STLmapboy:

--- Quote from: SkyPesos on December 10, 2021, 08:53:49 PM ---
--- Quote from: mvak36 on December 10, 2021, 08:40:10 PM ---Job J6I3622 Route I-170 ST LOUIS County. Pavement repair I-170 from I-270 to I-64, the total length of improvement being 10.4 miles.

--- End quote ---
About time...  :clap:

--- End quote ---

I mean...as someone who drives this route at least once a week, it's not horrible. But repair would definitely be welcome.

mvak36:
The winning bids for the December letting were awarded at the MHTC meeting on 01/05/22.

mvak36:
The I-44 Corridor Bridge Bundle Design-Build Project was also awarded at the Commission meeting on 01/05/2022

https://www.modot.org/node/24924

--- Quote ---Southwest District – The Missouri Highways and Transportation Commission today selected The ESS Team to improve 25 bridges within 15 miles of I-44 across the Southwest District, the Missouri Department of Transportation said.

There are 25 bridges in the bundle with seven (7) mainline I-44 bridges, five (5) I-44 overpass bridges and the remaining on adjacent routes over various features.

The project is in line with Gov. Parson’s commitment to focus on taking care of Missouri’s vital infrastructure.

There are approximately 10,400 bridges on the state’s highway system. Nearly 840 of them are rated as “poor” by the Federal Highway Administration.

Four teams vied for the opportunity to design and build I-44 Corridor Bridge Bundle, as it’s being called. 16 bridges will be replaced and 9 bridges will receive major rehabilitation work.

The ESS Team is a partnership of engineering and construction firms that will design and construct the project with oversight by MoDOT and the Federal Highway Administration.

ESS Team members are:

    Emery Sapp & Sons, Inc. – Columbia
    Parsons Transportation Group, Inc. – St. Louis

Construction of the $38.5 million project is scheduled to begin in late spring or early summer of 2022 with completion in the fall of 2024.

Anyone interested in the project, or who would like to receive regular e-updates during construction, can visit the project website – I-44 Corridor Bridge Bundle.

This will be the 21st design-build project for MoDOT since the contract for The New I-64 in St. Louis was awarded in the fall of 2006.

--- End quote ---

mvak36:
February 18, 2022 Letting: Bid Results. Bid Award Winners.

Projects listed in blue font are part of Missouri Focus on Bridges program.

Job J4P3295E Route H CLAY County. Grading and pavement at 100th St. and Crockett Road, the total length of improvement being 0.193 miles.

(1): Job J5S3273 Route A MONITEAU County. Bridge replacement over Enon Creek near Enon, the total length of improvement being 0.062 miles.
(2): Job J5S3334 Route A COLE County. Bridge Replacement over South Moreau Creek 0.3 miles East of Enon, the total length of improvement being 0.127 miles.

Job J5S3448 Route M and Z COOPER County. Bridge rehabilitation 0.19 miles North of Route OO and 0.27 miles South of Route AE, the total length of improvement being 0.078 miles.
Job J5S3359 Route 240 Spur BOONE, HOWARD County. Bridge replacement over Montieau Creek in Rocheport, the total length of improvement being 0.103 miles.
Job J5S3505 Route BB PHELPS County. Signal and lighting improvements at Route BB and Forum Drive intersection in Rolla, the total length of improvement being 0.039 miles.

(1): Job J6P3307 Route 61 ST CHARLES County. Resurfacing from St. Charles County line to Route 61/I-70/I-64 interchange, the total length of improvement being 7.329 miles.
(2): Job J6P3373 Route 364 ST CHARLES, ST LOUIS County. Signing, guardrail, and concrete barrier from Jungs Sta. Road to east of Missouri River, the total length of improvement being 3.365 miles.

Job J6I3485 Route I-70 ST CHARLES County. Install dynamic curve warning system from Wentzville Parkway to Route Z, the total length of improvement being 1.326 miles.
Job J6P3062B Route 141 ST LOUIS County. 2 Bridge replacements one mile north of I-70 in Earth City, the total length of improvement being 0.15 miles.

(1): Job J6I3149 Route I-55 ST LOUIS County. 14 Bridge Rehabilitations from Holly Hills Ave to Arsenal St, the total length of improvement being 3.888 miles.
(2): Job J6I3187 Route I-55 ST LOUIS County. 11 Bridge Rehabilitations from Lindbergh Blvd (61/67) to Holly Hills Ave, the total length of improvement being 5.654 miles.

