A number of guide signs were replaced by early 2008 to utilize Clearview font. 01/02/08
The overhead assembly at Exit 34B was removed by 2012 and replaced with a temporary ground level sign. 01/02/08
01/02/08
Former overhead for SR 10 at the SR 618 overpass. 01/02/08
Most guide signs for Interstate 95 on I-295 south were replaced in September 2013. 01/02/08
One quarter mile ahead of Exit 1 to Interstate 95 north on I-295 south outside Petersburg. 01/02/08
Interstate 295 concludes 92 miles north of Rocky Mount, North Carolina. 01/02/08