News:

Am able to again make updates to the Shield Gallery!
- Alex

Main Menu

Wisconsin notes

Started by mgk920, May 30, 2012, 02:33:31 AM

Previous topic - Next topic

SEWIGuy

Quote from: Plutonic Panda on May 30, 2025, 02:20:52 AMHopefully they keep the freeway.

Again, why do you care?


SEWIGuy

Quote from: Great Lakes Roads on May 29, 2025, 07:28:07 PM
Quote from: The Ghostbuster on May 26, 2025, 12:06:11 PMThe Interstate 794 Lake Interstate Study has a PIM on Thursday at the Milwaukee Marriot Downtown hotel: https://www.794lakeinterchange.wisconsindot.gov/outreach#publicMeetings. As I have stated before, I hope the DOT goes for the freeway improvement alternative, and not the freeway removal alternative.

4 alternatives from this study-

1. No-build
2. Replace in-kind- rebuild the bridges on the same/existing alignment
3. Freeway removal- removes the elevated freeway from the Marquette Interchange to the Hoan Bridge
4. Freeway improvement- makes the freeway alignment closer together

Knock it down!

GeekJedi

Quote from: SEWIGuy on May 30, 2025, 09:09:46 AM
Quote from: Great Lakes Roads on May 29, 2025, 07:28:07 PM
Quote from: The Ghostbuster on May 26, 2025, 12:06:11 PMThe Interstate 794 Lake Interstate Study has a PIM on Thursday at the Milwaukee Marriot Downtown hotel: https://www.794lakeinterchange.wisconsindot.gov/outreach#publicMeetings. As I have stated before, I hope the DOT goes for the freeway improvement alternative, and not the freeway removal alternative.



4 alternatives from this study-

1. No-build
2. Replace in-kind- rebuild the bridges on the same/existing alignment
3. Freeway removal- removes the elevated freeway from the Marquette Interchange to the Hoan Bridge
4. Freeway improvement- makes the freeway alignment closer together

Knock it down!

No thanks. Improve and rebuild.
"Wisconsin - The Concurrency State!"

SEWIGuy

Quote from: GeekJedi on May 30, 2025, 10:20:04 AM
Quote from: SEWIGuy on May 30, 2025, 09:09:46 AM
Quote from: Great Lakes Roads on May 29, 2025, 07:28:07 PM
Quote from: The Ghostbuster on May 26, 2025, 12:06:11 PMThe Interstate 794 Lake Interstate Study has a PIM on Thursday at the Milwaukee Marriot Downtown hotel: https://www.794lakeinterchange.wisconsindot.gov/outreach#publicMeetings. As I have stated before, I hope the DOT goes for the freeway improvement alternative, and not the freeway removal alternative.



4 alternatives from this study-

1. No-build
2. Replace in-kind- rebuild the bridges on the same/existing alignment
3. Freeway removal- removes the elevated freeway from the Marquette Interchange to the Hoan Bridge
4. Freeway improvement- makes the freeway alignment closer together

Knock it down!

No thanks. Improve and rebuild.


KNOCK IT DOWN!!!! DO IT TOMORROW!!!

Milwaukee, WY

Quote from: SEWIGuy on May 30, 2025, 10:28:48 AM
Quote from: GeekJedi on May 30, 2025, 10:20:04 AM
Quote from: SEWIGuy on May 30, 2025, 09:09:46 AM
Quote from: Great Lakes Roads on May 29, 2025, 07:28:07 PM
Quote from: The Ghostbuster on May 26, 2025, 12:06:11 PMThe Interstate 794 Lake Interstate Study has a PIM on Thursday at the Milwaukee Marriot Downtown hotel: https://www.794lakeinterchange.wisconsindot.gov/outreach#publicMeetings. As I have stated before, I hope the DOT goes for the freeway improvement alternative, and not the freeway removal alternative.



4 alternatives from this study-

1. No-build
2. Replace in-kind- rebuild the bridges on the same/existing alignment
3. Freeway removal- removes the elevated freeway from the Marquette Interchange to the Hoan Bridge
4. Freeway improvement- makes the freeway alignment closer together

Knock it down!

No thanks. Improve and rebuild.


KNOCK IT DOWN!!!! DO IT TOMORROW!!!

Agreed.  It needs to go. Its madness to have that overbuilt piece of infrastructure cutting through the most valuable real estate in the state.  Honestly, the plan for rebuilding Clybourn in the removal alternative looks to be excessive, but I'll take it.  Bottom line: cities should be for people before cars.

mgk920

RESURRECT AND BUILD THE PARK!

