After the July 4th holiday weekend, INDOT plans to open its first Quadrant Roadway intersection  at SR 930 and Maplecrest Road in Allen County.

https://www.facebook.com/INDOTNortheast/videos/1007507845361057/

 


74/171FAN


Apparently variable speed limits are banned in Indiana now.
I am now a PennDOT employee.  My opinions/views do not necessarily reflect the opinions/views of PennDOT.

Travel Mapping: https://travelmapping.net/user/?units=miles&u=markkos1992
Mob-Rule:  https://mob-rule.com/user/markkos1992

TheCatalyst31

Quote from: 74/171FAN on July 18, 2026, 03:53:03 PM

Apparently variable speed limits are banned in Indiana now.
Indiana legislators looking out for our right to drive too fast in a work zone, I see.

Great Lakes Roads

Quote from: 74/171FAN on July 18, 2026, 03:53:03 PM

Apparently variable speed limits are banned in Indiana now.

So... what happens to the FlexRoad project on the Borman (80/94)? Is that project still a green light to go to construction?
-Jay Seaburg

Clinched States (Interstates): AL, AZ, DE, FL, HI, KS, MI, MN, NE, NH, RI, VT, WI

Revive 755

Quote from: TheCatalyst31 on July 18, 2026, 11:56:17 PMIndiana legislators looking out for our right to drive too fast in a work zone, I see.

If they were truly doing that they would not have approved the photo enforcement program, or voted to rescind it this past session.

Quote from: Great Lakes Roads on July 19, 2026, 01:08:49 AMSo... what happens to the FlexRoad project on the Borman (80/94)? Is that project still a green light to go to construction?

I don't know how exactly it works, but most likely INDOT will probably file some paperwork to take out the variable speed limits and build the rest of the FlexRoad project.  Or they could try changing them to advisory speeds.

webny99

A major crash has caused a closure of US 31 NB north of Westfield, causing significant delays:
https://fox59.com/indiana-news/us-31-nb-closed-due-to-overturned-semi-in-hamilton-county/

theline

The South Bend Street Department is finishing up a complete facelift of Ireland Road between Ironwood Drive and Main Street. The traffic disruption has been a major headache to nearby residents, like me, and the many business along the well-traveled route, but it's great to have new curbs and a smooth driving surface.

Since I had to travel the route almost daily, I've kept close watch on the progress. One thing puzzled me about the lane-striping procedure, which I hope can be cleared up by someone more knowledgeable. I noticed the stripes appear overnight, and the next day along came a machine that appeared to scrape off the paint, rendering the bright yellow stripes a dull gray. The next day bright yellow stripes reappeared. The new stripes look like they could be tape rather than paint.

Can anyone explain this procedure? It seems to be time consuming and more expensive than just leaving the stripes that were first painted.

thenetwork

What you saw pre-dusk was likely the contractor laying down temporary lines to at least get the lanes open.

The scraper grinds a little off the top so that any raised thermoplastic line applications can not only stick better to the road surface, but to be slightly be under the surface so snow plows don't accidentally scrape them off in the winter.

That is the answer in a nutshell.  Feel free to elaborate.

NWI_Irish96

Quote from: theline on July 30, 2026, 07:25:26 PMThe South Bend Street Department is finishing up a complete facelift of Ireland Road between Ironwood Drive and Main Street. The traffic disruption has been a major headache to nearby residents, like me, and the many business along the well-traveled route, but it's great to have new curbs and a smooth driving surface.

Since I had to travel the route almost daily, I've kept close watch on the progress. One thing puzzled me about the lane-striping procedure, which I hope can be cleared up by someone more knowledgeable. I noticed the stripes appear overnight, and the next day along came a machine that appeared to scrape off the paint, rendering the bright yellow stripes a dull gray. The next day bright yellow stripes reappeared. The new stripes look like they could be tape rather than paint.

Can anyone explain this procedure? It seems to be time consuming and more expensive than just leaving the stripes that were first painted.

Spent a lot of time on that segment of Ireland while growing up in Bremen.
Indiana: counties 100%, highways 100%
Illinois: counties 100%, highways 61%
Michigan: counties 100%, highways 56%
Wisconsin: counties 86%, highways 23%

Jim

For everyone who complains about conditions of the roads you travel: I-70 across Indiana is probably worse.
Photos I post are my own unless otherwise noted.
Signs: https://www.teresco.org/pics/signs/
Travel Mapping: https://travelmapping.net/user/?u=terescoj
Counties: http://www.mob-rule.com/user/terescoj
Twitter @JimTeresco (roads, travel, skiing, weather, sports)

nwi_navigator_1181

#3910
Work on one of the bigger aspects of the "80/94 FlexRoad" Project begins this upcoming week.

Weather permitting, crews will close two lanes of I-80/94 in both directions between Grant Street and I-65 for lane shifting during the overnight hours of August 13. Also during that time, the ramps from north- and southbound Broadway (Indiana 53) to I-80/94 eastbound, along with the ramp from I-80/94 eastbound to Broadway will close.

