08/11/08
08/11/08
I-77 north at Billy Graham Parkway prior to the truncation of U.S. 521 north of I-485. 10/05/01
12/13/08
12/13/08
12/13/08
06/01/12
12/13/08
12/13/08
06/22/05
06/01/12
10/05/01
12/15/16
The previous carpool lane on I-77 northbound commenced after the Cindy Lane overpass. 12/13/08
12/15/16
12/13/08
12/13/08
12/13/08
12/13/08
Until 2004, I-77 was just a four lane freeway north from Interstate 85. U.S. 21 splits with I-77 at Exit 16A and rejoins it at Exit 28 to cross Lake Norman. 10/05/01
12/13/08
12/13/08
12/13/08
12/13/08
12/13/08
12/13/08
12/06/08
12/13/08
12/13/08
12/13/08
12/13/08
12/13/08
10/05/01
Hickory was replaced by Asheville with sign replacements made during 2012-17 construction at the exchange with I-40. 09/23/14
09/23/14
Construction from 2012-17 replaced the loop ramp for I-40 west from I-77 north. 09/23/14
Button copy signs at the cloverleaf interchange with Interstate 40. 10/05/01
The former loop ramp (Exit 51B) for I-40 west from I-77 north. Sign replacements made by 2017 replaced Hickory with Asheville as the westbound control city for I-40. 10/05/01
09/23/14
Date stamped 06/29/87, the last remaining state named shield for Interstate 77 north was posted beyond Exit 65 (NC 901). 10/05/01