Author Topic: I-90 / Mass Pike Signing Work  (Read 61911 times)

PHLBOS

  • *
  • Offline Offline

  • Posts: 6547
  • Age: 53
  • Location: Greater Philly, PA
  • Last Login: July 17, 2019, 05:16:48 PM
Re: I-90 / Mass Pike Signing Work
« Reply #325 on: June 21, 2019, 09:10:06 AM »

Good to know. The two signs in the Street View image has been taken down the last time through the Weston interchange in early June. Was wondering if they were going to be replaced.
That would make sense.  Prior to last week, I was in the area during Memorial Day weekend and the old bridge-mounted signs were still there.  Although I'm a bit surprised that the new gantry & signs weren't already erected prior to the old signs being removed.  I guess the gantry's located too close to the overpass to allow for such.

Anyway, the old sign for I-95 (MA 128) southbound I believe were the last ones to list Cape Cod as a control destination/point for that route.

I was able to find a photo of said signs.

Those aren't the ones.  The ones I'm referring to are prior to one seeing those signs & have the route shield/direction cardinals, sans the TO 30 legend, arranged per my earlier description.  The BGS' I'm referring to are also taller; especially for the southbound panel.

Edited to add
A photo of the signs I was describing has since made it onto Facebook's BostonRoads page from one of the users here but not yet on the malmeroads.net site.  Hopefully, the above-link works for those who do not have a Facebook account.
« Last Edit: July 01, 2019, 08:58:39 AM by PHLBOS »
Logged
GPS does NOT equal GOD

bob7374

  • *
  • Offline Offline

  • Posts: 1107
  • Age: 55
  • Location: East Weymouth, Massachusetts
  • Last Login: July 15, 2019, 05:52:21 PM
    • Bob Malme's Road Pages
Re: I-90 / Mass Pike Signing Work
« Reply #326 on: July 01, 2019, 09:57:57 PM »

For those who can't access Facebook, here's the new overhead signs along the I-90/Mass Pike ramp to I-95:


That and photos of the new advance signs for the Weston exit eastbound are now up at:
http://www.malmeroads.net/mass21c/i90photos.html

SidS1045

  • *
  • Offline Offline

  • Posts: 870
  • Age: 68
  • Location: Stoneham MA
  • Last Login: July 16, 2019, 02:50:33 PM
Re: I-90 / Mass Pike Signing Work
« Reply #327 on: July 03, 2019, 02:34:11 PM »

Last evening I saw a few new signs on the eastbound approach to the I-95 exit, regarding the ban on transport of hazardous materials on the Pike east of I-95.  Too dark to get some photos, however.
Logged
"A nation of sheep will beget a government of wolves." - Edward R. Murrow

bob7374

  • *
  • Offline Offline

  • Posts: 1107
  • Age: 55
  • Location: East Weymouth, Massachusetts
  • Last Login: July 15, 2019, 05:52:21 PM
    • Bob Malme's Road Pages
Re: I-90 / Mass Pike Signing Work
« Reply #328 on: July 10, 2019, 12:43:43 PM »

I have posted new signage photos from the Mass Pike between Weston and Framingham, courtesy of Benjamin Long. They include new ramp signage, such at the split of the Pike off-ramp in Framingham:


and new ground mounted signage along the Pike such as this new version of the Trucker Advisory sign eastbound in Weston (notice there would be room for a future 123 exit number):


The remaining new photos are on my I-90/Mass Pike Photo Gallery:http://www.malmeroads.net/mass21c/i90photos.html

SignBridge

  • *
  • Offline Offline

  • Posts: 1287
  • Location: Long Island, New York
  • Last Login: July 17, 2019, 10:09:29 PM
Re: I-90 / Mass Pike Signing Work
« Reply #329 on: July 10, 2019, 08:40:42 PM »

Wow Bob, I'm surprised to see a brand new butterfly style sign gantry in the 21st Century! I didn't think anyone in the USA built those anymore. New York replaced all or most of theirs by the 1970's with full across the road gantries so errant drivers wouldn't be crashing into the pole.
Logged

roadman

  • *
  • Offline Offline

  • Posts: 3671
  • Age: 57
  • Location: Boston, MA
  • Last Login: July 17, 2019, 04:59:10 PM
Re: I-90 / Mass Pike Signing Work
« Reply #330 on: July 11, 2019, 10:41:52 AM »

Wow Bob, I'm surprised to see a brand new butterfly style sign gantry in the 21st Century! I didn't think anyone in the USA built those anymore. New York replaced all or most of theirs by the 1970's with full across the road gantries so errant drivers wouldn't be crashing into the pole.

