Spokane is a city of over 200,000 located along the Spokane River in eastern Washington. The regional service center was founded in 1871 and incorporated on November 29, 1881. This guide looks at some of the roads serving Washington’s second largest city.

Interstates

Interstate 90

Guides:

Interstate 90

Proposals for the eventual Interstate 90 through Spokane included a corridor along Riverside Avenue and Main Street through downtown and a tunnel under South Hill among the current viaduct alignment south of downtown. The first portion of Interstate 90 completed in the Spokane area consisted of a five mile stretch of the Spokane Valley Freeway from Custer Road (the former Havana Street exit) to Pines Road (Exit 289). A ceremony opened that stretch of freeway on Nov. 16, 1956. Two additional sections followed with completion in Spokane Valley before Spokane received its first segment in 1958.17 Costing $12.1 million, the freeway initially linked Sherman Avenue to Appleway near Liberty Lake.1 Interstate 90 was formally designated for the freeway on June 5, 1959.17

Delays for additional construction of Interstate 90 surrounded the lawsuit filed by Deaconess Hospital in 1963. Administrators contended that noise from the freeway would disturb patients and initially the suit was successful, but a June 7, 1965 Washington Supreme Court ruling overturned that decision, allowing crews to resume work on the viaduct, which opened officially on September 25, 1969.17

$62.5 million in road work expanded Interstate 90 between Havana Street and Argonne Road (Exit 287) as part of a four stage project. The first phase redesigned the intersection of Sprague Avenue and Fancher Road to accommodate the new westbound off-ramp (Exit 285) from I-90. That work was finished Fall 1997. The second phase of road work, started August 31, 1998, involved adding a third eastbound lane from the Havana Street on-ramp to Broadway Avenue (Exit 286) and rebuilding the Sprague Avenue eastbound off-ramp to eliminate a sharp curve. The new ramp eventually formed the eastbound beginning of the $18.7 million Valley Couplet project5 (completed October 11, 2000), which saw construction of a new four-lane roadway (Appleway Boulevard) east to match the conversion of Sprague Avenue into a four-lane westbound roadway. Further work eliminated the Havana Road westbound off-ramp and the loop ramp from Sprague Avenue east onto I-90 east, with motorists redirected onto a new portion of Theirman Road to the Broadway Avenue interchange.2,5

The third phase of the $62 million project included $22 million to add a lane in each direction of Interstate 90 between the Broadway Avenue and Argonne Road interchanges, including a new five lane overpass for Park Road over I-90. $25 million in construction, beginning on October 14, 2000, accounted for the final phase of work, building of a westbound lane between the Broadway and Sprague Avenue interchanges and the addition of a new westbound off-ramp onto Fancher Road north.2 All work was finished by October 15, 2001.6

A loop ramp (opened June 2, 2002) was added to Interstate 90 west from Sullivan Road north at Exit 291 B as part of a $1.8 million project. The project was similar to a $1.7-million addition of a loop ramp from Harvard Road (Exit 290) north onto I-90 west at Liberty Lake.3 These improvements coincided with construction of a new interchange (Exit 291 A) with Evergreen Road by Spokane Valley Mall, which opened in 1997. That work also included expanding Evergreen Road from a two-lane street into a five-lane arterial. The $23.4 million project was completed on May 4, 2001.4,7

Widening of Interstate 90 between Argonne Road (Exit 287) and Sullivan Road (Exit 291B) through Spokane Valley added a lane in each direction from August 2003 to November 15, 2005. The project cost $37-million.8,15 A $4.5 million project between 2007 and 2009 reconfigured the westbound ramps at Pines Road (Washington 27) to tie into parallel Indiana Avenue rather than Washington 27, 150 feet south of its intersection with Indiana Avenue. This followed work on the south side of the interchange in 1997.16.

