State Road 46 travels east from U.S. 441 at Mt. Dora to U.S. 1 at Mims. A small section of Lake County 46 spurs west from U.S. 441 (Orange Blossom Trail) to Old County 441 east of Downtown Mt. Dora. The shared alignment with U.S. 17 & 92 (French Avenue) through Sanford is unsigned; instead trailblazers are posted at each end for the continuation of Florida 46.

Florida 46 Highway Guides

Construction associated with Sections 3A and 3B for the Wekiva Parkway expand SR 46 east from U.S. 441 at Mt. Dora to a six-lane arterial. Started on October 30, 2017, work on Section 3B removes the diamond interchange at the west end of SR 46 and adds a two-lane flyover from U.S. 441 south to the state road east. Section 3A widens 1.4 miles of SR 46 east from Section 3B to the exchange with SR 453 (Mt. Dora Connector). Both projects run through spring 2020.

Additionally the March 31, 2018 opening of the Mt. Dora Connector (SR 453) northwest from Orange County to SR 46 west of Sorrento, coincides with the decommissioning of SR 46 through Sorrento and Mt. Plymouth. A portion of the route will be repurposed as a frontage road.

Section 6 construction of Wekiva Parkway east from near Mt. Plymouth to Longwood Markham Road in Seminole County directly overlays three sections of SR 46. The design-build project commenced on June 29, 2017 and wraps up in spring 2021. Further east, Section 7A upgrades existing SR 46 into the Wekiva Parkway mainline and a new frontage road system to Orange Avenue (CR 431). Section 7A work commenced in spring 2018 and ends in 2022.

The Wekiva Parkway will travel southeast away from SR 46 at Orange Avenue along Section 8 to connect with Interstate 4 at the Seminole Expressway (SR 417). Section 7B construction, projected to run for 24 months from a start date in 2019, six-lanes the remaining 1.87 miles of SR 46 east from SR 429 to I-4.


Florida 46 scenes
International Parkway leads south from SR 46 to Heathrow. The four-lane arterial links the state road with Wayside Drive here, and SR 417 further south to Winter Springs and Oviedo. Photo taken 07/31/14.
An overhead precedes the intersection joining International Parkway north with SR 46 west of Sanford. Photo taken 07/31/14.
SR 46 heads a half mile east from International Parkway to Interstate 4 and west 1.25 miles to the future Wekiva Parkway (SR 429). Photo taken 07/31/14.
Martin Luther King, Jr. Boulevard was constructed from 2006 to 2008 as a new four-lane arterial replacing Airport Boulevard (CR 425) as the main through route north from H.E. Thomas, Jr. Parkway (CR 46A) to SR 46 in Sanford. Photo taken 02/29/08.
Martin Luther King Jr. Boulevard intersects SR 46 across from Rand Yard Road. SR 46 comprises a four-lane, divided arterial west to Seminole Towne Center mall and I-4 and east to U.S. 17/92 (French Avenue) outside Downtown Sanford. Photo taken 02/29/08.



Photo Credits:

02/29/08, 07/31/14 by AARoads

Connect with:
Interstate 4
U.S. 1
U.S. 17
U.S. 92
U.S. 441
Florida 415 / County Road 415
Florida 429 - Western Beltway / Apopka Expwy / Wekiva Pkwy
County Road 46A - H.E. Thomas, Jr. Pkwy / 25th St
Lake County Road 46A