Original project plans called for a full span structure across the ramps at this location, which was later deemed impractical to construct due to utility conflicts and other constraints.  The location is protected by an impact attenuator, so it's MUTCD compliant.
Logged
"And ninety-five is the route you were on.  It was not the speed limit sign."  - Jim Croce (from Speedball Tucker)

"My life has been a tapestry
Of years of roads and highway signs" (with apologies to Carole King and Tom Rush)

SidS1045

  • *
  • Offline Offline

  • Posts: 870
  • Age: 68
  • Location: Stoneham MA
  • Last Login: July 16, 2019, 02:50:33 PM
Re: I-90 / Mass Pike Signing Work
« Reply #331 on: July 11, 2019, 03:27:51 PM »

The 1/2-mile advance sign for exit 15 (westbound) has been replaced...with, if my eyes haven't deceived me, a mistake.  The EXIT ONLY arrow is pointing to the middle lane, not the right lane.
Logged
"A nation of sheep will beget a government of wolves." - Edward R. Murrow

SignBridge

  • *
  • Offline Offline

  • Posts: 1287
  • Location: Long Island, New York
  • Last Login: July 17, 2019, 10:09:29 PM
Re: I-90 / Mass Pike Signing Work
« Reply #332 on: July 11, 2019, 08:51:43 PM »

Thanks Roadman. That's interesting about the change in specs for the sign gantry. And yes, it is MUTCD compliant with the impact attenuator.
Logged

bob7374

  • *
  • Offline Offline

  • Posts: 1107
  • Age: 55
  • Location: East Weymouth, Massachusetts
  • Last Login: July 15, 2019, 05:52:21 PM
    • Bob Malme's Road Pages
Re: I-90 / Mass Pike Signing Work
« Reply #333 on: July 11, 2019, 10:30:49 PM »

The 1/2-mile advance sign for exit 15 (westbound) has been replaced...with, if my eyes haven't deceived me, a mistake.  The EXIT ONLY arrow is pointing to the middle lane, not the right lane.
If it's like the mistake they made with the 1/2 mile for the Newton/Watertown exit, they'll change the Exit (Arrow) Only tab to Exit Only (Arrow). From a live image on this evening's news, they may also have replaced the 1/2 mile advance heading east for Allston-Brighton, I may just have to check out the Boston to Weston section of the Pike this weekend.

Ben114

  • *
  • Offline Offline

  • Posts: 246
  • yep that's me

  • Age: 15
  • Location: far far away
  • Last Login: July 17, 2019, 10:17:31 PM
Re: I-90 / Mass Pike Signing Work
« Reply #334 on: July 14, 2019, 01:11:54 PM »

Found this on my way home from Buffalo yesterday. (yes this is GSV, I didn't take a picture)



This is approaching exit B3 on the Berkshire Connector, from the other side it looks just like a MassDOT sign.
Logged

shadyjay

  • *
  • Offline Offline

  • Posts: 1162
  • Age: 41
  • Location: Lwr CT River Valley
  • Last Login: July 17, 2019, 09:59:28 PM
Re: I-90 / Mass Pike Signing Work
« Reply #335 on: July 14, 2019, 07:12:16 PM »

This afternoon, returning from a weekend in New York, I traveled the 'pike from the NY state line out to Exit 10 (Auburn).  Yup, I did notice the above-photographed sign and quickly grabbed a shot of it.  I also noticed one remaining old Exit 5 sign (33/Chicopee) remaining, along with numerous regulatory-style signs that have still not been replaced yet.... or maybe they have but the sheating has been torn (speed limit signs).  Still a lot of faded merge and "lane ends" signs, old town line signs, and even some brown overpass labels.  The Phase III button copy at Exit 6, westbound, continues to live on, but with a new monotube bridge gantry behind it, one can only guess for how much longer.  I can't believe this project is still not finished. 

