Regional Boards > Southeast

I-69 in TN

<< < (153/159) > >>

abqtraveler:
Any word on when TDOT will let construction contracts for the two sections that will bypass Troy?

GreenLanternCorps:
FYI, paving on the two sections of the Union City bypass that are already built began about a year ago...

https://www.jacksonsun.com/story/news/2021/07/16/paving-interstate-69-bypass-obion-county-tennessee/7937940002/

GreenLanternCorps:
Google maps is now showing the ramps that carries US 45W/51 concurrency through the interchange with I-69 as being open (or at least marked on the map).
However, they are still showing the original southbound lanes too.

https://www.google.com/maps/@36.4639511,-88.9827306,17z

TNObion:
Here are a few aerials I snapped in the past couple of weeks, the first is looking west toward Union City at the Claude Tucker/Section Line Rd Bridges, the second is looking North at the interchange, and the third is a general look of the interchange I took over some farmland. The southbound 51 ramp is open to traffic, however all northbound traffic is rerouted via TN 214 (Ken-Tenn RD) and as one could imagine, this created several issues along that road with accidents, etc....I included a link of the mayor speaking about this issue as well-

https://www.thunderboltradio.com/closure-of-highway-51-north-causing-traffic-issues-in-obion-county/

https://imgur.com/a/17a6H7v

hbelkins:
So is northbound 51 closed all the way to South Fulton?

Navigation

[0] Message Index

[#] Next page

[*] Previous page

Go to full version