This overhead posted ahead of Exit 6 with N.C. 89 was replaced and now displays one quarter of a mile. 10/05/01
Both guide signs posted at the parclo interchange (Exit 6) along I-74 east were replaced by 2014. These panels are no longer lighted as well. 10/05/01
Guide signs for Exit 70 at High Point were replaced to reflect the name change of Kivett Drive to Martin Luther King, Jr. Drive. 08/06/13
08/06/13
The temporary east end of the High Point Bypass was at Business Loop I-85/U.S. 29-70. I-74 opened southeast to Glenola in November 2010. 07/09/10
A U.S. 311 trailblazer directed traffic onto U.S. 29/70 south from the High Point bypass to Main Street (former U.S. 311 through Archdale). 07/09/10
Kivett Drive was renamed Martin Luther King, Jr. Drive by the city of High Point in 2016. 07/09/10
07/09/10
07/09/10
U.S. 311 Business was decommissioned through High Point in 2010. 07/09/10
07/09/10
Future I-74 corridor sign posted after N Main Street (old U.S. 311 Business). 07/09/10
Previous guide signs at for the exchange joining I-74 with I-40. 07/09/10
07/09/10
U.S. 52 (Future I-42) leads north from I-40 through Winston-Salem to the continuation of I-74. 07/09/10
Exit 108B previously connected U.S. 52 with adjacent Vargrave Street via a modified trumpet interchange. 07/09/10
Exit 108B leaves U.S. 52-311 north after the freeway crosses a CSX Railroad line. 07/09/10
Exit 108C was a parclo interchange joining U.S. 52 with Stadium Drive and Vargrave Street south at Winston-Salem State University. 07/09/10
The DDI with Research Parkway replaced both Exit 108B and 108C with Vargrave Street. 07/09/10
Business Loop I-40 through Winston-Salem was decommissioned in February 2020. 07/09/10
U.S. 421 (Salem Parkway) through Downtown Winston-Salem was rebuilt from 2018 to 2020. 07/09/10
Exit 110A was a split diamond interchange joining U.S. 52 with 3rd, 4th and 5th Streets north of the Greyhound Court overpass. 07/09/10
Until 2018, U.S. 311 overlapped with U.S. 52 north to Exit 110B. 07/09/10
07/09/10
U.S. 311 was extended northeast from Eden to the Danville, Virginia area in July 2012. 07/09/10
07/09/10
07/09/10
07/09/10
Exit 111B for Liberty Street north was removed during 2010-13 road work. 07/09/10
U.S. 52 north of NC 65 prior to construction for the Winston-Salem Northern Beltway. 07/09/10
Concrete roadways along U.S. 52 near Pilot Mountain. 07/09/10
U.S. 52 north at Exit 129 for Perch Road. 07/09/10
07/09/10
07/09/10
All overhead signs for Exit 140 were replaced between 2001 and 2010. Light fixtures were removed during the replacement. 10/05/01
10/05/01
10/05/01
Overheads at Exit 6 were replaced between 2001 and 2010 and lighting fixtures removed. 10/05/01
These overheads posted at the three-wye interchange between Interstate 74 west and Interstate 77 were replaced by 2010. 10/05/01