Photos from my Mass Pike drive can be found here (starting from the third row on this page, down...)
https://www.flickr.com/photos/shadyjay/albums/72157667478371052/page2

I hope to get further east in the weeks ahead.
Logged
My FLICKR page has gone PRO!  Road photos (and more) from throughout the Northeast...
https://www.flickr.com/photos/shadyjay/collections/72157657234163953/

Beeper1

  • *
  • Offline Offline

  • Posts: 379
  • Location: Western MA
  • Last Login: July 17, 2019, 10:33:27 PM
Re: I-90 / Mass Pike Signing Work
« Reply #336 on: July 14, 2019, 10:43:36 PM »

The Phase III button copy at Exit 6, westbound, continues to live on, but with a new monotube bridge gantry behind it, one can only guess for how much longer.  I can't believe this project is still not finished. 


That empty monotube gantry has been there since last October/November.  No idea what has happened but the western contract seems to have totally stalled.    The WB overhead assembly at Exit 10 in Auburn is still there as well.
Logged

roadman

  • *
  • Offline Offline

  • Posts: 3671
  • Age: 57
  • Location: Boston, MA
  • Last Login: July 17, 2019, 04:59:10 PM
Re: I-90 / Mass Pike Signing Work
« Reply #337 on: July 15, 2019, 09:12:02 AM »

Found this on my way home from Buffalo yesterday. (yes this is GSV, I didn't take a picture)



This is approaching exit B3 on the Berkshire Connector, from the other side it looks just like a MassDOT sign.

That's because it is a MassDOT sign.  Was installed as part of the I-90 "Go Live" AET implementation contract.
Logged
"And ninety-five is the route you were on.  It was not the speed limit sign."  - Jim Croce (from Speedball Tucker)

"My life has been a tapestry
Of years of roads and highway signs" (with apologies to Carole King and Tom Rush)

roadman

  • *
  • Offline Offline

  • Posts: 3671
  • Age: 57
  • Location: Boston, MA
  • Last Login: July 17, 2019, 04:59:10 PM
Re: I-90 / Mass Pike Signing Work
« Reply #338 on: July 15, 2019, 09:14:21 AM »

The Phase III button copy at Exit 6, westbound, continues to live on, but with a new monotube bridge gantry behind it, one can only guess for how much longer.  I can't believe this project is still not finished. 


That empty monotube single chord gantry has been there since last October/November.  No idea what has happened but the western contract seems to have totally stalled.    The WB overhead assembly at Exit 10 in Auburn is still there as well.

Corrected it for you.  In the sign support world, monotube refers to the large curved tubular gantries that are designed to look like a single piece.
« Last Edit: July 15, 2019, 12:13:51 PM by roadman »
Logged
"And ninety-five is the route you were on.  It was not the speed limit sign."  - Jim Croce (from Speedball Tucker)

"My life has been a tapestry
Of years of roads and highway signs" (with apologies to Carole King and Tom Rush)

bob7374

  • *
  • Offline Offline

  • Posts: 1107
  • Age: 55
  • Location: East Weymouth, Massachusetts
  • Last Login: July 15, 2019, 05:52:21 PM
    • Bob Malme's Road Pages
Re: I-90 / Mass Pike Signing Work
« Reply #339 on: July 15, 2019, 12:05:10 PM »

The 1/2-mile advance sign for exit 15 (westbound) has been replaced...with, if my eyes haven't deceived me, a mistake.  The EXIT ONLY arrow is pointing to the middle lane, not the right lane.
If it's like the mistake they made with the 1/2 mile for the Newton/Watertown exit, they'll change the Exit (Arrow) Only tab to Exit Only (Arrow). From a live image on this evening's news, they may also have replaced the 1/2 mile advance heading east for Allston-Brighton, I may just have to check out the Boston to Weston section of the Pike this weekend.
Here's a photo of the sign:


The 1-mile advance isn't much better. Photos of that sign and the new remaining overheads put between Newton and Allston-Brighton are on my I-90/Mass Pike Photo Gallery: http://www.malmeroads.net/mass21c/i90photos.html

