News:

Thank you for your patience during the Forum downtime while we upgraded the software. Welcome back and see this thread for some new features and other changes to the forum.

Main Menu

Alabama stimulus highway project list

Started by froggie, March 17, 2009, 05:47:57 PM

Previous topic - Next topic

froggie

Found ALDOT's stimulus project list.  Virtually the entire thing is resurfacing or safety improvement projects, though there were 3 projects of note:

- A new interchange on US 231/431 at Sparkman Dr (US 72 East) in Huntsville.

- Additional lanes on I-20, roughly between MP 148 and MP 155 (west of Pell City)

- Construction (possibly completion?) of the Anniston East Bypass.  Once the full bypass is completed, it will connect Golden Springs Rd with the existing US 431/AL 21 North junction.  I'd looked this project up previously and per the Anniston newspaper, it will become part of a rerouted US 431 once completed.  The Anniston paper also had a poll going for what to name the new road upon completion.


mightyace

Quote
- Additional lanes on I-20, roughly between MP 148 and MP 155 (west of Pell City)

That may help with Talladega race traffic.  Exit 168 is the exit for traffic coming from the west.  i.e. Birmingham
My Flickr Photos: http://www.flickr.com/photos/mightyace

I'm out of this F***KING PLACE!



Opinions expressed here on belong solely to the poster and do not represent or reflect the opinions or beliefs of AARoads, its creators and/or associates.