TCH104 Antigonish Bypass – 2015 Update
« on: September 06, 2015, 06:37:58 PM »

It’s been 3 years since Phase I of the TCH104 Antigonish Bypass opened in 2012 and it will be another year until Phase II is ready in Fall 2016.....extending an additional 7.5 km to Taylors Road.

This is the current start/end of Phase I just east of Exit 33 at Beech Hill Road. In the second photo.....this short 0.4km section connecting down the hill to the original alignment, including the overhead will be removed when the bypass in complete....then returned to a green field.







New alignment (below) between Phase 1 and II (overhead sign above is to the right)





This section of TCH104 cutting across the photo (below) will be removed, becoming Truck 4 and relocated to the overpass structure in the distance.











Below is the new structure at Exit 34 in Lower South River. It will be the jct with Route 316.






« Last Edit: September 07, 2015, 06:30:25 AM by ghYHZ »
Logged

SignGeek101

  • *
  • Offline Offline

  • Posts: 1866
  • Winnipeg sign geek and civil engineering student.

  • Age: 23
  • Location: Winnipeg
  • Last Login: July 19, 2018, 09:05:19 PM
Re: TCH104 Antigonish Bypass – 2015 Update
« Reply #1 on: September 06, 2015, 07:29:43 PM »

Nice pictures. I always love seeing road construction photos, so thanks. Is there a phase III or is this it for the 104 for now?

ghYHZ

  • *
  • Online Online

  • Posts: 568
  • Last Login: Today at 07:29:49 PM
Re: TCH104 Antigonish Bypass – 2015 Update
« Reply #2 on: September 06, 2015, 07:51:10 PM »

Nice pictures. I always love seeing road construction photos, so thanks. Is there a phase III or is this it for the 104 for now?

Phase II is all for now. Probably the next section will be to fill in the 40 km gap between Sutherlands River and the start of Phase I west of Antigonish. It’s being discussed as a possible Toll Highway.....but probably several years away
Logged

SignGeek101

  • *
  • Offline Offline

  • Posts: 1866
  • Winnipeg sign geek and civil engineering student.

  • Age: 23
  • Location: Winnipeg
  • Last Login: July 19, 2018, 09:05:19 PM

 


Opinions expressed here on belong solely to the poster and do not represent or reflect the opinions or beliefs of AARoads, its creators and/or associates.