AARoads Forum

Please login or register.

Login with username, password and session length
Advanced search  

News:

New rules for political content in signatures and user profiles. See this thread for details.

Author Topic: Needed improvements coming to I-64, 71 and 265 (Louisville)  (Read 861 times)

jnewkirk77

  • *
  • Offline Offline

  • Posts: 250
  • Location: Owensboro, KY
  • Last Login: May 21, 2019, 10:53:52 PM
Needed improvements coming to I-64, 71 and 265 (Louisville)
« on: April 28, 2019, 08:55:31 PM »

It's gonna cost $180 million and take 4 years, but these interchanges need help, and more lanes on I-71 and I-265 will be great, too.

https://www.whas11.com/article/news/local/kentuckys-180-million-project-aims-to-improve-safety-on-major-interstates/417-28c9f239-dd81-4b59-9502-cc433d8981d6
Logged

ilpt4u

  • *
  • Offline Offline

  • Posts: 1031
  • Location: Southern IL
  • Last Login: Today at 01:18:11 PM
Re: Needed improvements coming to I-64, 71 and 265 (Louisville)
« Reply #1 on: April 29, 2019, 12:31:38 AM »

I would like to see a bit more than a C/D lane added onto I-71 South @ I-265 Interchange...

Not saying it needs to go Full Stack, but a Flyover or two wouldn’t hurt vs the current Cloverleaf

Article also says I-64/I-265 Interchange will be reconstructed, but does not mention any possible design changes, from its current Cloverleaf
Logged

jnewkirk77

  • *
  • Offline Offline

  • Posts: 250
  • Location: Owensboro, KY
  • Last Login: May 21, 2019, 10:53:52 PM
Re: Needed improvements coming to I-64, 71 and 265 (Louisville)
« Reply #2 on: April 29, 2019, 09:03:29 AM »

The whole works is going to be a design-build project, so I anticipate there will be details to come. But I agree, if it's going to be done, do it right and put in flyovers.
Logged

seicer

  • *
  • Offline Offline

  • Posts: 1259
  • Last Login: Today at 05:50:06 PM
Re: Needed improvements coming to I-64, 71 and 265 (Louisville)
« Reply #3 on: April 29, 2019, 09:20:34 AM »

I-64 and I-265 interchange improvements have four alternatives which are not cloverleaves: https://transportation.ky.gov/DistrictFive/Pages/Interstate-64-at-Interstate-265-Interchange-Reconstruction.aspx

Looking at the traffic counts, the heaviest movements for the I-71 and I-265 interchange is the I-71 SB to I-265 movement. A collector/distributor lane is ideal for this to separate out traffic from the mainline. I'm not sure that a full rebuild is yet warranted, given that the I-65/265 traffic levels have not yet stabilized.
Logged

hbelkins

  • *
  • *
  • Offline Offline

  • Posts: 13128
  • It is well, it is well, with my soul.

  • Age: 57
  • Location: Kentucky
  • Last Login: May 22, 2019, 10:13:18 PM
    • Millennium Highway
Re: Needed improvements coming to I-64, 71 and 265 (Louisville)
« Reply #4 on: April 29, 2019, 10:01:59 PM »

Biggest need is reconstruction of the 64/265 cloverleaf.

Everything else, including all of this being folded into one big design/build project, is a waste when compared to other needs around the state, and is (in my personal opinion) being done for political reasons since this is a gubernatorial election year.
Logged

jnewkirk77

  • *
  • Offline Offline

  • Posts: 250
  • Location: Owensboro, KY
  • Last Login: May 21, 2019, 10:53:52 PM
Re: Needed improvements coming to I-64, 71 and 265 (Louisville)
« Reply #5 on: May 01, 2019, 01:00:42 AM »

Biggest need is reconstruction of the 64/265 cloverleaf.

Everything else, including all of this being folded into one big design/build project, is a waste when compared to other needs around the state, and is (in my personal opinion) being done for political reasons since this is a gubernatorial election year.

Hadn't really looked at it that way, but you may well be right. I'd much rather see some of that money go toward getting the cloverleaves on 165 rebuilt.
Logged

seicer

  • *
  • Offline Offline

  • Posts: 1259
  • Last Login: Today at 05:50:06 PM
Re: Needed improvements coming to I-64, 71 and 265 (Louisville)
« Reply #6 on: May 01, 2019, 08:35:47 AM »

Biggest need is reconstruction of the 64/265 cloverleaf.

Everything else, including all of this being folded into one big design/build project, is a waste when compared to other needs around the state, and is (in my personal opinion) being done for political reasons since this is a gubernatorial election year.

