Ramps from SR 826 to U.S. 41 were consolidated to a single departure point during construction in 2006. 12/08/03
12/08/03
Palmetto Expressway south at Coral Way prior to expansion of SR 826 to 12 lanes. 12/08/03
12/08/03
Two lanes were added to each direction of SR 826 at Coral Way during expansion work. 03/25/06
03/25/06
Former diagrammatic sign for the SR 826/874 southbound split. 12/08/03
SR 826 with four southbound lanes leading to SR 976 (SW 40th Street) and SR 874 (Don Shula Expressway). 12/08/03
03/25/06
These older guide signs for SR 874 and SW 40th Street were replaced by 2006. 12/08/03
03/25/06
SR 826 south at the SW 56th Street off-ramp by SR 874. 12/08/03
An additional lane was added for both SR 874 south and the continuation of the Palmetto Expressway. 03/25/06