AARoads Forum

Please login or register.

Login with username, password and session length

Author Topic: North Carolina  (Read 506490 times)

Beltway

  • *
  • Offline Offline

  • Posts: 6435
  • Roads to the Future

  • Location: Richmond, VA
  • Last Login: Today at 12:42:27 AM
Re: North Carolina
« Reply #3375 on: February 07, 2020, 10:14:56 AM »

Plus looking at the I-95 Fayetteville bypass, it appears to be graded for 6-8 lanes with plenty of clearance at overhead structures.
Built with a wide median and independently graded roadways, common for 1970s designs on rural Interstate highway. 

I don't think they were thinking of more than 4 lanes at that point.  I recall the era -- it was hard to conceptualize what it would be like to have a completed I-95 on the eastern seaboard, or how much traffic it would carry 40 years later, given the light usage on the segments of I-95 that were complete in the South.
Logged
http://www.roadstothefuture.com
http://www.capital-beltway.com
On the Plains of Hesitation, bleach the bones of countless millions who, at the Dawn of Victory, sat down to rest, and resting died.

LM117

  • *
  • Offline Offline

  • Posts: 2377
  • Age: 30
  • Location: Danville, VA 👎
  • Last Login: February 21, 2020, 11:11:16 AM
Logged
I dont know whether to wind my ass or scratch my watch! - Jim Cornette

sprjus4

  • *
  • Offline Offline

  • Posts: 3482
  • Location: Hampton Roads, VA
  • Last Login: February 21, 2020, 11:01:44 PM
Re: North Carolina
« Reply #3377 on: February 07, 2020, 04:34:39 PM »

Built with a wide median and independently graded roadways, common for 1970s designs on rural Interstate highway.
For the most part, the 1980 Fayetteville Bypass has a consistent typical section maintaining a 93 foot median, though widens out on curves and at a few select locations. The other newer segment of I-95 from Kenly to Rocky Mount, completed 1979, has a consistent typical section maintaining a 60 foot median in areas, though in many areas has a much larger median with a tree-filled median, like you mentioned a common design in 1970s construction.
Logged

sprjus4

  • *
  • Offline Offline

  • Posts: 3482
  • Location: Hampton Roads, VA
  • Last Login: February 21, 2020, 11:01:44 PM
Re: North Carolina
« Reply #3378 on: February 08, 2020, 07:44:02 AM »

^ After looking into the I-95 widening project details closer, I was wrong about the southern section.

To clarify -
- The section from north of Fayetteville to I-40 begins in 2020 and will be completed by 2024. The $708.9 million project will widen 25 miles from 4 to 8 lanes.
- The section from south of Fayetteville to Lumberton was projected to begin in 2028, a $447.8 million project to widen 19 miles from 4 to 8 lanes. However, a grant awarded in November 2019 is planned to accelerate this project, and it extend it an additional 8 miles southward to I-74 along with raising the interstate in low-lying flood prone areas, notably areas that were underwater during Hurricane Florence in 2018. I've not been able to find any updated cost estimate for this most recent project, though will likely begin before 2028.

By ~2030, 52 miles or 29% of I-95 should be completed to 8-lanes.
Logged

LM117

  • *
  • Offline Offline

  • Posts: 2377
  • Age: 30
  • Location: Danville, VA 👎
  • Last Login: February 21, 2020, 11:11:16 AM
Re: North Carolina
« Reply #3379 on: February 11, 2020, 04:46:43 PM »

https://www.ncdot.gov/news/press-releases/Pages/2020/2020-02-11-ocracoke-sandbag-project.aspx

Quote
​OCRACOKE The N.C. Department of Transportation Wednesday will begin placing additional sand and sandbags along portions of N.C. 12 on Ocracoke Island. The project is designed to shore up four segments of the roadway damaged by Hurricane Dorian and a subsequent storm in November.

