![](https://www.aaroads.com/wp-content/uploads/hwymarkers/oh-i-090.png)
![Interstate 90](https://www.aaroads.com/wp-content/uploads/routemarkers/ih-090.png)
![](/oh/090/thb/i-090-w-exit-205-3.jpg)
Preceding Paine Creek, a reassurance shield for Interstate 90 west stands by mile marker 206.7.
06/14/10
![](/oh/090/thb/i-090-w-exit-205-5.jpg)
Vrooman Road heads south from Exit 205 to a roundabout with SR 86 and Huntoon Road at Five Points.
06/14/10
![](/oh/090/thb/i-090-w-exit-205-6.jpg)
North from I-90, Vrooman Road continues across the Grand River to SR 84 at Lane Road in Perry Township.
06/14/10
![](/oh/090/thb/i-090-w-exit-200-4.jpg)
SR 44 constitutes a freeway spurring north from Exit 200 to Painesville and SR 2 in Painesville Township.
06/14/10
![](/oh/090/thb/i-090-w-exit-200-6.jpg)
Interstate 90 west enters the parclo interchange (Exit 200) with SR 44 by the Quail Hollow Country Club golf course community in Concord Township.
06/14/10
![](/oh/090/thb/i-090-w-exit-200-7.jpg)
Points of interest for Exit 200 include Auburn Career Center to the south along Auburn Road, the Lake County Fairgrounds along U.S. 20 in Concord Township and Lake Erie College off U.S. 20 (Mentor Avenue) in Painesville.
06/14/10
![](/oh/090/thb/i-090-w-exit-195-4.jpg)
Forthcoming SR 615 loops east from SR 306 in Kirtland to SR 283 along the Mentor and Mentor-on-the-Lake city line.
06/14/10
![](/oh/090/thb/i-090-w-exit-195-5.jpg)
South from the diamond interchange at Exit 195, SR 195 follows Center Street onto Chillicothe Road through the village of Kirtland Hills.
06/14/10
![](/oh/090/thb/i-090-w-exit-195-6.jpg)
Center Street extends north through Mentor past the Mentor Civic Center to become Hopkins Road en route to SR 283 (Lakeshore Boulevard) by Mentor Lagoons Nature Preserve.
06/14/10
![](/oh/090/thb/i-090-w-exit-193-1.jpg)
SR 306 converges with I-90 where the city limits of Kirtland, Mentor and Willoughy come together at Exit 193.
06/14/10
![](/oh/090/thb/i-090-w-exit-193-2.jpg)
SR 306 (Broadmoor Road) north connects with U.S. 20 (Mentor Avenue) east to Great Lakes Mall and the James A. Garfield National Historic Site in Mentor.
06/14/10
![](/oh/090/thb/i-090-w-exit-190-1.jpg)
Continuing west from the diamond interchange at Exit 193, Interstate 90 enters the city of Willoughby.
06/14/10
![](/oh/090/thb/i-090-w-exit-190-2.jpg)
I-90 crosses the Chagrin River East Branch and Waite Hall city line beyond this distance sign for the Express/Local exits to Interstate 271.
06/14/10
![](/oh/090/thb/i-090-w-exit-190-3.jpg)
The I-271 Express Lanes commence in two miles on the left ahead of the Maplegrove Road overpass in Willoughby Hills.
06/14/10
![](/oh/090/thb/i-090-w-exit-190-4.jpg)
I-271 comprises a suburban bypass of Cleveland south to SR 8 at Macedonia and I-77 at Richfield. Both routes head south to Akron.
06/14/10
![](/oh/090/thb/i-090-w-exit-190-5.jpg)
The I-271 Express Lanes constitute the inner roadways of the freeway south to U.S. 422 (Chagrin Boulevard) and I-480N at Warrensville Heights.
06/14/10
![](/oh/090/thb/i-090-w-exit-190-6.jpg)
I-271 converges with I-71 at Medina Township. Interstate 71 joins Cleveland with Columbus and Cincinnati.
06/14/10
![](/oh/090/thb/i-090-w-exit-189-1.jpg)
SR 91 runs south from Willoughby to a parclo interchange (Exit 189) with I-90 in Willoughby Hills.
06/14/10
![](/oh/090/thb/i-090-w-exit-188-1.jpg)
The mainline of I-90 west defaults onto Interstate 271 south at a directional T interchange (Exit 188) in Willoughby Hills.
06/14/10
![](/oh/090/thb/i-090-w-exit-188-3.jpg)
I-271 leads south from Willoughby Hills to Highland Heights, Mayfield and Mayfield Heights. I-90 turns west along the Wickliffe city line to Euclid.
06/14/10
![](/oh/090/thb/i-090-w-exit-187-2.jpg)
SR 84 (Bishop Road) south to U.S. 6 (Chardon Road) west connects I-90 with SR 175 (Richmond Road) to Cuyahoga County Airport (CGF).
06/14/10
![](/oh/090/thb/i-090-w-exit-187-6.jpg)
I-90 curves northwest from the diamond interchange (Exit 187) with SR 84 (Bishop Road) to meet U.S. 20 at Exit 186 along the Euclid city line.
06/14/10
![](/oh/090/thb/i-090-w-exit-186-1.jpg)
Having paralleled Interstate 90 to the north from North East, Pennsylvania near the New York state line, U.S. 20 finally meets I-90 at Exit 186 along Euclid Avenue.
06/14/10
![](/oh/090/thb/i-090-w-exit-185-1.jpg)
Interstate 90 curves westward into the directional T interchange (Exit 185) with SR 2 (Lakeland Freeway).
06/14/10
![](/oh/090/thb/i-090-w-exit-185-2.jpg)
The entrance ramp from U.S. 20 (Euclid Avenue) joins I-90 westbound just beyond the Cuyahoga County line.
06/14/10
![](/oh/090/thb/i-090-w-exit-185-3.jpg)
SR 2 along the Lakeland Freeway extends northeast from Exit 185 to U.S. 20 beyond Painesville.
06/14/10
Photo Credits:
06/14/10 by AARoads
Connect with:
Interstate 271
Page Updated 03-24-2024.