Quote from: silverback1065 on May 13, 2026, 08:31:54 AM
Quote from: Great Lakes Roads on May 12, 2026, 11:43:56 PMhttps://www.wrtv.com/news/wrtv-investigates/indot-north-split-reconstruction-project-reduced-crashes-by-29-in-hot-spot-areas

The North Split (I-65/70) interchange is the sixth-busiest interchange in Indiana.

A quick look today showed the following (by traffic volume):

1. I-69/I-465/I-70 (east side)
2. I-465/I-69 (Clear Path)
3. I-465/I-65 (south side)
4. I-74/I-465/I-70 (west side)
5. I-65/I-80/I-94 (Borman)
6. I-65/I-70 (North Split)


That surprises me, I expected something on the Borman would be 1.

If you measured only trucks, I'm certain that I-65/80/94 would be #1, but a lot more commuters are using those Indy interchanges.
Indiana: counties 100%, highways 100%
Illinois: counties 100%, highways 61%
Michigan: counties 100%, highways 56%
Wisconsin: counties 86%, highways 23%


I-55

Quote from: silverback1065 on May 13, 2026, 08:31:54 AM
Quote from: Great Lakes Roads on May 12, 2026, 11:43:56 PMhttps://www.wrtv.com/news/wrtv-investigates/indot-north-split-reconstruction-project-reduced-crashes-by-29-in-hot-spot-areas

The North Split (I-65/70) interchange is the sixth-busiest interchange in Indiana.

A quick look today showed the following (by traffic volume):

1. I-69/I-465/I-70 (east side)
2. I-465/I-69 (Clear Path)
3. I-465/I-65 (south side)
4. I-74/I-465/I-70 (west side)
5. I-65/I-80/I-94 (Borman)
6. I-65/I-70 (North Split)


That surprises me, I expected something on the Borman would be 1.

I'm actually surprised the Borman made in the top five at all. While it may have the worst traffic of any interstate in Indiana, there are only 2 system interchanges on the Borman, I-65 and the Toll Road. The Toll Road has traffic volumes on par with area surface streets and is far enough east that the Borman has lost half of its peak volume. The north leg of the I-65 interchange only has 27k AADT, and the south leg has 98k. This is practically a directional interchange where I-65 feeds the Borman about 40% of its volume between I-65 and the IL state line.
Purdue Civil Engineering '24
Quote from: I-55 on April 13, 2025, 09:39:41 PMThe correct question is "if ARDOT hasn't signed it, why does Google show it?" and the answer as usual is "because Google Maps signs stuff incorrectly all the time"

hobsini2

Quote from: I-55 on May 13, 2026, 10:46:02 AM
Quote from: silverback1065 on May 13, 2026, 08:31:54 AM
Quote from: Great Lakes Roads on May 12, 2026, 11:43:56 PMhttps://www.wrtv.com/news/wrtv-investigates/indot-north-split-reconstruction-project-reduced-crashes-by-29-in-hot-spot-areas

The North Split (I-65/70) interchange is the sixth-busiest interchange in Indiana.

A quick look today showed the following (by traffic volume):

1. I-69/I-465/I-70 (east side)
2. I-465/I-69 (Clear Path)
3. I-465/I-65 (south side)
4. I-74/I-465/I-70 (west side)
5. I-65/I-80/I-94 (Borman)
6. I-65/I-70 (North Split)


That surprises me, I expected something on the Borman would be 1.

I'm actually surprised the Borman made in the top five at all. While it may have the worst traffic of any interstate in Indiana, there are only 2 system interchanges on the Borman, I-65 and the Toll Road. The Toll Road has traffic volumes on par with area surface streets and is far enough east that the Borman has lost half of its peak volume. The north leg of the I-65 interchange only has 27k AADT, and the south leg has 98k. This is practically a directional interchange where I-65 feeds the Borman about 40% of its volume between I-65 and the IL state line.
Realistically, you could say IN 912 - Cline Ave is a system interchange since it is a freeway north of the Borman. But I get your point.
I knew it. I'm surrounded by assholes. Keep firing, assholes! - Dark Helmet (Spaceballs)

Interstate 69 Fan

Quote from: Great Lakes Roads on May 12, 2026, 11:43:56 PMhttps://www.wrtv.com/news/wrtv-investigates/indot-north-split-reconstruction-project-reduced-crashes-by-29-in-hot-spot-areas

The North Split (I-65/70) interchange is the sixth-busiest interchange in Indiana.