The project will involve placing more than 2,500 sandbags along 4,200 feet of roadway at the north end of the island. While no major traffic delays are anticipated, NCDOT will have traffic control in place to maintain a safe environment.

Contractors hope to have the project complete in three months, but the process is extremely weather-dependent. If completion is not possible by Mid-May, work will stop until after Labor Day in order to facilitate summertime traffic.
Logged
I dont know whether to wind my ass or scratch my watch! - Jim Cornette

LM117

  • *
  • Offline Offline

  • Posts: 2377
  • Age: 30
  • Location: Danville, VA 👎
  • Last Login: February 21, 2020, 11:11:16 AM
Re: North Carolina
« Reply #3380 on: February 13, 2020, 10:51:13 AM »

The ramp from I-40 East to Aviation Parkway (Exit 285) near Morrisville is scheduled to close for up to 60 days.

https://www.ncdot.gov/news/press-releases/Pages/2020/2020-02-13-i-40-aviation-pkwy-closures.aspx
Logged
I dont know whether to wind my ass or scratch my watch! - Jim Cornette

wdcrft63

  • *
  • Offline Offline

  • Posts: 627
  • Location: Durham, NC
  • Last Login: February 21, 2020, 06:40:47 PM
Re: North Carolina
« Reply #3381 on: February 13, 2020, 06:48:58 PM »

The ramp from I-40 East to Aviation Parkway (Exit 285) near Morrisville is scheduled to close for up to 60 days.

https://www.ncdot.gov/news/press-releases/Pages/2020/2020-02-13-i-40-aviation-pkwy-closures.aspx
The posted detour directs westbound drivers to go on to the next exit (Airport Boulevard), get off, and then come back eastbound to Aviation Parkway. I hope 98% of them will be smart enough to recognize that as silly: they can use northbound Airport Boulevard to access both the airport and and Aviation Parkway,
Logged

goobnav

  • *
  • Offline Offline

  • Posts: 280
  • Cannonball Run should start in Wilmington!

  • Age: 45
  • Location: Durham, NC
  • Last Login: February 21, 2020, 12:57:04 PM
Re: North Carolina
« Reply #3382 on: February 14, 2020, 07:53:05 AM »

The ramp from I-40 East to Aviation Parkway (Exit 285) near Morrisville is scheduled to close for up to 60 days.

https://www.ncdot.gov/news/press-releases/Pages/2020/2020-02-13-i-40-aviation-pkwy-closures.aspx
The posted detour directs westbound drivers to go on to the next exit (Airport Boulevard), get off, and then come back eastbound to Aviation Parkway. I hope 98% of them will be smart enough to recognize that as silly: they can use northbound Airport Boulevard to access both the airport and and Aviation Parkway,

How long have you lived here?  There are people who will still do this, remember, they have a hard enough time being on the same road but, having the street name change 3 times. 
Logged
Life is a highway and I drive it all night long!

LM117

  • *
  • Offline Offline

  • Posts: 2377
  • Age: 30
  • Location: Danville, VA 👎
  • Last Login: February 21, 2020, 11:11:16 AM
Re: North Carolina
« Reply #3383 on: February 14, 2020, 11:01:03 AM »

https://www.ncdot.gov/news/press-releases/Pages/2020/2020-02-14-duplin-county-ramps-closure.aspx

Quote
WARSAW The N.C. Department of Transportation will close two ramps at a Duplin County highway interchange for about a week and a half.

Between Feb. 17 and Feb. 26, the westbound entrance ramp to Interstate 40 and the eastbound exit ramp at N.C. 24 will be closed. During the closure, crews will rehab the bridge deck overlay.

Drivers heading eastbound from I-40 to N.C. 24 will be detoured to exit 369 and back west to the exit 364 exit. Drivers heading westbound from N.C. 24 to I-40 will be detoured east to exit 369 and back west to I-40 West.  The detours will be signed, and message boards will be in place to notify motorists of the closures.