The downtown Spokane viaduct of Interstate 90 was refurbished as part of a two phase $13 million project in 2006 and 2007. $19 million in work to further expand Interstate 90 to six lanes took place between Sullivan Road (Exit 291 B) and Barker Road (Exit 293) from March 28, 2011 to November 2011.19,21

Business Loop I-90

Guides:

Business Loop I-90

Two Business Loops for Interstate 90 serve the Spokane metropolitan area. The first is a sparsely signed route follow most of old U.S. 10. Beginning at Exit 276, the route follows Grove Road north to Geiger Boulevard, where the route overtakes the former U.S. 10 eastward into Spokane along a combination of Geiger, Sunset Boulevard and 2nd/3rd Avenues. Sprague Way carries the unsigned route from the couplet of 2nd and 3rd onto Sprague Avenue below SR 290. Sprague Avenue then continues Business Loop I-90 east into Spokane Valley and Exit 285, where the designation concluded.

As approved by AASHTO (American Association of State Highway and Transportation Officials) on May 5, 2013, an extension of the Business Loop for Interstate 90 takes the route through Spokane Valley, following the Valley Couplet of Appleway Boulevard (east) and Sprague Avenue (west) to University Road at Dishman. Sprague Avenue continues east from there as a two way arterial, doubling as Business Loop I-90 through to Appleway Avenue, which returns the business route northeast to Interstate 90 at Exit 294.

U.S. Highways

U.S. 2

Guides:

Sunset Hwy / Browne St / Division St

U.S. 2 follows Sunset Highway east from Airway Heights to Spokane International Airport (GEG), where the route turns southeast onto a freeway connecting with Interstate 90. I-90 doubles as both U.S. 2 and U.S. 395 from Exits 277 to 281, where U.S. 2/395 depart for the couplet of Browne and Division Streets east of downtown. U.S. 2/395 remain together along Division Street or its couplet with Browne and Ruby Streets, through to a split near Country Homes in north Spokane. There U.S. 2 turns easterly to meet the North Spokane Corridor by Mead before resuming a northward heading to Chattaroy and Newport.

Sunset Boulevard (and Sunset Highway west of Geiger Boulevard) represents the former surface alignment of U.S. 2 leading into Spokane from the west. The route doubles as former U.S. 10/395 eastward onto 3rd Avenue through downtown.

Former U.S. 10

Guides:

Former U.S. 10

Prior to the Interstate system, U.S. 10 was the main east-west route through eastern Washington, joining Spokane with Seattle to the west and Coeur d’Alene, Idaho to the east as part of a 2,246 mile course between the Emerald City and Manitowoc, Wisconsin. Completion of Interstate 90 replaced the route, leading to truncations eastward starting in 1969 with the portion from Spokane to Seattle and in 1971 from Coeur d’Alene, Idaho to Spokane.

Within the Spokane area, U.S. 10 traveled Geiger Boulevard northeast with U.S. 395, a roadway that remains partially a service road to Interstate 90 and independent of the freeway as a Business Loop for I-90 through to Sunset Boulevard. Sunset Boulevard was old U.S. 2, and together U.S. 2-10-395 combined into western reaches of Spokane to 3rd Avenue. U.S. 195 also joined the fray from Inland Empire Way.

East into downtown Spokane, U.S. 2-10-195-395 followed 3rd Street to Division Street, where the trio broke off to the north while U.S. 10 remained along 3rd Avenue to Sherman Street. Sherman Street took the route four blocks north to Sprague Avenue, its alignment eastward to East Spokane, Dishman, Opportunity through what is otherwise known as Spokane Valley. U.S. 10 branched northward from Sprague Avenue at Greenacres for Appleway Avenue east into Liberty Lake, follow that roadway northeast to Seltice Way in Idaho. A portion of that route was severed by construction of Interstate 90 between Exits 294 and 296 and again at Exit 299.

Former U.S. 195

Guides:

Former U.S. 195

U.S. 195 joins Spokane with Spangle, Rosalia, Colfax and Pullman to the south. The route follows a four lane divided expressway southward from its beginning at Interstate 90 (Exit 279) to a point just north of Spangle. The route travels just 95 miles overall to an end at U.S. 95 just northwest of Lewiston, Idaho.

