News:

Cloudflare is enabled due to bots continuing to hammer the Forum.

Main Menu

Los Angeles Area Roads and Bridges

Started by Plutonic Panda, June 21, 2026, 03:33:14 AM

Previous topic - Next topic

Plutonic Panda

I thought I started a general catch all thread for smaller Los Angeles area road projects, but I can't find it. Anyways, I wanted to report that the Hyperion Ave Bridge is finally starting construction with some staging materials on site.


Plutonic Panda

The Santa Monica Pier Bridge Replacement Project has shifted all pedestrian activity to a new temporary bridge while the main one is completely rebuilt:

https://www.santamonica.gov/press/2026/06/05/temporary-pedestrian-bridge-offers-visitors-a-new-way-to-access-santa-monica-pier-businesses-and-attractions

Max Rockatansky

The city picked an awful year for this replacement project if they were hoping to cash in on pseudo US 66 fandom seeing the "claimed endpoint" on the pier.  Maybe that will encourage people to go see the real terminus points on Lincoln Boulevard or even Fletcher Drive further back in Los Angeles. 

Plutonic Panda


Plutonic Panda

They were supposed to do a road diet on Forest lawn Drive thankfully that has been shelved by Maher Karen Bas allegedly due to the cemetery voicing concerns. I hope that never happens. I don't mind saying it on here. I will illegally pass people on that road cause I know that it's gonna be a bitch. People are gonna be driving slow on it. That is just fucking stupid to remove a lane on that road there's no need for that. There's plenty of room to add cycling facilities that are protected and maintain two lanes of traffic each way.

Plutonic Panda

They also had a pretty extensive project plan for the Overland Ave, National BLVD, and I-10 interchange. That was before the pandemic and I'm not sure what the status of that is. I can't find anything more on it and I'm not sure if they abandon that project or what. It did look like it was needed the correct some geometrical deficiencies.

Plutonic Panda

And then call me crazy, but I thought they were supposed to widen Lincoln Boulevard to create a continuous three lane roadway over Ballona Creek. Pepsi on that or heard about that either that was proposed a quick minute ago as well.

Rothman

Please note: All comments here represent my own personal opinion and do not reflect the official position(s) of NYSDOT.

Plutonic Panda

Quote from: Rothman on June 21, 2026, 07:46:31 PMWhy the multiple posts?
I'm not sure if that's against form rules or not but I just posted different replies so I can quote them to respond to new project information to myself. I guess if anybody.

Plutonic Panda


JustDrive

Where specifically on PCH would the roundabouts have been constructed? Encinal Canyon? Decker Canyon?

kphoger

Quote from: Rothman on June 21, 2026, 07:46:31 PMWhy the multiple posts?
Quote from: Plutonic Panda on June 22, 2026, 11:01:14 AMI'm not sure if that's against form rules or not ...

FYI, here is the pertinent forum guideline:

Quote from: Alex on May 21, 2009, 10:34:10 AMWhat's not allowed:

  • Avoid posting multiple times in a row. Posts may be edited by the original author at any time. Multiple posts may be merged into one by the moderators at their discretion.

He Is Already Here! Let's Go, Flamingo!
Dost thou understand the graveness of the circumstances?
Deut 23:13
Male pronouns, please.

Quote from: PKDIf you can control the meaning of words, you can control the people who must use them.

Max Rockatansky

The more traffic signals that can be replaced by alternative configurations like roundabouts, the better.

M3100

Here are two local projects that I am following:

A. Westbound SR-91 Exit 10, Alameda/Santa Fe. The guardrails are being rebuilt, and the offramp is being reconfigured. The offramp starts with an overpass over parallel Artesia Blvd. Some pics:

1. The offramp originally had two lanes; they did not remove one of the arrows from the exit sign when they removed one of the lanes 

2. The lefthand exit lane is open while work continues


3. The ramp that had swung left to join Artesia Blvd. is closed, with construction equipment stationed there.


B. The ever-present repaving, due to landslides, on Palos Verdes Drive South near Portuguese Bend:

Plutonic Panda

Is the road in Palos Verdes back open? I thought it was closed indefinitely. I know they moved that church that had the redwoods(or Sequoia's?).

M3100

Quote from: Plutonic Panda on August 31, 2026, 06:27:19 PMIs the road in Palos Verdes back open? I thought it was closed indefinitely. I know they moved that church that had the redwoods(or Sequoia's?).

The road is open, though there are signs stating that it is closed to motorcycles and bicycles. The Wayfarers Chapel was dismantled and the major building construction pieces were placed in storage. They are seeking a new location further west where they can rebuild.

Plutonic Panda

Now they're looking at making Sunset Boulevard one lane each way through Echo Park and reducing 72% of the street parking:

https://www.theeastsiderla.com/neighborhoods/echo_park/sunset-boulevard-road-diet-will-make-more-room-for-buses-and-bikes-and-less-for/article_f9684971-1d80-4d0d-b497-2f0801403bb6.html?fbclid=IwdGRleAUGI1lwZG9mBWZkaWQWUNtXT00icqn4ZEC04dxFPZZPkmInX2V4dG4DYWVtAjExAHNydGMGYXBwX2lkCjY2Mjg1NjgzNzkAAR7QZW5rRblmRP7iiONDvGNW1tUTxyxzjRfJsWuMGuBX2sWPLivnEqEs8CsC6g_aem_1LYeOIzWIguI3dPTZtHICw


This also comes as they're looking at reducing the rest of Hollywood Boulevard to making it one lane each way. Same thing with Forest lawn Drive. And they want to close down Wilshire Boulevard to cars through the park. And there's dozens of other projects for the same kind of crap.

Plutonic Panda

Quote from: M3100 on August 31, 2026, 06:33:19 PM
Quote from: Plutonic Panda on August 31, 2026, 06:27:19 PMIs the road in Palos Verdes back open? I thought it was closed indefinitely. I know they moved that church that had the redwoods(or Sequoia's?).

The road is open, though there are signs stating that it is closed to motorcycles and bicycles. The Wayfarers Chapel was dismantled and the major building construction pieces were placed in storage. They are seeking a new location further west where they can rebuild.
Just drove it and yeah, the road is in rough shape as it's always been. I wonder is there a long-term plan for this road or is there even a study? It would seem at some point they would need to build a bridge with some really deep pile drives for deep foundations. Seems like a long-term fix is gonna be pretty expensive. Or is it just going to be continuously fixed as the land keeps sliding into the ocean?

M3100

Quote from: Plutonic Panda on September 03, 2026, 06:34:38 AMJust drove it and yeah, the road is in rough shape as it's always been. I wonder is there a long-term plan for this road or is there even a study? It would seem at some point they would need to build a bridge with some really deep pile drives for deep foundations. Seems like a long-term fix is gonna be pretty expensive. Or is it just going to be continuously fixed as the land keeps sliding into the ocean?

This area has been a topic of debate for years. According to news reports over the past several months, the local authorities have installed ground pumps above the highway to remove moisture from the hillside; this in turn slows the rate of movement of the landslide.  To date, no affordable long-term solution has been identified to stop the landslide, beyond constantly monitoring/repaving the road.  Meanwhile, my understanding is that the landslide was triggered in 1956 when construction of Crenshaw Blvd. was underway.  AFAIK that last segment of Crenshaw was never finished/opened to the public, however the 1956 Thomas Guide includes Crenshaw Blvd. as if it were completed.  (In most cases I have found Thomas Guides to be highly accurate).