A quick look today showed the following (by traffic volume):

1. I-69/I-465/I-70 (east side)
2. I-465/I-69 (Clear Path)
3. I-465/I-65 (south side)
4. I-74/I-465/I-70 (west side)
5. I-65/I-80/I-94 (Borman)
6. I-65/I-70 (North Split)

Hmm, seeing this makes me think that the I-65 interchange on the south side might need reconfiguring minus the I-465WB-65SB ramp they added years ago. Sure does feel very outdated travelling through it in 2026.
Apparently I’m a fan of I-69.  Who knew.

tdindy88

Quote from: Interstate 69 Fan on May 18, 2026, 10:21:28 PM
Quote from: Great Lakes Roads on May 12, 2026, 11:43:56 PMhttps://www.wrtv.com/news/wrtv-investigates/indot-north-split-reconstruction-project-reduced-crashes-by-29-in-hot-spot-areas

The North Split (I-65/70) interchange is the sixth-busiest interchange in Indiana.

A quick look today showed the following (by traffic volume):

1. I-69/I-465/I-70 (east side)
2. I-465/I-69 (Clear Path)
3. I-465/I-65 (south side)
4. I-74/I-465/I-70 (west side)
5. I-65/I-80/I-94 (Borman)
6. I-65/I-70 (North Split)

Hmm, seeing this makes me think that the I-65 interchange on the south side might need reconfiguring minus the I-465WB-65SB ramp they added years ago. Sure does feel very outdated travelling through it in 2026.

Some of it could be related to the interchange itself but I feel most of the congestion in that area is simply from the sheer amount of traffic along I-465. At that point I-465 now has both I-69 and I-74 traffic, plus several U.S. highways. And further more, the southern part of I-465 acts as an unofficial bypass for I-70 and to the west of that interchange is part of the unofficial bypass of I-65. So there's a lot of interstate's worth of traffic on that stretch of highway. And it's only six lanes in width. Capacity needs to be added to that whole stretch of roadway from US 31 on the south side to I-70 on the east side. That would help more than any additional change to the 465/65 interchange itself.

seicer

The biggest issues with the southern Interstate 465/65 interchange, based on my experience driving it nearly daily, are the lack of ramp capacity and the weaving.

  • While the ramp from Interstate 465 west to Interstate 65 south is two lanes, it has to merge with the undersized ramp from Interstate 465 east to Interstate 65 south.
  • The Interstate 465 east to Interstate 65 south ramp is undersized at one lane and will back up to the East Street ramp well before peak times. The ramp's curves and grade keep traffic moving more slowly than it should.
  • The tight east- and westbound Interstate 65 to Interstate 465 ramps have substandard 25-MPH curves and left merges. They recently lengthened the acceleration lane, but it only moves the choke point further away.
  • Three lanes depart from Interstate 65 north to Interstate 465, with the Interstate 465 westbound ramp coming from the slow lane of Interstate 65. This backs up through-traffic in that lane to Southport Road at peak, resulting in slow, weaving traffic in the other through lanes. (And frustratingly, people stop in the through lanes to be let into the queue for Interstate 465.)
  • Weaving between Interstate 465 and Emerson Avenue, and to a lesser extent, Interstate 65 and Southport Road.

The Ghostbuster

Are there any plans to reconstruct the southern Interstate 65/465 interchange? Next time it happens, all ramps should be expanded to two lanes.

jhuntin1

Sadly, I doubt it. It's only been a decade since it was last rebuilt.

I-55

Quote from: jhuntin1 on May 22, 2026, 02:40:42 PMSadly, I doubt it. It's only been a decade since it was last rebuilt.

I wouldn't call one ramp conversion a "rebuild" of an interchange. When I looked at the I-69 Finish Line traffic forecast documents I know there's at least a concept of rebuilding the US 31 interchange and there was another alternative for a rebuild at the I-65 interchange, though both of those were forecasts for the 2040 year.
Purdue Civil Engineering '24
Quote from: I-55 on April 13, 2025, 09:39:41 PMThe correct question is "if ARDOT hasn't signed it, why does Google show it?" and the answer as usual is "because Google Maps signs stuff incorrectly all the time"

I-55

New I-465 lanes set to open soon in the Clear Path work zone. Facebook post from the project:

https://www.facebook.com/share/p/1G1AtMMoCG/

QuoteClear Path 465 is reaching a major milestone, with the end of construction on mainline I-465 in sight.
Here's what's coming soon on Clear Path 465:
🚧 Traffic shifts as new lanes and bridges are completed
🚧 Three lanes open in each direction in final configuration on I-465 during final work
When final touches are complete, I-465 will open to four through lanes in each direction.