A $6.4 million project started in January 2013 to construct an interchange with U.S. 195 (Inland Empire Way) with Cheney-Spokane Road. This followed the addition of a southbound exit lane from U.S. 195 to Cheney-Spokane Road added in 2010. Work here is part of a WSDOT effort to preserve the corridor through Spokane as a freeway, which includes $71 million in construction for an underpass at 16th Avenue, an overpass at Thorpe Road and interchanges at Meadowlane and Hatch Roads.25

Historically U.S. 195 was the sole route from north Spokane to Sandpoint, Idaho. An extension of U.S. 2 west from Bonners Ferry, Idaho to Everett was made in 1948, leading to a 20 plus year time period of shared alignments with U.S. 195 southwest from Sandpoint to Spokane. U.S. 195 was signed along side U.S. 2/395 along Division Street and U.S. 2-10-395 west from Division Street until 1969, when it was truncated to Inland Empire Way and Sunset Boulevard.

U.S. 395

Guides:

U.S. 395

The highway enters Spokane coupled with Interstate 90, from Ritzville to the southwest, to the couplet of Browne and Division Streets with U.S. 2, east of downtown Spokane. U.S. 2/395 overlap along Division Street or Division Street with Browne and Ruby Streets northward through the Spokane street grid to the Country Homes community. There U.S. 2 veers eastward toward Mead while U.S. 395 remains on a northward course to Wandermere. Widening of U.S. 395 from just north of the Little Spokane River occurred on a four-mile stretch as part of a $7.4 million project in 1999.9 Eventually U.S. 395 will leave this overlap for the North Spokane Corridor, a 10-mile freeway planned to link Wandermere with Interstate 90 at East Central Spokane.

North Spokane Corridor

First considered in 1946 and estimated to cost $13 million in 1956, proposals for the North Spokane Freeway in 1995 cited an estimated cost of $2.1 billion for a ten-mile freeway. This included expansion of 3.5 miles of Interstate 90 to accommodate movements to the new route.10,11

The 1956 concept focused on the Hamilton-Nevada corridor, but was halted due to community opposition from East Central residents citing a division of their neighborhood. In 1967, the Hamilton-Nevada corridor was again the focus of a freeway proposal per a $400,000 study and an increase in the state gas tax. A public meeting held at the Spokane Coliseum in 1970 on the corridor mostly met with negative public feedback, but an advisory vote undertaken in 1973 resulted in a 58% approval by Spokane voters. The next year the North Spokane Freeway was shelved due to both a lack of construction money and continued strong opposition.

Desire for the freeway remained with surveys conducted in 1983, 1986 and 1987 showing more than 80% of respondents listing it as important or very important, favoring the new road over a new arena or other public project. Supporters realized that a freeway along the Hamilton-Nevada corridor was unlikely by 1985 and an effort to resurrect the North-Spokane Freeway in 1987 coincided with an attempt to raise the gasoline tax. A tax increase in 1991 paid for a new study, focusing on the Havana or Market Street corridors.12

A 1997 environmental impact statement revised the project as the North Spokane Corridor, citing an estimating $857 million price tag. $122 million in funding over a six year period was approved by Referendum 49 in 1998, which set aside $2.4-billion funding for transportation projects statewide. However Initiative 695 approved by voters in November 1999 cut the transportation budget by a third, eliminating the revenue stream needed to pay for Referendum 49 projects. This cut off the majority of funding for the North Spokane freeway, estimated to cost $892-million and take 20 years to build in 1999.13.

$22-million was appropriated for the North Spokane Freeway by the Department of Transportation in 1999 for right of way acquisition. Initial work on the project involved a $3.5 million contract for grading and drainage between U.S. 2 and Hawthorne Road. A groundbreaking ceremony took place on August 22, 2001.14 Eight years later, a ribbon cutting ceremony took place on August 22nd on the 3.7 mile long stretch of freeway from Freya Street, north of Francis Avenue, to Farwell Road. Expenditures tallied $532-million on the North Spokane Corridor at that time with an estimated $1.6-billion needed to complete the roadway.18

Ramps opened between U.S. 2 (Newport Highway) and the North Spokane Corridor on November 9, 2011. This allowed drivers to access the 3.7-mile freeway southward to Freya Street. The $43 million interchange took three years to construct and included lowering the grade of U.S. 2.20 Work to complete the northernmost segment of the freeway concluded on June 13, 2012 when two miles of roadway opened between U.S. 395 by Wandermere and U.S. 2.24

North Spokane Corridor sign

The northbound beginning of the North Spokane Corridor beyond Freya Street. Signs along the route refer to the freeway as Future U.S. 395. Photo taken by Jeff Royston (07/11/13).