Motorists should anticipate needing extra time for their commute and are urged to use caution when traveling in this area.
Logged
I dont know whether to wind my ass or scratch my watch! - Jim Cornette

ushighway421

  • *
  • Offline Offline

  • Posts: 7
  • Location: Julian NC
  • Last Login: February 14, 2020, 07:42:24 PM
Re: North Carolina
« Reply #3384 on: February 14, 2020, 07:06:21 PM »

https://en.wikipedia.org/wiki/Interstate_285_(North_Carolina)

ncdot wants to extend i-285 north of i-40 along us 52 to the i-74/i-274 interchange proposed for winston salem.

cant help but think, it would be better to have i-285 go around the west of the loop, starting from a brief interchange with i 40 and come back northeast to run on a small stretch of us 52 thru king, and it just be i-74/i-285 instead of three different interstate designations.
Logged

LM117

  • *
  • Offline Offline

  • Posts: 2377
  • Age: 30
  • Location: Danville, VA 👎
  • Last Login: February 21, 2020, 11:11:16 AM
Re: North Carolina
« Reply #3385 on: February 15, 2020, 08:42:06 AM »

Logged
I dont know whether to wind my ass or scratch my watch! - Jim Cornette

fillup420

  • *
  • Offline Offline

  • Posts: 226
  • Location: Exit 11B
  • Last Login: February 21, 2020, 11:02:08 PM
Logged

LM117

  • *
  • Offline Offline

  • Posts: 2377
  • Age: 30
  • Location: Danville, VA 👎
  • Last Login: February 21, 2020, 11:11:16 AM
Re: North Carolina
« Reply #3387 on: February 19, 2020, 11:14:40 AM »

https://www.ncdot.gov/news/press-releases/Pages/2020/2020-02-19-i-40-garner-rd-closure.aspx

Quote
​RALEIGH N.C. Department of Transportation contractors are planning closures on westbound Interstate 40 as part of the widening project from Southeast Raleigh to Clayton.

For the next two nights between midnight and 5 a.m., westbound I-40 traffic will be stopped for up to 30 minutes at a time as crews place the girders on the new East Garner Road bridge over the highway. Impending weather could push tomorrow night's work to Friday night.

As an alternate route, drivers should take Exit 306A (U.S. 70 West) to Jones Sausage Road to get back to I-40 West.

Drivers should allow extra time to navigate the alternate route and pay extra attention while driving through the work zone.
Logged
I dont know whether to wind my ass or scratch my watch! - Jim Cornette

LM117

  • *
  • Offline Offline

  • Posts: 2377
  • Age: 30
  • Location: Danville, VA 👎
  • Last Login: February 21, 2020, 11:11:16 AM
Re: North Carolina
« Reply #3388 on: February 20, 2020, 09:20:55 AM »

Regarding the Harvey Parkway extension project in Kinston, the Humphrey Road intersection on NC-58 will close permanently on Feb. 24. Humphrey Road will be cul-de-sac'ed near NC-58.

https://www.ncdot.gov/news/press-releases/Pages/2020/2020-02-20-lenoir-county-road-closure.aspx
Logged
I dont know whether to wind my ass or scratch my watch! - Jim Cornette

Dustin DeWinn

  • *
  • Offline Offline

  • Posts: 54
  • Location: NC
  • Last Login: February 21, 2020, 07:54:05 PM
Re: North Carolina
« Reply #3389 on: February 21, 2020, 09:54:06 AM »

Logged

sprjus4

  • *
  • Offline Offline

  • Posts: 3482
  • Location: Hampton Roads, VA
  • Last Login: February 21, 2020, 11:01:44 PM
Re: North Carolina
« Reply #3390 on: February 21, 2020, 10:03:06 AM »

Logged

 


Opinions expressed here on belong solely to the poster and do not represent or reflect the opinions or beliefs of AARoads, its creators and/or associates.