 :nod:

Mike

The Ghostbuster

The Park East Freeway was an underutilized spur that was able to be torn down without major traffic impacts. Interstate 794 east of the Marquette Interchange connects to the Lake Freeway, the Hoan Bridge and the Lake Parkway (and provides connections to the rest of the Milwaukee freeway system, as well as takes trucks off local streets). My preference would be to maintain the freeway and implement the Freeway Improvement Alternative with Right-Hand Ramps at Jackson/Van Buren: https://drive.google.com/file/d/1c4F7xjqhGVZJ6v3v1yqpO5bBEbx6JsnJ/view. I believe that alternative would improve safety and serve the area's traffic needs the best.

Great Lakes Roads


Here's the video of the I-794 public meeting.
-Jay Seaburg

midwesternroadguy

Quote from: peterj920 on May 08, 2025, 12:29:50 PMThe new WISDOT map is out. I really like it. Very accurate and the freeways are back on The Beltline, Wis 11, and Wis 145. WisThere's a slight redesign and it looks good.

I like it too.

Interesting additions to the primary highway system (red routes).  I'm not sure that I disagree with any of them.
However, if WISDOT would ever build an interchange on the north side of Mauston with STH 58, that should be a primary route instead of STH 80 into New Lisbon.   

The new interstate shields are a step in the right direction.  Blue bottoms (as many states now have on their maps) would complete them. 

I think that 5-lane highways with center turn lanes can be depicted as multi lane divided.  It's more informative to me if they are. 

Yeah, and there is that inconsistency of what constitutes an expressway.  Stoplights.  55 mph speed limits.  It wouldn't be so noticeable except where they change highway types on the same road, such as US 41 entering Marinette, or STH 23 entering FdL, etc.




mgk920

Quote from: midwesternroadguy on May 30, 2025, 07:42:23 PM
Quote from: peterj920 on May 08, 2025, 12:29:50 PMThe new WISDOT map is out. I really like it. Very accurate and the freeways are back on The Beltline, Wis 11, and Wis 145. WisThere's a slight redesign and it looks good.

I like it too.

Interesting additions to the primary highway system (red routes).  I'm not sure that I disagree with any of them.
However, if WISDOT would ever build an interchange on the north side of Mauston with STH 58, that should be a primary route instead of STH 80 into New Lisbon.   

The new interstate shields are a step in the right direction.  Blue bottoms (as many states now have on their maps) would complete them. 

I think that 5-lane highways with center turn lanes can be depicted as multi lane divided.  It's more informative to me if they are. 

Yeah, and there is that inconsistency of what constitutes an expressway.  Stoplights.  55 mph speed limits.  It wouldn't be so noticeable except where they change highway types on the same road, such as US 41 entering Marinette, or STH 23 entering FdL, etc.


Like with Wisconsin Ave (WI 96) and part of Richmond St (WI 47) on Appleton's northwest side?  Those are decidedly normal city streets that are as you describe.

Mike

TheCatalyst31

Quote from: Milwaukee, WY on May 30, 2025, 11:30:27 AM
Quote from: SEWIGuy on May 30, 2025, 10:28:48 AM
Quote from: GeekJedi on May 30, 2025, 10:20:04 AM
Quote from: SEWIGuy on May 30, 2025, 09:09:46 AM
Quote from: Great Lakes Roads on May 29, 2025, 07:28:07 PM
Quote from: The Ghostbuster on May 26, 2025, 12:06:11 PMThe Interstate 794 Lake Interstate Study has a PIM on Thursday at the Milwaukee Marriot Downtown hotel: https://www.794lakeinterchange.wisconsindot.gov/outreach#publicMeetings. As I have stated before, I hope the DOT goes for the freeway improvement alternative, and not the freeway removal alternative.



4 alternatives from this study-

1. No-build
2. Replace in-kind- rebuild the bridges on the same/existing alignment
3. Freeway removal- removes the elevated freeway from the Marquette Interchange to the Hoan Bridge
4. Freeway improvement- makes the freeway alignment closer together

Knock it down!

No thanks. Improve and rebuild.


KNOCK IT DOWN!!!! DO IT TOMORROW!!!

Agreed.  It needs to go. Its madness to have that overbuilt piece of infrastructure cutting through the most valuable real estate in the state.  Honestly, the plan for rebuilding Clybourn in the removal alternative looks to be excessive, but I'll take it.  Bottom line: cities should be for people before cars.

Also agreed. I-794 does have benefits, but they aren't worth breaking up downtown Milwaukee the way it does.



Opinions expressed here on belong solely to the poster and do not represent or reflect the opinions or beliefs of AARoads, its creators and/or associates.