SignBridge

  • *
  • Offline Offline

  • Posts: 1287
  • Location: Long Island, New York
  • Last Login: July 17, 2019, 10:09:29 PM
Re: I-90 / Mass Pike Signing Work
« Reply #340 on: July 15, 2019, 09:17:29 PM »

How the heck does something like that happen? And nobody catches it?
Logged

1

  • *
  • Online Online

  • Posts: 6973
  • UMass Lowell student

  • Age: 20
  • Location: MA/NH border
  • Last Login: Today at 06:53:41 AM
    • Flickr account
Re: I-90 / Mass Pike Signing Work
« Reply #341 on: July 15, 2019, 09:28:16 PM »

If it pointed to the right lane, it would imply that Exit 15B is exit only, while it should apply to Exit 15A.
Logged
Clinched

Traveled, plus:
US ⒔50
MA ⒐2⒉40.9⒐10⒎10⒐1⒒1⒚12⒎14⒈159
NH 27,111A(E),128; NY 366; GA 42,140; FL A1A; CT 32, VT 5A, QC 16⒉16⒌263

Flickr

SidS1045

  • *
  • Offline Offline

  • Posts: 870
  • Age: 68
  • Location: Stoneham MA
  • Last Login: July 16, 2019, 02:50:33 PM
Re: I-90 / Mass Pike Signing Work
« Reply #342 on: July 16, 2019, 02:49:17 PM »

If it pointed to the right lane, it would imply that Exit 15B is exit only, while it should apply to Exit 15A.

In that case, perhaps a small edit would be in order, as in "EXITS ONLY" or "EXITS 15B-A ONLY."  Not exactly MUTCD-compliant, but it would convey the correct message, with the arrow properly placed over the right lane.
Logged
"A nation of sheep will beget a government of wolves." - Edward R. Murrow

mrsman

  • *
  • Offline Offline

  • Posts: 2303
  • Age: 43
  • Location: Silver Spring, MD
  • Last Login: Today at 02:48:23 AM
Re: I-90 / Mass Pike Signing Work
« Reply #343 on: July 17, 2019, 05:20:42 PM »

If it pointed to the right lane, it would imply that Exit 15B is exit only, while it should apply to Exit 15A.

In that case, perhaps a small edit would be in order, as in "EXITS ONLY" or "EXITS 15B-A ONLY."  Not exactly MUTCD-compliant, but it would convey the correct message, with the arrow properly placed over the right lane.

One idea to fix it would be to only mention I-95 at this point.  A supplemental sign for exit 15B to convey that message separately.

Logged

jp the roadgeek

  • *
  • Offline Offline

  • Posts: 2897
  • Age: 43
  • Location: Outside the I-291 beltway
  • Last Login: Today at 04:12:45 AM
Re: I-90 / Mass Pike Signing Work
« Reply #344 on: July 17, 2019, 05:23:36 PM »

One idea to fix it would be to only mention I-95 at this point.  A supplemental sign for exit 15B to convey that message separately.

Good luck with that.  Getting a local to refer to that stretch as anything but 128 is harder than getting someone to call the new Thruway bridge between Tarrytown and Nyack anything but the Tappan Zee. 
Logged
Interstates I've clinched: 97, 290 (MA), 291 (CT), 291 (MA), 293, 295 (DE-NJ-PA), 295 (RI-MA), 384, 391, 395 (CT-MA), 395 (MD), 495 (DE), 610 (LA), 684, 691, 695 (MD), 695 (NY), 795 (MD)

SectorZ

  • *
  • Offline Offline

  • Posts: 924
  • Age: 41
  • Location: Tewksbury, MA
  • Last Login: July 17, 2019, 05:44:08 PM
Re: I-90 / Mass Pike Signing Work
« Reply #345 on: July 17, 2019, 05:44:40 PM »

One idea to fix it would be to only mention I-95 at this point.  A supplemental sign for exit 15B to convey that message separately.

Good luck with that.  Getting a local to refer to that stretch as anything but 128 is harder than getting someone to call the new Thruway bridge between Tarrytown and Nyack anything but the Tappan Zee.

The sign doesn't mention 128 in the first place, he meant removing the mention of 30 at exit 15B...
Logged

 