Six elements of $328 million in road work remain for the freeway from Freya Street southward to the Spokane River. The first of those projects is the building of a new Francis Avenue overpass at Hillyard. Work on that $38 million project commenced in 2012.22

State Routes

Washington State Route 27

Guides:

State Route 27 – Pines Road

Washington State Route 27 originates at the intersection of Trent Avenue (SR 290) and Pines Road in Spokane Valley. The state route leads south to an interchange (Exit 289) with Interstate 90 and as a busy arterial route from there through Opportunity and central Spokane Valley. The 90 mile long highway meanders south from the Spokane area to Oakesdale, Garfield, Palouse and Pullman. SR 27 ended at I-90 until 1991, when the extension to SR 290 was made.

Washington State Route 206

Guides:

State Route 206 – Mount Spokane Park Drive

Traveling 15.3 miles, Washington State Route 206 follows Mount Spokane Park Drive northeast from U.S. 2 near Mead, to Mount Spokane State Park.

Washington State Route 290

Guides:

State Route 290 – Trent Avenue

SR 290 follows Trent Avenue west from Idaho State Highway 53 by Otis Orchards through northern reaches of Spokane Valley to Millwood and Orchard Park in Spokane. The state route turns south at Hamilton Street along a short freeway connector leading to Interstate 90.

Washington State Route 291

Guides:

State Route 291 – Francis Avenue / Nine Mile Road

Washington State Route 291 travels 33.1 miles from the intersection of Division Street and Francis Avenue in Spokane to SR 231, mostly along the course of the Spokane River and Long Lake.