After that, there will be alternating lane closures on Broadway to accommodate new turn lanes and signal installation. When work finishes in November, the ramp from northbound Broadway to I-80/94 eastbound will be permanently removed, replaced with a left turn entry ramp linked to the existing southbound loop ramp.

As work progresses, Broadway traffic looking to enter I-80/94 eastbound will be directed to use I-80/94 westbound to utilize the Grant Street interchange for eastbound entry. Eastbound I-80/94 traffic looking to exit to Broadway will be directed to use the Central Avenue ramp (east of I-65) then enter I-80/94 westbound to return to Broadway.

The reason: the work is part of a broader plan to facilitate safer movements for I-80/94 eastbound traffic between Grant Street and I-65. This includes extending the current auxiliary lane between Grant Street and Broadway to i-65. Traffic merging from Broadway will create a THIRD lane for I-65 southbound traffic, with the far right through lane on I-80/94 becoming an option lane. A new fourth lane will open east of Broadway, with new APL signage and interstate shield pavement markings guiding traffic through, along with more dynamic overhead signage warning far left lane drivers to merge right east of Central Avenue.

This portion of the project will be open to traffic by November, with substantial completion set for mid-2027.

Unrelated quick note: Any of you on here who travel further east on I-80/94 may have noticed a lack of activity at the Indiana 51 (Ripley Street) interchange. INDOT says it was due to an unforeseen engineering snafu, and they expect work on the interchange and bridge improvement project to resume soon.
"Slower Traffic Keep Right" means just that.
You use turn signals. Every Time. Every Transition.

ibthebigd

I-70 near Richmond might be closed for awhile because of flooding damage.

cjw2001

Quote from: ibthebigd on August 13, 2026, 04:59:08 AMI-70 near Richmond might be closed for awhile because of flooding damage.

From INDOT:

The Indiana Department of Transportation announces repairs on the flood damaged section of I-70 westbound are ongoing in Wayne County. The goal is for crews to reopen the interstate at some point on Friday, August 14.

During this time, both lanes of I-70 westbound remain closed near Centerville at mile marker 146. Heavy rains and flooding washed a section of the road away.

Due to other roads reopening, INDOT is adjusting the detour to follow U.S. 27 southbound, U.S. 40 westbound, State Road 1 northbound, and back on I-70 westbound.

Great Lakes Roads

https://fox59.com/indiana-news/speed-limit-to-increase-in-part-of-clear-path-construction-zone/

The speed limit will be going up from 45 to 55 mph on I-465 eastbound through the Clear Path construction zone.

Once the project is complete, the speed limit will increase to 65 mph on I-465 and I-69, although speed limits will be lowered as needed for other construction projects.

Later this month, crews will open a new ramp within the I-465/I-69 interchange.

The ramp will carry eastbound I-465 and northbound Binford Boulevard traffic directly to 82nd Street.
-Jay Seaburg

Clinched States (Interstates): AL, AZ, DE, FL, HI, KS, MI, MN, NE, NH, RI, VT, WI

silverback1065

Quote from: Great Lakes Roads on August 14, 2026, 03:43:25 AMhttps://fox59.com/indiana-news/speed-limit-to-increase-in-part-of-clear-path-construction-zone/

The speed limit will be going up from 45 to 55 mph on I-465 eastbound through the Clear Path construction zone.

Once the project is complete, the speed limit will increase to 65 mph on I-465 and I-69, although speed limits will be lowered as needed for other construction projects.

Later this month, crews will open a new ramp within the I-465/I-69 interchange.

The ramp will carry eastbound I-465 and northbound Binford Boulevard traffic directly to 82nd Street.

it feels like this project has been going on for 400 years  :-D

tdindy88

Quote from: silverback1065 on August 14, 2026, 08:11:06 AM
Quote from: Great Lakes Roads on August 14, 2026, 03:43:25 AMhttps://fox59.com/indiana-news/speed-limit-to-increase-in-part-of-clear-path-construction-zone/

The speed limit will be going up from 45 to 55 mph on I-465 eastbound through the Clear Path construction zone.

Once the project is complete, the speed limit will increase to 65 mph on I-465 and I-69, although speed limits will be lowered as needed for other construction projects.

Later this month, crews will open a new ramp within the I-465/I-69 interchange.

The ramp will carry eastbound I-465 and northbound Binford Boulevard traffic directly to 82nd Street.

it feels like this project has been going on for 400 years  :-D

That's what happens when you have to keep the interchange open to traffic the whole time. Closing this whole area down was never possible but it could have allowed the construction crews to build the entire thing more quickly.

seicer

I can't seem to find the proposed work for the Interstate 465 / Keystone Avenue/Parkway interchange. Is this an improvement of what's already built?

cjw2001

Quote from: seicer on August 14, 2026, 09:59:29 AMI can't seem to find the proposed work for the Interstate 465 / Keystone Avenue/Parkway interchange. Is this an improvement of what's already built?
I'm not aware of any plans to modify the existing interchange.

silverback1065

It is a project, I remember seeing it digging around in the public documents on INDOT's website looking for something else. All it says is "interchange modification" along with a list of other major projects happening in the coming years in Marion County.  :hmmm:  maybe it has something to do with southbound traffic getting onto 465? I think that is the worst movement during rush hour but who knows.