News:

why is this up in the corner now

Main Menu

New Missouri US 61 interchange in Lincoln County

Started by splashflash, October 26, 2024, 08:24:40 PM

Previous topic - Next topic

splashflash

MoDOT will have an open house Oct 29th in Troy with options for a new interchange.  Construction north of Troy to replace two current interdectikns for highways K/V and Creech Dr is to be started 2026.  The interchange is to open in winter 2027.

https://www.modot.org/us-route-61-route-k-and-route-v-interchange-improvements-lincoln

This work will make US 61 more of a freeway, but the Hannibal Expressway bypass appears to have stalled.


splashflash

Upon reading the report for the project above,a second interchange, a few miles north, will be built concurrently.  At grade crossing Routes E and B, also in Lincoln county, will start in 2026.  The report notes that the contractor should be ready to coordinate  planning to avoid closure of both crossings at the same time.

Note that the B and E grade crossing has a flashing amber light above each carriageway.

Revive 755

The meeting handouts posted online mention that a diamond interchange would require signalizing the ramp intersections.  If traffic has grown that much north of Troy I wonder how long before North Lincoln Drive and the southern Route KK intersections are under study for interchanges?

splashflash

Quote from: Revive 755 on November 03, 2024, 11:25:31 PMThe meeting handouts posted online mention that a diamond interchange would require signalizing the ramp intersections.  If traffic has grown that much north of Troy I wonder how long before North Lincoln Drive and the southern Route KK intersections are under study for interchanges?

There is unfunded work south if Lincoln County as well: https://www.modot.org/us-route-61-safety-and-traffic-study-st-charles



Opinions expressed here on belong solely to the poster and do not represent or reflect the opinions or beliefs of AARoads, its creators and/or associates.