US 19/98/27 ALT south at CR 351 in Cross City. 07/19/07
Flashers at CR 351 were eventually replaced with mast arm traffic lights. 07/19/07
The southern terminus of U.S. 129. 07/19/07
07/19/07
NW 4th Avenue in Chiefland. 07/19/07
Park Avenue in Chiefland. 07/19/07
US 19/98 south at SR 345 in Chiefland. 07/19/07
Mast arm supported signals replaced this span wire array at SR 345. 07/19/07
CR 40 meets US 19/98 in Inglis. 07/19/07
U.S. 19/98 previously narrowed to two lanes ahead of the Cross Florida Barge Canal. 07/19/07
07/19/07
The substandard high rise bridge taking US 19/98 over the Cross Florida Barge Canal was replaced with a four lane crossing. 07/19/07
07/19/07
US 19/98 south at CR 488. 07/19/07
Span wire traffic lights at Power Line Street. 07/19/07
Southbound at CR 495 in Crystal River. 07/19/07
The junction shield for SR 44 was replaced with a west shield by 2014. 07/19/07
US 19/98 south at CR 494 west to Ozello. 07/19/07
CR 490 joins Homosassa Springs with Lecanto. 07/19/07
CR 490A spurs west along Halls River Road. 07/19/07
Sign replacements eliminated the trailblazer for the west branch of CR 490 on Yulee Drive. 11/26/14
A sign change was made at the Evans Road off-ramp on U.S. 19 south at east Dunedin by 2015. The new overhead shifted the arrow to the Ramp Only placard. This ramp will be eliminated once U.S. 19 is upgraded to a freeway northward to Curlew. 08/24/13
Replaced guide sign with an Enterprise green out posted ahead of SR 580. The 2015 replacement reads Next Right instead of 2/10th of a mile. 08/24/13
The frontage road system at Countryside Boulevard was extended southward to the system at Sunset Point Road. This retained local access to area businesses and apartments now bypassed by the U.S. 19 freeway. 08/24/13
U.S. 19 previously upgraded back to a freeway ahead of Sunset Point Road (CR 576). 08/24/13
U.S. 19 temporarily shifted onto the frontage road system as crews completed work on the freeway upgrade at the Seville Boulevard underpass. 08/24/13
U.S. 19 south at the previous at-grade intersection with Harn Boulevard west. 08/24/13
Construction elevated U.S. 19 onto a viaduct above both Belleair Road here and adjacent Allen's Creek. 08/24/13
U.S. 19 transitioned onto an older stretch of freeway south of Central Avenue in east Pinellas Park. 08/24/13
The U.S. 19 frontage road system resumed ahead of Whitney Road. Now the service roads are seamless north to SR 60. 05/16/05
These guide signs at the off-ramp for SR 686 were carbon copied between January and November 2016. Lighting fixtures were removed during the change. 08/24/13
Overheads on the frontage road ahead of SR 686 were also carbon copied between January and November 2016. 01/14/16