Spokane area roads

Ash Street - South
Ash Street southbound at Maxwell Avenue. Ash Street south along with Maple Street north constitutes a through route couplet from West Central Spokane northward to Country Homes Boulevard near Town And Country. Maxwell Avenue leads west to becomes Pettet Drive along the Spokane River. 09/01/06
Ash Street prepares to split with the Maple Street connector south of Boone Avenue. The Maple Street Bridge spans the Spokane River, linking West Central Spokane with Interstate 90. 09/01/06
Traffic splits with the final two blocks Ash Street for the Maple Street connector. 09/01/06
Maple Street - South
Following the connector from Ash Street south onto Maple Street, which switches from one way north into a four lane arterial. 09/01/06
Maple Street drops below grade and passes under Broadway Avenue along a short expressway segment leading south across the Spokane River into Peaceful Valley. 09/01/06
Just beyond the Broadway Avenue overpass is the site of the former toll plaza for the Maple Street Bridge. The Spokane River crossing was tolled until July 13, 1990.26 09/01/06
A short tunnel carries Summit Parkway and a wide right of way over the Maple Street Bridge just north of the Spokane River. 09/01/06
The Maple Street Bridge opened to traffic on July 1, 1958 after over two years of construction. The 1708 foot bridge cost $6 million to build.26 09/01/06
A viaduct extends southward from the Maple Street Bridge through Peaceful Valley to ramps with 1st Avenue at Sprague Avenue. 09/01/06
A loop ramp carries drivers from Maple Street south onto 1st Avenue east for the city center while the street splits with Walnut Street as a southbound only roadway to 2nd Avenue. 2nd Avenue, along with 3rd Avenue, represents a couplet eastward parallel to Interstate 90. Westward, the two avenues combine as Sunset Boulevard ahead of Hangman Creek. 09/01/06
Maple Street south at 3rd Avenue east. 2nd and 3rd Avenues represent an unsigned business loop for Interstate 90 east from Sunset Boulevard. 09/01/06
South from 3rd Avenue, one block remains before the departure of the westbound on-ramp to Interstate 90. Signs for the connection reference U.S. 2 west, U.S. 195 south and U.S. 395 south. U.S. 2 & 395 share pavement with I-90 through Spokane to Division Street. U.S. 195 begins at the next westbound off-ramp (Exit 279). 09/01/06
Traveling through the signalized intersection with 4th Avenue, Maple Street nears the westbound ramp for I-90/U.S. 2-395. U.S. 195 travels 95 miles to Lewiston, Idaho from I-90 southeast through Hangman Valley along an expressway leading south to Spangle. 09/01/06
Interstate 90 and U.S. 2 split ahead of Spokane International Airport, while U.S. 395 remains with the freeway southwest to Ritzville. Seattle and the west end of Interstate 90 lie 280 miles to the west.
This guide sign was replaced by 2011. 09/01/06
A split diamond interchange joins Interstate 90 & U.S. 2-395 with Maple Avenue via connections with 4th Avenue west and 5th Avenue east. The eastbound on-ramp to Idaho depart from 5th Avenue at Walnut Street, one block east of Maple Street.
A rare state-named shield for I-90 was posted at the turn onto 5th Avenue. This was replaced with a new guide sign including the control city of Coeur d'Alene by 2011. 09/01/06
Lincoln Street
A westbound off-ramp connects Interstate 90 with Lincoln Street, just south of its intersection with 3rd Avenue. 09/01/06
Three tracks of the BNSF Railroad pass over Lincoln Street on the south side of downtown Spokane. 09/01/06
Entering the Spokane city center along Lincoln Street ahead of 1st Avenue. 09/01/06
1st Avenue travels east, complimenting Sprague Avenue west, as the main routes to and from Peaceful Valley and the Maple Street Bridge to the west. 09/01/06
Sprague Avenue leads west from Lincoln Street to Riverside Avenue and the Maple Street Bridge. Eastward, the avenue connects downtown with East Central as unsigned Business Loop I-90 to East Spokane. 09/01/06
Riverside Avenue crosses Lincoln Street at the next intersection as a four lane boulevard east to U.S. 2 & 395 (Division Street north) and west to High Bridge Park and Government Way. 09/01/06
Riverside Avenue
Eastbound along Riverside Avenue at Post Street in downtown Spokane. 09/01/06
A series of sky bridges link buildings above Riverside Avenue between post and Washington Streets. This view looks eastbound at Wall Street. 09/01/06
Howard Street crosses Riverside Avenue at the next traffic light, leading north to Rotary Fountain at Riverfront Park. 09/01/06
Stevens Street forks south from Washington Street at Riverfront Park as a four lane southbound street to the Cliff Cannon neighborhood south of Interstate 90. 09/01/06
Washington Street compliments Stevens Street with four lanes northbound through the Spokane city center. 09/01/06
Bernard Street stems north from 1st Avenue and the Spokane Amtrak and Greyhound Station across Riverside Avenue to the Spokane Convention Center. 09/01/06
Next in line for Riverside Street east is Browne Street south. Browne Street doubles as U.S. 2 west & 395 south from the Division Street over the Spokane River to Interstate 90.
One block further east on Riverside Drive was the end of the street at Division Street (U.S. 2 west & 395 north). A $3.8 million project extended the roadway east from there as the new Martin Luther King, Jr. Way. The new four lane roadway serves the University District with connections to Sherman Street at a realigned Spokane Falls Boulevard. It opened initially on May 29, 2012, with a future extension to Trent Avenue at Erie Street planned.23 09/01/06
Sprague Avenue
Sprague Avenue carries three westbound lanes from St. Bernard Street to Riverside Avenue through the Spokane city center. This view looks at Howard Street. 09/01/06
Sprague Avenue merges with Riverside Avenue at Cedar Street, just ahead of the on-ramp to the Maple Street Bridge. A four lane viaduct travels above Peaceful Valley from Riverside Avenue to the Spokane River crossing. A label scar on the overhead for the bridge reveals its former existence as a toll bridge (tolls were lifted in 1990). 09/01/06
Inland Empire Boulevard
Inland Empire Way (old U.S. 195) splits with Sunset Boulevard (former U.S. 2-10-395) southwest of Cannon Street and veers southward under the former Sixth Avenue (now Sunset Boulevard east). 09/01/06
Inland Empire Way passes under a high level BNSF Railroad bridge and Interstate 90 as it parallels Hangman Creek southward. 09/01/06
Sunset Boulevard (Business Loop I-90)
Sunset Boulevard (Business Loop I-90) meanders east through the Garden Springs area to intersect Government Way at West Spokane. Government Way leads north from Lindeke Street to High Bridge Park and Spokane Falls Community College. 08/03/11
Sunset Boulevard narrows to two lanes and crosses Hangman Creek along an arch bridge parallel to both the BNSF Railroad and Interstate 90 & U.S. 2-395. 08/03/11

