Changes made to this pull through panel replaced Tampa with Augusta. 04/13/12
These overheads were replaced by 2016. 04/13/12
This confirming marker for I-285 east was posted at the Fayetteville Road underpass. 04/13/12
A new overhead was added here for Exit 60 by 2017. 04/13/12
This bridge mounted sign at SR 139 was replaced by August 2016. 04/13/12
Both signs here were replaced by January 2017. 04/13/12
An arrow-per-lane (APL) overhead assembly replaced this set of panels by 2017. 04/13/12
his assembly was replaced by July 2016. 04/13/12
04/13/12
04/13/12
04/13/12
08/10/13
08/10/13
08/10/13
08/10/13
08/10/13
08/10/13
08/10/13
08/10/13
08/10/13