(1): Job J7P3101B Route Various WEBSTER County. ADA improvement at various locations in Webster County, the total length of improvement being 6.74 miles.
(2): Job J7S3367B Route 38 WEBSTER County. ADA improvement from Banning Street to east of Blair Street in Marshfield, the total length of improvement being 0.709 miles.
(3): Job J7S3439 Route Various WEBSTER County. ADA improvement at various locations in Marshfield, the total length of improvement being 0.3083 miles.

Job J7I3463 Route IS 49 VARIOUS County. Job Order Contracting for pavement repair Job Order Contracting for pavement repair from the Cass County line to Rte. 54 in Vernon County, the total length of improvement being 89.614 miles.

(1): Job J7P3107F Route B BATES County. 2 Bridge replacements over the Marais des Cygnes River 4 miles east of Rich Hill and over the Bates County Drainage Ditch 2.2 miles east of Rich Hill, the total length of improvement being 0.544 miles.
(2): Job J7P3190K Route BB BATES County. Bridge deck replacement over South Deepwater Branch 11.5 mile e/o Butler, the total length of improvement being 0.044 miles.

Job J8I3210 Route I 44 GREENE County. Job Order Contracting for pavement repair Job Order Contracting for pavement repair in the Ozarks Transportation Organization area, the total length of improvement being 42.794 miles.
Job J8P3207 Route 60 CHRISTIAN, GREENE County. ITS improvements at various locations on Rte. 60 (James River Freeway) in Springfield, Rte. FF (West Bypass) near Battlefield, and various locations in Ozark., the total length of improvement being 6.76 miles.
Job J7P3532B Route I-44 JASPER County. Bridge rehabilitation on westbound lanes Over I-49 in Fidelity, the total length of improvement being 0.041 miles.
Job J7I3459 Route IS 49 MCDONALD County. Job Order Contracting for pavement repair Job Order Contracting for pavement repair from Rte. 59 to 0.7 mile south of Rte. H, the total length of improvement being 21.492 miles.
Job J7I3461 Route IS 44 VARIOUS County. Job Order Contracting for pavement repair from the Oklahoma State line to Rte. 360 in Greene County, the total length of improvement being 138.22 miles.
Job J7S3367F Route HH NEWTON County. ADA improvements from South Street to Shartel Rd in Neosho, the total length of improvement being 0.449 miles.
Job J7I3458 Route IS 49 VARIOUS County. Job Order Contracting for pavement repair from Rte. 54 in Vernon County to I-44 in Jasper County, the total length of improvement being 111.995 miles.
Job J7I3462 Route IS 44 WEBSTER County. Job Order Contracting for pavement repair in Webster County, the total length of improvement being 41.452 miles.
Job J7P3107D Route CC WEBSTER County. Bridge replacement over the Niangua Branch 1.8 miles east of Marshfield, the total length of improvement being 0.094 miles.
Job J9S3381 Route BUS 60 BUTLER County. Bridge replacement over Black River in Poplar Bluff, the total length of improvement being 0.208 miles.
Job J9S3476 Route P VARIOUS County. Resurface from MO 25 to MO 91, the total length of improvement being 12.317 miles.
Job J9S3807 Route U CARTER County. Resurface from Rte. 21 to Rte. 60, the total length of improvement being 2.113 miles.
Job J9P3598 Route 67 ST FRANCOIS County. Intersection improvement at Route H near Farmington, the total length of improvement being 0.36 miles.
Job J9P3218 Route 34 WAYNE County. Bridge replacement over Black River, the total length of improvement being 0.343 miles.
Job J9P3513 Route 34 WAYNE County. Resurface and shoulder improvements Route 49 to US 67 and NB off/on ramp, the total length of improvement being 13.237 miles.

EDIT: Additional Lettings added
Job J6I3424 Route I-70 ST LOUIS CITY County. Resurface from Branch St to Biddle St under I-44, the total length of improvement being 1.89 miles.

(1): Job J6P3308 Route 367 ST LOUIS County. 9 Bridge Rehabilitations from Route 67 (Lindbergh) to I-270 and then at Maline Creek, the total length of improvement being 1.091 miles.
(2): Job J6S3437 Route 367 ST LOUIS County. Coldmill and resurface on Route 367 from North of I-270 to Halls Ferry Circle, the total length of improvement being 3.42 miles.

Job J7P3465 Route 7 HENRY County. Intersection improvement and resurface at Routes 7/13 north and Routes 7/13/18 south in Clinton, the total length of improvement being 0.458 miles.

Job J6I3029B Route I-44 ST LOUIS County. Multi-use trail at the Meramec River Bridge west of I-270, the total length of improvement being 0.32 miles.

MikieTimT:
Looks like they're fixing pavement on significant chunks of I-49.  It's about time.  Surface is pretty advanced in age on a good portion from long before it was promoted to an interstate.