Sources:

  1. “How The Valley Has Grown.” The Spokesman-Review, December 15, 1994.
  2. “Lane Changes Sprague Avenue Interchange Realignment And Other I-90 Projects Starting This Summer.” The Spokesman-Review, February 13, 1997.
  3. “Sullivan interchange nearing completion.” The Spokesman-Review, June 1, 2002.
  4. “Comin’ Through – Freeway Interchange Project Will Transform Evergreen Corridor.” The Spokesman-Review, November 14, 1998.
  5. “Crews To Rebuild Sprague Interchange Work To Relieve I-90 Bottleneck Starts Monday.” The Spokesman-Review, August 30, 1998.
  6. “I-90 work to snarl traffic.” The Spokesman-Review, October 12, 2001.
  7. “Evergreen interchange now open.” The Spokesman-Review, May 5, 2001.
  8. “Valley I- 90 widening work starts Aug. 11 – $34.2 million project will add a lane each way from Argonne to Sullivan.” The Spokesman-Review, July 30, 2003.
  9. “Region Gets Money To Fix Problems Roads Federal Money Will Cover Widening U.S. 395, I-90 To Sullivan.” The Spokesman-Review, June 10, 1998.
  10. “Hearing To Examine Freeway Impact.” The Spokesman-Review, September 26, 1995.
  11. “Freeway Hearing Draws 150 Wary, Interested Show Up To Figure Impact Of Route North.” The Spokesman-Review, September 29, 1995.
  12. “North-South Freeway: Going Nowhere Fast No Action Expected On Latest Route Proposal.” The Spokesman-Review, August 27, 1995.
  13. “Freeway Hits Dead End I-695 Zaps Funding, Leaves Homeowners In Limbo.” The Spokesman-Review, November 12, 1999.
  14. “Freeway start ends long drive – After 50 years of debate, first segment of north-south freeway to get start Wednesday.” The Spokesman-Review, August 20, 2001.
  15. “I-90 widening work in Valley completed.” The Spokesman-Review, November 17, 2005.
  16. “Work on Pines, I-90 interchange set for spring – Work is expected to take five or six months.” The Spokesman-Review, October 7, 2006.
  17. “Freeway at 50 – Region’s main transportation corridor has patchwork past, uncertain future.” The Spokesman-Review, September 10, 2006.
  18. “LURE OF THE OPEN ROAD – North-south route promises economic opportunities.” The Spokesman-Review, August 23, 2009.
  19. “I-90 Widening In Valley Joins List Of Current Projects.” The Spokesman-Review, March 28, 2011.
  20. “U.S. 2, Meet Your Newest Neighbor – Interchange with corridor opens next week.” The Spokesman-Review, November 2, 2011.
  21. “Widening of I-90 Is Nearly Complete – All six lanes to open by month’s end.” The Spokesman-Review, November 7, 2011.
  22. “Overpass Freeway Project’s Next Step – Bridge will be rebuilt at Francis Avenue.” The Spokesman-Review, January 9, 2012.
  23. “MLK Jr. Way Opens Thursday.” The Spokesman-Review, May 29, 2012.
  24. “Northern Corridor Segment To Open.” The Spokesman-Review, June 11, 2012.
  25. “Getting There: U.S. 195 intersection upgrade under way.” The Spokesman-Review, January 14, 2013.
  26. The Maple Street Bridge. https://spokanehistorical.org/ Spokane Historical.

Page updated July 18, 2013.