Key Bridge (Round Who Knows But Probably Not Last)

Started by Beltway, April 28, 2026, 06:15:15 PM

Previous topic - Next topic

kphoger

Quote from: Max Rockatansky on May 19, 2026, 09:28:21 PMBy "world" I'm assuming Beltway actually was referencing the general populace.

Correct.  Current population 8292114853.

Quote from: Max Rockatansky on May 19, 2026, 09:28:21 PMWhat percentage of the population are we estimating is shaking their heads?

1 ÷ 8292114853 = 0.00000001206%

Quote from: Max Rockatansky on May 19, 2026, 09:28:21 PMWhat percentage is shaking other body parts?

Approximately 75% of the world's population is estimated to engage in some form of recreational dancing.  If we assume that half of the remainder are male, then that means 12.5% of the world's population (1) don't know how to dance but (2) routinely shake a body part after urinating.  Add another 0.5% for weirdo females who just shake random body parts for no reason, and another 0.5% for females who only engage in some sort of tribal or religious dancing, and we're up to 88.5% of the world's population who shake body parts other than their head.

(Note:  I rounded to the nearest 0.5%, as I'm not sure if Scott engages in recreational dancing or not.)

He Is Already Here! Let's Go, Flamingo!
Dost thou understand the graveness of the circumstances?
Deut 23:13
Male pronouns, please.

Quote from: PKDIf you can control the meaning of words, you can control the people who must use them.


Plutonic Panda


kphoger

Quote from: Plutonic Panda on May 20, 2026, 03:16:52 PMNew contractors are being sought:

https://www.msn.com/en-us/money/real-estate/maryland-seeks-new-contractors-for-4-8b-key-bridge-construction/ar-AA23BbmE

And, I see that...

QuoteAccording to a Tuesday news release from the state, the four new contracts include:

— Demolition of the remaining structures over water and miscellaneous marine work, costing $50 million to $100 million

— Construction of the south land approach, costing $300 million to $400 million

— Construction of the north land approach, costing $200 million to $300 million

Construction of the main span, pier protection and marine approaches, costing $3.5 billion to $4 billion.

He Is Already Here! Let's Go, Flamingo!
Dost thou understand the graveness of the circumstances?
Deut 23:13
Male pronouns, please.

Quote from: PKDIf you can control the meaning of words, you can control the people who must use them.

Beltway

Quote from: kphoger on May 20, 2026, 03:25:20 PMAccording to a Tuesday news release from the state, the four new contracts include:
— Demolition of the remaining structures over water and miscellaneous marine work, costing $50 million to $100 million
— Construction of the south land approach, costing $300 million to $400 million
— Construction of the north land approach, costing $200 million to $300 million
Construction of the main span, pier protection and marine approaches, costing $3.5 billion to $4 billion.
That was detailed in the MDTA press release that I posted yesterday.

The main contact will run into the same problem that caused Kiewit to back out.

Maryland still lacks both a finalized federal funding package and an identified state funding plan. Without those two documents, no mega‑bridge contractor will sign a multi‑billion‑dollar GMP. That's the same unresolved condition that caused Kiewit to walk, and the four‑contract structure doesn't change it.

Then the issue of finding a contractor willing to bid on an elevated approach that while much less costly may well turn into an Evel Knievel ramp. That could make his company look bad.
Baloney is a reserved word on the Internet
    (Robert Coté, 2002)

Rothman

Copy and paste...copy and paste...rinse and repeat...
Please note: All comments here represent my own personal opinion and do not reflect the official position(s) of NYSDOT.

ElishaGOtis

Quote from: Rothman on May 20, 2026, 05:35:17 PMCopy and paste...copy and paste...rinse and repeat...

MDTA is stuck doing the same thing tbf :pan:

And NYCDOT on the BQE. Or any other project that gets stuck in this loop lmao
I can drive 55 ONLY when it makes sense.

NOTE: Opinions expressed here on AARoads are solely my own and do not represent or reflect the statements, opinions, or decisions of any agency. Any official information I share will be quoted or specified from another source.

My ideal speed limits (FAKE/FICTIONAL NOT OFFICIAL) :
https://www.google.com/maps/d/edit?mid=1Ia4RR_BaYyzgJq4n3JcYzkNZjLYKzGQ

Max Rockatansky

#106
Quote from: ElishaGOtis on May 20, 2026, 06:42:36 PM
Quote from: Rothman on May 20, 2026, 05:35:17 PMCopy and paste...copy and paste...rinse and repeat...

MDTA is stuck doing the same thing tbf :pan:

And NYCDOT on the BQE. Or any other project that gets stuck in this loop lmao

You do realize you're the only one coming to the defense a particular individual?  That's something you might want to consider before you end up in the middle of this troll war.

ElishaGOtis

Quote from: Max Rockatansky on May 20, 2026, 06:48:48 PM
Quote from: ElishaGOtis on May 20, 2026, 06:42:36 PM
Quote from: Rothman on May 20, 2026, 05:35:17 PMCopy and paste...copy and paste...rinse and repeat...

MDTA is stuck doing the same thing tbf :pan:

And NYCDOT on the BQE. Or any other project that gets stuck in this loop lmao

You do realize you're the only one coming to the defense a particular individual?  That's something you might want to consider before you end up in the middle of this troll war.

Valid point 😳
I can drive 55 ONLY when it makes sense.

NOTE: Opinions expressed here on AARoads are solely my own and do not represent or reflect the statements, opinions, or decisions of any agency. Any official information I share will be quoted or specified from another source.

My ideal speed limits (FAKE/FICTIONAL NOT OFFICIAL) :
https://www.google.com/maps/d/edit?mid=1Ia4RR_BaYyzgJq4n3JcYzkNZjLYKzGQ

vdeane

Quote from: Beltway on May 20, 2026, 04:35:31 PMThat's the same unresolved condition that caused Kiewit to walk
So first you said the government dropped the firm, now you're saying the firm quit.  Which is it?  Then again, why should I expect VDOT's retired IT guy to know?
Please note: All comments here represent my own personal opinion and do not reflect the official position of NYSDOT or its affiliates.

Beltway

The sequence is documented in the MDTA releases: Kiewit declined to sign a GMP, and MDTA exercised the off‑ramp. That's the entire story. You could say both are true.
Baloney is a reserved word on the Internet
    (Robert Coté, 2002)

Scott5114

Quote from: Beltway on May 20, 2026, 08:54:55 PMThe sequence is documented in the MDTA releases: Kiewit declined to sign a GMP, and MDTA exercised the off‑ramp. That's the entire story. You could say both are true.

so -- RELAX!
uncontrollable freak sardine salad chef