AARoads Forum

Please login or register.

Login with username, password and session length

Author Topic: Looking Back at Plans For The Mud Island Expressway in Memphis  (Read 540 times)

MikeTheActuary

  • *
  • Offline Offline

  • Posts: 646
  • Location: Poquonock CT / Memphis TN / Montréal QC
  • Last Login: Today at 03:02:40 PM

One of the blogs I follow, "Creme de Memph" has assorted articles on the development of Memphis.

The second part in a series looking at Mud Island was just released.  It goes into a little bit of detail describing the never-realized plans for a freeway connecting the ghost ramps at the end of the Hernando Desoto Bridge to the TN 300 spur, a Riverside Expressway (instead of Riverside Drive), and a couple of very early versions of a map I once had stuck to my bedroom wall illustrating the long-range plans of the Memphis/Shelby County freeway system:  https://cremedememph.blogspot.com/2018/06/mud-island-history-2.html
Logged

 


Opinions expressed here on belong solely to the poster and do not represent or reflect the opinions or beliefs of AARoads, its creators and/or associates.