Traffic cameras show new striping on I-465 between I-69 and 71st St, indicating that the lane shift is coming this weekend or next most likely.
Purdue Civil Engineering '24
Quote from: I-55 on April 13, 2025, 09:39:41 PMThe correct question is "if ARDOT hasn't signed it, why does Google show it?" and the answer as usual is "because Google Maps signs stuff incorrectly all the time"

I-55

Looks like there will be major traffic shifts coming to I-465 this weekend which will likely include opening of the new EB/SB lanes.

https://clearpath465.com/new-i-465-ramp-opening-this-weekend/

QuoteRamp and lane restrictions are scheduled overnight this week in northeast Indianapolis. Crews are shifting traffic to the new ramp from eastbound I-465 to northbound I-69. The new ramp is expected to open Saturday, May 30.

Before the new ramp opens, crews will shift traffic Thursday night on northbound Binford Boulevard near 75th Street. On Friday night, crews will temporarily close several ramps along eastbound I-465 to safely shift traffic and open the new ramp.

Drivers can expect the following closures from 9 p.m. to 6 a.m.:

Thursday, May 28

  • Northbound Binford Boulevard reduced to one lane between 71st Street and 75th Street
  • No access to northbound I-69 from northbound Binford Boulevard at 75th Street

Friday, May 29

  • Ramp from eastbound I-465 to northbound I-69 closed
  • Signed Detour: Eastbound I-465 to southbound I-465 and turn around at Pendleton Pike (U.S. 36).
  • Ramp from eastbound I-465 to southbound Binford Boulevard closed
  • Ramp from eastbound I-465 to Allisonville Road closed
  • Ramps from Keystone Avenue to eastbound I-465 closed
  • Eastbound I-465 reduced to two lanes from just west of the White River to Fall Creek Road

Drivers should plan ahead and seek alternate routes, when possible. Actual dates and anticipated work may be adjusted if inclement weather or other unforeseen circumstances occur.
Purdue Civil Engineering '24
Quote from: I-55 on April 13, 2025, 09:39:41 PMThe correct question is "if ARDOT hasn't signed it, why does Google show it?" and the answer as usual is "because Google Maps signs stuff incorrectly all the time"

cjw2001

Quote from: I-55 on May 29, 2026, 09:55:19 AMLooks like there will be major traffic shifts coming to I-465 this weekend which will likely include opening of the new EB/SB lanes.

Only the new ramp opened for now.  They will be demolishing the old ramp bridge June 1 to 3 then the rest of the I 465 traffic shift will likely be June 5.  This is based on the future construction notices on the Traffic Wise site.

Once the old bridge is demolished they can then start work on the remaining bits of the unfinished I 465 East to I 69 North ramp.  For now traffic to I 69 is temporarily using the newly opened loop ramp that will be only for 82nd street traffic in the final configuration.

I-55

Quote from: cjw2001 on May 31, 2026, 12:53:56 AM
Quote from: I-55 on May 29, 2026, 09:55:19 AMLooks like there will be major traffic shifts coming to I-465 this weekend which will likely include opening of the new EB/SB lanes.

Only the new ramp opened for now.  They will be demolishing the old ramp bridge June 1 to 3 then the rest of the I 465 traffic shift will likely be June 5.  This is based on the future construction notices on the Traffic Wise site.

Once the old bridge is demolished they can then start work on the remaining bits of the unfinished I 465 East to I 69 North ramp.  For now traffic to I 69 is temporarily using the newly opened loop ramp that will be only for 82nd street traffic in the final configuration.

The striping crew threw me off a bit. On the Clear Path and Finish Line projects, new pavement markings didn't get striped until the weekend that the those lanes opened. Only off by a week though so not a huge deal and happy to see the road finally open up.
Purdue Civil Engineering '24
Quote from: I-55 on April 13, 2025, 09:39:41 PMThe correct question is "if ARDOT hasn't signed it, why does Google show it?" and the answer as usual is "because Google Maps signs stuff incorrectly all the time"

Great Lakes Roads

https://www.in.gov/indot/about-indot/central-office/welcome-to-the-greenfield-district/greenfield-district-current-projects/s.r.-28-and-s.r.-213-roundabout-project/

QuoteThe Indiana Department of Transportation (INDOT) is proposing to improve the intersection of S.R. 28 and S.R. 213 near the Town of Hobbs in Tipton County by constructing a single-lane roundabout. The project is expected to improve safety by reducing the number and severity of crashes at the intersection.

Construction is expected to begin in spring 2027 and last one year. During construction, S.R. 28 and S.R. 213 will be closed for approximately 6 months at a time. Signed detours will be provided.

The proposed roundabout is designed to accommodate large trucks and farm equipment and will include updated signage, pavement markings, and drainage.
-Jay Seaburg