those broken green reflectors on the barriers were sad to look at now they are gone and the ones that have stayed have been replaced.