I-95 South Carolina - North


Interstate 95 carries six overall lanes through to the diamond interchange (Exit 170) with S.C.327 (Williston Road) south. Signs for Exit 170 were replaced by December 2008 to show the new SC state shield. 12/16/07

This ground level sign was replaced by December 2008, but then removed after an overhead assembly for S.C. 327 south was added. 12/16/07

The 1967-built overpass for S.C. 327 was replaced during an interchange upgrade at Exit 170 in 2012-13. 12/16/07

Concrete along Interstate 95 through western Dillon County was resurfaced with asphalt by 2010. 05/30/07

Sign replacements were made at Exits 181A/B for S.C. 38 to reflect the new state highway sign design by December 2008. 12/16/07
Photos by AARoads, Carter Buchanan (08/28/04, 06/12/05)
Page Updated Friday January 24, 2025.