
West
Construction on the southeastern leg of the Winston-Salem Beltway, from NC 192 north to U.S. 421 (Salem Parkway) continues to November 2026. I-74 will meet Interstate 40 at Exits 56 B/A.
07/30/26
A multi-level systems interchange joins the Winston-Salem Beltway with Interstate 40.
07/30/26
Exit 56 A is a loop ramp connecting I-74 west with Interstate 40 west into Winston-Salem.
07/30/26
07/30/26
07/30/26
07/30/26
07/30/26
07/30/26
07/30/26
Page Updated Thursday August 13, 2026.