Hadn't really looked at it that way, but you may well be right. I'd much rather see some of that money go toward getting the cloverleaves on 165 rebuilt.

The toll booths? Otherwise, I-165 gets very little traffic to justify rebuilding the one at the WK Parkway.
Logged

jnewkirk77

  • *
  • Offline Offline

  • Posts: 250
  • Location: Owensboro, KY
  • Last Login: May 21, 2019, 10:53:52 PM
Re: Needed improvements coming to I-64, 71 and 265 (Louisville)
« Reply #7 on: May 01, 2019, 10:58:58 PM »

Biggest need is reconstruction of the 64/265 cloverleaf.

Everything else, including all of this being folded into one big design/build project, is a waste when compared to other needs around the state, and is (in my personal opinion) being done for political reasons since this is a gubernatorial election year.

Hadn't really looked at it that way, but you may well be right. I'd much rather see some of that money go toward getting the cloverleaves on 165 rebuilt.

The toll booths? Otherwise, I-165 gets very little traffic to justify rebuilding the one at the WK Parkway.

That's what I meant. The 165/WK interchange got overhauled last year, so it's good.
Logged

hbelkins

  • *
  • *
  • Offline Offline

  • Posts: 13128
  • It is well, it is well, with my soul.

  • Age: 57
  • Location: Kentucky
  • Last Login: May 22, 2019, 10:13:18 PM
    • Millennium Highway
Re: Needed improvements coming to I-64, 71 and 265 (Louisville)
« Reply #8 on: May 02, 2019, 01:54:23 PM »

That's what I meant. The 165/WK interchange got overhauled last year, so it's good.

I never quite figured out what they were doing there, other than repaving some of the ramps. I drove through there a couple of times while the work was ongoing and never knew why they needed to have extended closures of some of the ramps.
Logged

jnewkirk77

  • *
  • Offline Offline

  • Posts: 250
  • Location: Owensboro, KY
  • Last Login: May 21, 2019, 10:53:52 PM
Re: Needed improvements coming to I-64, 71 and 265 (Louisville)
« Reply #9 on: May 03, 2019, 09:57:05 AM »

That's what I meant. The 165/WK interchange got overhauled last year, so it's good.

I never quite figured out what they were doing there, other than repaving some of the ramps. I drove through there a couple of times while the work was ongoing and never knew why they needed to have extended closures of some of the ramps.

I know they extended the taper of the ramps, and it looks like to me they widened the loops a little bit. It really didn't need much work to be brought up to standard.
Logged

hbelkins

  • *
  • *
  • Offline Offline

  • Posts: 13128
  • It is well, it is well, with my soul.

  • Age: 57
  • Location: Kentucky
  • Last Login: May 22, 2019, 10:13:18 PM
    • Millennium Highway
Re: Needed improvements coming to I-64, 71 and 265 (Louisville)
« Reply #10 on: May 03, 2019, 01:00:40 PM »

That's what I meant. The 165/WK interchange got overhauled last year, so it's good.

I never quite figured out what they were doing there, other than repaving some of the ramps. I drove through there a couple of times while the work was ongoing and never knew why they needed to have extended closures of some of the ramps.

I know they extended the taper of the ramps, and it looks like to me they widened the loops a little bit. It really didn't need much work to be brought up to standard.

I don't know what the most-frequently-used movement is at that interchange, but I wonder if those improvements have to do with the WK and Natcher I-165 now being signed as an alternate to I-65.
Logged

jnewkirk77

  • *
  • Offline Offline

  • Posts: 250
  • Location: Owensboro, KY
  • Last Login: May 21, 2019, 10:53:52 PM
Re: Needed improvements coming to I-64, 71 and 265 (Louisville)
« Reply #11 on: May 05, 2019, 11:02:23 AM »

That's what I meant. The 165/WK interchange got overhauled last year, so it's good.

I never quite figured out what they were doing there, other than repaving some of the ramps. I drove through there a couple of times while the work was ongoing and never knew why they needed to have extended closures of some of the ramps.

I know they extended the taper of the ramps, and it looks like to me they widened the loops a little bit. It really didn't need much work to be brought up to standard.

I don't know what the most-frequently-used movement is at that interchange, but I wonder if those improvements have to do with the WK and Natcher I-165 now being signed as an alternate to I-65.

I'm not sure either, but I know at the time I drive through every night, I see a fair number of vehicles going northbound to westbound, as well as eastbound to southbound.
Logged

CardInLex

  • *
  • Offline Offline

  • Posts: 24
  • Location: Louisville, KY
  • Last Login: Today at 04:54:35 PM
Logged

 


Opinions expressed here on belong solely to the poster and do not represent or reflect the opinions or beliefs of AARoads, its creators and/or associates.