News:

The server restarts at 2 AM daily. This results in a short period of downtime, so if you get a 502 error at that time, that is why.

Main Menu

Illinois interesting bid annoucements

Started by Revive 755, June 05, 2013, 10:38:30 PM

Previous topic - Next topic

ET21

Item 21 converts the Ravina Avenue intersection with 153rd Street in Orland Park to a roundabout

Considering there's a roundabout at West Ave/151st, not surprised this is happening. Ravinia has quickly become a good side route avoiding most of the lights on LaGrange Road
The local weatherman, trust me I can be 99.9% right!
"Show where you're going, without forgetting where you're from"

Clinched:
CA: I-105
IL: I-80, I-88, I-94, I-180, I-190, I-290, I-294, I-355, IL-390, IL-394
IN: I-80, I-94
SD: I-190
WI: I-90, I-94
MI: I-94, I-196
MN: I-90


Revive 755

List of projects for the September 18, 2026 Letting is up.
  • Item 1 is the I-57/IL 17 interchange reconstruction
  • Item 41:  "Beam fabrication for proposed SN 081-0174 carrying IL 5 over 27th St in Moline."
  • Item 67 is another readvertisement for the I-57/IL 16 interchange reconstruction.
  • Item 99:  "Tree removal along the east side of I-57 from 3 miles south of the West Frankfort interchange (at mile marker 62) to 3 miles south of the West City interchange (at mile marker 68)."

Rick Powell

Quote from: Revive 755 on August 14, 2026, 09:10:49 PMList of projects for the September 18, 2026 Letting is up.
  • Item 1 is the I-57/IL 17 interchange reconstruction
The bids were opened today for the I-57/IL 17 interchange. Winning bid was D Construction at $146,480,154.67. Walsh was runner up at $178,151,539.38. Three other contractors were on the bid list but elected not to bid. The low bid was considered "within a reasonable approximation of the Estimate" but still subject to a post-letting review. This is the biggest dollar-value individual project in District 3 history.

Brandon

Quote from: Rick Powell on September 18, 2026, 04:45:11 PM
Quote from: Revive 755 on August 14, 2026, 09:10:49 PMList of projects for the September 18, 2026 Letting is up.
  • Item 1 is the I-57/IL 17 interchange reconstruction
The bids were opened today for the I-57/IL 17 interchange. Winning bid was D Construction at $146,480,154.67. Walsh was runner up at $178,151,539.38. Three other contractors were on the bid list but elected not to bid. The low bid was considered "within a reasonable approximation of the Estimate" but still subject to a post-letting review. This is the biggest dollar-value individual project in District 3 history.

Oh, great, another Deconstruction project.  That means the construction zones will be poorly set up and the project will drag on forever.
"If you think this has a happy ending, you haven't been paying attention." - Ramsay Bolton, "Game of Thrones"

"Symbolic of his struggle against reality." - Reg, "Monty Python's Life of Brian"

Mav94

Quote from: Revive 755 on August 14, 2026, 09:10:49 PMList of projects for the September 18, 2026 Letting is up.
  • Item 1 is the I-57/IL 17 interchange reconstruction
  • Item 41:  "Beam fabrication for proposed SN 081-0174 carrying IL 5 over 27th St in Moline."
  • Item 67 is another readvertisement for the I-57/IL 16 interchange reconstruction.
  • Item 99:  "Tree removal along the east side of I-57 from 3 miles south of the West Frankfort interchange (at mile marker 62) to 3 miles south of the West City interchange (at mile marker 68)."


Was there anything about removing the zillions of dead trees along I-57 south of Marion?

Revive 755

List of projects for the November 6, 2026 Letting is up.
  • Item 1 appears to be for widening IL 22 between Lake Zurich and IL 83
  • Item 10 is HMA work on the approaches to the bridges on I-55 over the railroad and canal south of I-80
  • Item 28 grade separations Randall Road at the CN Railroad south of Elgin and realigns the Hopps Road intersection.
  • Item 40 replaces the IL 75 Rock River bridge
  • Item 42 appears to be the I-74/IL 5 cloverleaf to DDI conversion
  • Item 45 is a bridge replacement project for US 20 over I-90 east of Cherry Valley
  • Item 58 replaces the 15th Avenue Rock River bridge in Rockford
  • Item 61 is superstructure replacement for the IL 47 bridges over the railroad and Buchanan Street in Morris
  • Item 101 converts the White Oaks/Cascade Driver intersection in Springfield to a roundabout and widens White Oaks from there down to Wabash Avenue
  • Item 105 is another advertisement for the I-57 interchange with IL 16

ChiMilNet

Quote from: Revive 755 on October 02, 2026, 10:36:37 PMList of projects for the November 6, 2026 Letting is up.
  • Item 1 appears to be for widening IL 22 between Lake Zurich and IL 83

How many years did that stretch sit and collect dust on the Long Term Plan???