AARoads Forum

Please login or register.

Login with username, password and session length

Author Topic: MODOT Contract Lettings  (Read 23049 times)

mvak36

  • *
  • Offline Offline

  • Posts: 1015
  • Last Login: Today at 11:41:30 AM
Re: MODOT Contract Lettings
« Reply #150 on: May 16, 2021, 11:58:07 AM »

June 18, 2021 Letting:

Projects listed in blue font are part of Missouri Focus on Bridges program. None listed as of now

(1): Job J1I3434 Route I-35 DAVIESS County. Scour repair at the Grand River 1.9 miles north of Rte. DD near Pattonsburg, the total length of improvement being 0.015 miles.
(2): Job J1P3435 Route 136 MERCER County. Scour repair at 0.9 mile east of Rte. DD near Ravanna, the total length of improvement being 0.038 miles.

(1): Job J1MAMD01 Route Various VARIOUS County. Resurface on various routes in Grundy, Mercer, Linn, Putnam, and Sullivan Counties, the total length of improvement being 75.59 miles.
(2): Job J2MAMD08 Route 149 ADAIR, PUTNAM County. Resurface from Rte. AA to Rte. 6 in Novinger, the total length of improvement being 10.653 miles.

Job J1P3303 Route 6 GRUNDY, SULLIVAN County. Scrub seal from Rte. 65 to Rte. 5 south of Milan and from east of Rte. 5, north of Milan, to Rte. 129 in Green City, the total length of improvement being 34.355 miles.

(1): Job J2MAMD01 Route A LEWIS County. Resurface from Rte. E in Williamstown to Rte. 16 in Monticello, the total length of improvement being 9.803 miles.
(2): Job J2MAMD13 Route B SCOTLAND County. Resurface from Iowa State line to Rte. 136, the total length of improvement being 13.962 miles.
(3): Job J2MAMD14 Route H CLARK County. Resurface from Rte. 81 0.5 mile south of Rte. Y to Rte. 61, the total length of improvement being 12.02 miles.

Job J2MAMD16 Route Y MACON, RANDOLPH County. Resurface from Rte. 63 near Excello to Rte. J in Randolph County, the total length of improvement being 10.874 miles.
Job J3S3209 Route 13 LAFAYETTE County. Slide repair from Rte. 224 to Delaware Street in Lexington, the total length of improvement being 0.091 miles.

(1): Job J5MAMD01 Route BB,NN MONITEAU County. Resurface Rte. NN from Moon Valley Road to Rte. 5 and Rte. BB from Rte. 50 to Arthur Road, the total length of improvement being 5.757 miles.
(2): Job J5MAMD02 Route JJ MORGAN County. Resurface from Rte. 135 to Rte. D, the total length of improvement being 7.645 miles.

Job J5MAMD04 Route Various CALLAWAY County. Resurface Rte. PP from Rte. BB to Rte. 94, Rte. K from Rte. D to Montgomery County line, and Rte. HH from I-70 to Rte. 54, the total length of improvement being 23.792 miles.
Job J6P3482 Route 364 ST CHARLES County. Median barrier installation over I-64 between on and off ramps, the total length of improvement being 0.378 miles.
Job J6S3476 Route I-44 ST LOUIS County. Pavement, guardrail, signal, and ADA improvements on the north and south outer roads between Antire Road to Yarnell Road, the total length of improvement being 5.184 miles.

(1): Job J7Q3414B Route I-44 GREENE, JASPER, LAWRENCE, NEWTON, WEBSTER County. ITS improvements at various locations on I-44 in the rural Southwest District, the total length of improvement being 0 miles.
(2): Job J8Q3181B Route Various GREENE County. ITS improvements at various locations in Urban Southwest District, the total length of improvement being 0 miles.

Job J9P3585 Route 51 PERRY County. Bridge rehabilitation over Mississippi River and Union Pacific Rail Road, the total length of improvement being 0.597 miles.

EDIT: Additional lettings added
Job J1M0264 Route 169 BUCHANAN County. Repair damaged culvert at 0.1 mile south of Karnes Road in St. Joseph, the total length of improvement being 0.086 miles.

(1): Job J3MAMD01 Route Various JOHNSON County. Resurface on various routes in the Rural Kansas City District, the total length of improvement being 13.413 miles.
(2): Job J4MAMD01 Route Various CASS County. Resurface various routes in the Urban Kansas City District, the total length of improvement being 12.218 miles.

Job J6MAMD02 Route Various FRANKLIN County. Resurface from I-44 to end of maintenance, Rte. JJ from end of maintenance to I-44, and Rte. W from I-44 to end of maintenance, the total length of improvement being 13.56 miles.
Job J0M0063 Route Various VARIOUS County. On-call slab stabilization statewide, the total length of improvement being 0 miles.
« Last Edit: June 08, 2021, 02:18:34 PM by mvak36 »
Logged
Counties: Counties visited
Travel Mapping: Summary

mvak36

  • *
  • Offline Offline

  • Posts: 1015
  • Last Login: Today at 11:41:30 AM
Re: MODOT Contract Lettings
« Reply #151 on: June 08, 2021, 02:20:45 PM »

The winning bids for the May letting were awarded at the MHTC meeting on 6/2/21.
Logged
Counties: Counties visited
Travel Mapping: Summary

 


Opinions expressed here on belong solely to the poster and do not represent or reflect the opinions or beliefs of AARoads, its creators and/or associates.