The Exit 169A panel was replaced by 2008. Originally the sign displayed "Interstate 95 South" as the lane for Exit 169A also continued through. 07/11/05
I-95 during the early phase of the Springfield Interchange Project. The majority of this project was completed by 2008. 10/14/01
The highest flyover between Interstate 95 and SR 644 rises from westbound Franconia Road onto the southbound freeway. 06/17/05
Exit 169A departs the I-395 c/d roadway south for SR 644 (Franconia Road) east to Springfield Town Center. 12/30/12
The HOV-3 roadway split with a return ramp for the I-95 southbound mainline at Franconia Road. 06/17/05
Sign changes were made after Fairfax County and Franconia-Springfield Parkways were upgraded to primary state routes. 12/30/12
Overheads for SR 289 and Exit 167 were replaced during work to convert the HOV-3 roadway into tolled Express Lanes. 10/12/14
Three-digit width reassurance shield posted at the Franconia-Springfield Parkway overpass. Several of these styles of shields appeared in Northern Virginia during the mid 1990s. This assembly was removed by 2019. 10/12/14
Exit 166B initially lead to the temporary end of Fairfax County Parkway at Fullerton Road. Connections with Backlick Road south connected drivers with SR 790 (Alban Road) south parallel to I-95. 06/17/05
The slip ramp connecting the HOV roadway with I-95 south of Exit 166 closed during late 2012 construction for the tolled Express Lanes. 07/01/05
This was a typical sign bridge posted along the reversible HOV-3 roadway at slip ramps entering from the opposite direction of I-95. 07/01/05
A new sign bridge placed further south at the Express Lanes ingress point replaced the 1.25 mile overhead for SR 123. 07/09/10
Photos by AARoads, Carter Buchanan (07/01/05), Justin Cozart (10/02/05), Will Weaver (05/08/10)
Page Updated Friday January 24, 2025.