Florida State Road 60 - West


Overhead assembly in Downtown Tampa posted above Kennedy Boulevard west ahead of Jefferson Street for SR 618 with an older Selmon Crosstown Expressway trailblazer. 08/20/06

Florida 60 follows Memorial Highway north from Kennedy Boulevard to Tampa International Airport (TPA) and Veterans Expressway. This scene shows the original freeway configuration of SR 60 leading northwest from WestShore Plaza mall and Interstate 275 toward the airport interchange. 03/05/06

Florida 60 follows Memorial Highway north from Kennedy Boulevard to Tampa International Airport (TPA) and Veterans Expressway. This scene shows the original freeway configuration of SR 60 leading northwest from WestShore Plaza mall and Interstate 275 toward the airport interchange. 12/28/06

The stretch of SR 60 freeway west to Courtney Campbell Causeway was one of the most congested throughout Tampa. This led to a complete rebuild between 2005-10. 01/19/08

The stretch of SR 60 freeway west to Courtney Campbell Causeway was one of the most congested throughout Tampa. This led to a complete rebuild between 2005-10. 12/28/06

High flyovers were constructed between Florida 60 (Memorial Highway) and George J. Bean Parkway, the access road to TPA Airport, to replace slower speed movements. This work also removed some of the weaving traffic patterns that plagued the original Memorial Highway freeway mainline. 03/25/07

High flyovers were constructed between Florida 60 (Memorial Highway) and George J. Bean Parkway, the access road to TPA Airport, to replace slower speed movements. This work also removed some of the weaving traffic patterns that plagued the original Memorial Highway freeway mainline. 11/10/07

A look at the ramp departure for George J. Beach Parkway from Florida 60 (Memorial Highway) west. Two lanes form the parkway beginning at Florida 616 (Spruce Street), a state road that ties in from the east but was previously not accessible from Florida 60 west. 12/28/06

A previous scene showing SR 60 west approaching the beginning of the Veterans Expressway (SR 589) north at an at-grade intersection. 12/21/03

SR 60 expanded to five lanes on the final approach to SR 589 north. A traffic signal once governed movements between the two state roads. 01/01/06

Eisenhower Boulevard, the frontage road system of the fledgling Veterans Expressway, began via the off-ramp at Exit 3. Eisenhower Boulevard represents the original expressway connection (old SR 589) to Hillsborough Avenue (SR 580) from SR 60. 08/20/06

Florida 589 began at what was a wye interchange and at-grade connection with the departing Florida 60 west. The toll road winds north into Pasco and Hernando Counties as the Suncoast Parkway. 08/20/06

Motorists from Courtney Campbell Causeway east onto SR 589 north crosses SR 60 west at the traffic signal. A painted chevron was all that separated high speed traffic to the right from stopped drivers to the left. 05/27/05

A parclo interchange was constructed just west of Memorial Highway along SR 60 at Bayport Drive. 11/10/07

The ramps to Bayport Drive replaced a signalized intersection. The upgrade eliminated another chronic congestion point. 11/10/07
Photos by AARoads
Page Updated Friday January 24, 2025.